• 제목/요약/키워드: Construction Project Performance

검색결과 953건 처리시간 0.033초

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권1호
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

Measuring Performance to Engage the Extended Project Team in Construction

  • Bal, Menoka;Bryde, David
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.1-10
    • /
    • 2015
  • In construction, stakeholders of extended project team play a key role in the overall project performance. Successful integration of stakeholders demands for good management practices at strategic, operational and project levels. Targets and measures to improve the stakeholder performance encourage the creativity and willingness of stakeholders of extended project team to develop the better ways to achieve the project objectives. This paper presents a generic descriptive method, showing how stakeholder's ability and influence impacts on project performance in the construction sector. The findings of a series of interviews with key informants are presented and the following main conclusion is drawn: improving project performance through stakeholder's contribution and measuring their performance can strengthen the project performance. This innovative approach which redefines the process of improving the project performance in construction projects will be of interest to those who intend to manage the projects in practice as well as to those who interested in advancing theory.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • 토지주택연구
    • /
    • 제11권4호
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

10-10 Project Campaign: 10 Input Measures Influencing Project Outcomes

  • Choi, Jiyong;Kang, Youngcheol;Yun, Sungmin;Mulva, Stephen;Oliveira, Daniel
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.200-204
    • /
    • 2015
  • This paper presents 10 input measures influencing project outcomes. Construction Industry Institute (CII), a consortium of more than 130 project owner and contractor companies, has collected project-level data for over 20 years. Recently, CII has developed a new system measuring project-level performance and factors presumably influencing project performance. The system, called 10-10, collects data for 10 input and 10 output measures for capital projects. The input measures include planning, organizing, leading, controlling, design efficiency, human resources, quality, sustainability, supply chain, and safety. This paper provides theoretical background for these measures. Although the input measures have been known to impact on project outcomes such as cost and schedule, there has been no study quantitatively evaluating how they are operated in the construction industry. This study contributes to revealing the current status of their uses, which will be helpful in establishing strategies improving construction project performance.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

건설산업에서 프로젝트관리오피스(PMO)와 프로젝트성과의 영향관계 분석: PM리더십 조절효과 중심으로 (Analyzing the Influential Relationship between PMO and Project Performance in Construction Industry: Focusing on Moderation Effect of PM Leadership)

  • 이헌창;박소현;김승철
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.133-145
    • /
    • 2021
  • Recently, the importance of project management has increased due to the scale and complexity of the construction projects. Therefore, this study conducted a survey on construction companies and related public institutions to verify the relationship between the role of the Project Management Office(PMO) and PM leadership for project performance. Based on this, the effect of the PMO role on the project performance was identified and the moderating effect of PM leadership was analyzed. As a result, first, the role of the PMO was found to have an influential on the project performance. Second, the PM leadership was verified to has a moderating effect in the relationship between the PMO role and the project performance. The purpose of this study is to analyze the influential of the role of PMO on project performance in the construction industry to suggest the necessity of PMO in the construction industry and the need to adopt PMO in large-scale construction projects and analyze the moderating effect of PM leadership on project performance.

위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구 (A Study on the Effects of Risk Perception and Opportunism on the Project Performance)

  • 윤창수;조동혁
    • 품질경영학회지
    • /
    • 제50권1호
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.