Assessment of Risk Management Practices of CM Enterprise: The Need for an Enterprise-level Risk Management Framework (CM기업 현장운영 리스크 관리 실태 분석을 통한 효율적 관리 방안 제시)

  • Park, Kyungmo;Lee, Hyun Woo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.66-73
    • /
    • 2014
  • The Korean construction industry has been severely impacted by the 2008 global financial crisis, which resulted in a significant reduction in the overall contract amount. For survival, many construction management (CM) companies had to adapt a strategy of lowering bid prices to maintain their competitiveness. As a result of the strategy, companies faced a number of issues including their decreased capability in risk management. However, most risk management-related studies focused on construction risk management, yet these studies lacked consideration of enterprise-level risk management practices. To fill the gap, the objectives of the present study are (1) to investigate, the risk management practices of Korean CM companies, (2) to identify factors that determine efficient enterprise-level risk management practices, and (3) to propose a module for the development of enterprise-level risk management. Lastly, the efficiency of the proposed development module was validated by using a survey.

Risk Influencing Factors in Performance of River Disaster Prevention Project (하천재해예방사업의 성과에 미치는 리스크 영향요인)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.417-428
    • /
    • 2020
  • The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.

A Model of the Risk Response Repeat Process in the Construction Project (건설공사 위험대응 반복 프로세스 모델)

  • Kim Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.107-114
    • /
    • 2002
  • Recently, a few major construction companies in Korea have a growing interests to the risk management system, and they are trying to apply it to their construction projects. However, the existing methodologies to be applied to the foreign public projects are not proper to the construction environments due to its adaptabilities, that has one time process and heavily depends on personal judgement. The purpose of this paper is to propose a risk response process in consideration of the residual risks, which would be more adaptable and practical in the construction environment, overcoming the current obstacles to be mentioned above. This process has systematic repeat process until the residual risks go down to the risk thresholds based on the efficiency of specific response strategy.

The Effect of Construction Safety Supervision System on Risk Control and Reduction (건설안전감리제도가 위험제어 및 절감에 미치는 영향)

  • Lim, Jin-Sang;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.3
    • /
    • pp.1-9
    • /
    • 2018
  • This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.

Risk Assessment Method for Activities of Apartment Construction (공동주택 건축공사 단위작업의 위험성 평가 방법)

  • Park, Sungpyo;Choi, Jae-Wook;Lee, Chansik
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

Analysis of Effect of Risk Factors on the Success of Risk Management (리스크요소가 리스크관리 성공에 미치는 영향 분석 연구)

  • Chung, Yeon-Kyo;Chung, Byeong-Hwa
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.443-449
    • /
    • 2014
  • Although risk reduction of construction projects have been continued, the risk of fatal accident has been increased. The purpose of this paper is to reduce the cause of the essential risk factors. Questionnaire survey of construction companies in domestic was conducted and the Multiple Regression Analysis of statistics program was used to grasp effective factors among the risk factors of construction companies in domestic. Development of the essential risk factors and its application to projects could lead to improvements such as compression of network, reduction of cost, improvement of quality and reduction of safety accident.

Developing of Construction Project Risk Analysis Framework by Claim Payout and its Application

  • Kim, Ji-Myong;Park, Young Jun;Kim, Young-Jae;Yu, YeongJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.192-194
    • /
    • 2015
  • The growing size and complex process in construction project recently leads to increase risk and the losses as well. Even though researchers have identified the major risk indicators, there is lack of comprehensive and quantitative research for identifying the relationship between the risk indicators and economic losses associated with construction projects. To address this shortage of research, this study defines risk indicators and create a framework to assess the influence of economic losses from the indicators. An insurance company's claim payout record was accepted as the dependent variable to reflect the real economic losses. Based on the claims, we categorized the causes and results of accidents. To establish framework, built environment vulnerability indicators and geographical vulnerability indicators were employed as the risk indicators. A Pearson correlation analysis was adopted to validate the relationship with loss ratio and risk indicators. Consequently, this framework and its results may offer significant references for under writers of insurance companies and loss prevention activities.

  • PDF

Feasibility of Applying Mixed-Reality to Enhancing Safety Risk Communication in Construction Workplaces

  • Olorunfemi, Abiodun;Dai, Fei;Peng, Weibing
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.225-234
    • /
    • 2017
  • Mixed-reality technologies have proven to be valuable in many architecture, engineering and construction / facilities management (AEC/FM) applications. However, its potential of being adapted to facilitate hazard identification and risk communication in construction workplaces has yet to be fully explored. This paper makes an attempt to evaluate the feasibility of applying mixed-reality to enhancing safety risk communication in construction workplaces. Experiments have been designed in which Microsoft HoloLens® together with a developed application will be used to intervene in the practice of jobsite risk communication. A cross-sectional survey will then be followed to examine the effectiveness and acceptability of this technology through analysis on data collected from participants in the construction industry. The preliminary results show that this emerging HoloLens® technology, compared to the traditional communication methods (i.e., phone calls, walking up people and talk, and video conferencing), facilitates accurate, prompt safety communication on construction sites. Such findings signify the potential of applying mixed-reality to safety performance enhancement in the construction industry.

  • PDF

Development of Risk Assesment Index for Construction Safety Using Statistical Data (통계자료를 활용한 건설안전 위험도 평가지수 개발)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.361-371
    • /
    • 2019
  • In 2017, the ratio of the number of victims and deaths in the construction industry was the highest with 25.2% and 29.6%, respectively. Especially, as safety accidents at construction sites continue to increase, the economic loss is greatly increased too. Therefore, in order to prevent safety accidents in the construction work, the safety risk assessment index by type of construction was developed, and the main results of this study are as follows. First, 17 factors related to safety accidents at construction sites were derived through survey and interview survey, and this study suggested 9 items(process, type of construction, progress rate, contract amount, number of floors, safety education, working days and weather) throughout the expert advisory meeting. Second, the risk assessment index for safety accidents was developed based on the ratio and intensity of safety accidents. Third, to verify the risk assessment model, the construction safety risk assessment index by type of construction was derived by surveying and analyzing the statistics of the construction accident. In addition, the risk strength was calculated by dividing human damage caused by construction safety accidents into those killed and injured. The risk assessment index based on the frequency and intensity of safety accidents by type of construction is expected to be utilized as basic data when assessing the risk of similar projects in the future.

Scenario Planning and Risk Failure Mode Effect and Analysis (RFMEA) based Management

  • Paul, Virendra Kumar;Basu, Chaitali
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.24-29
    • /
    • 2016
  • This paper elaborates the significance of scenario planning in risk management, and presents an integrated approach which takes into account the 'Risk Events' derived from scenario planning for risk prioritisation. This research integrates scenario planning with Risk Failure Mode and Effect Analysis (RFMEA) through examples from construction litigations of project schedule and cost overrun cases as a simplified approach to project risk management. The proposed methodology incorporates scenarios developed from realistic events of dispute and arbitration cases from construction projects, and thereby increasing potential to foresee risks and their effects well in advance. The results from this methodology shall be validated against outcome of survey study conducted by KPMG-PMI (2013) on project schedule and cost overruns that was based on Ministry of Statistics and Programme Implementation (MoSPI) Project Monitoring data for 2012-13.