• Title/Summary/Keyword: Construction Project Information System

Search Result 817, Processing Time 0.031 seconds

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

A Successful Example of the PMIS to Dongnam Distribution Complex Project using TPMS(Total Project Management System) of the GS E&C (GS건설 TPMS를 통한 동남권유통단지 이주전문상가 현장 PMIS 성공사례)

  • Lee, Heung-Won;Park, Chan-Jeong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.129-134
    • /
    • 2007
  • In 1996, GS E&C became the first in the industry to adopt a Project Management System using EVM(Earned Value Management) to link schedule with profit/loss. In 2006, the TPMS(Total Project Management System) was completed by adding the concept of Lean Construction and JIT(Just In Time) to the Project Management System. This was done with the purpose of reducing waste and creating optimal work processes. This has been implemented on all sites and has enabled drastic increase of productivity. The portal provides customized information to the client, inspector and subcontractor personnel. Since various parties are receiving information that suits their requirements and is easy to use, usage has increased and since they are on the same platform, quick decisions and information sharing is possible. The purpose of the PMIS's success model in construction projects, this paper tests and proves the TPMS's efficiency and productivity to Dongnam Distribution Complex project.

  • PDF

Action Research: the Use of Enterprise Resource Planning System in Construction Engineering and Project Management

  • Chan, Eric W.L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.18-27
    • /
    • 2011
  • Although information communication technology (ICT) is long regard as very useful tool in today's construction engineering and project management environment, organizations must not only operate based upon its original setting, but also requires on-going observation, additional features and fine-tuning actions before the desirable outcome can be achieved. However, it is a very common phenomenon that organizations purchase the licensed "off-the-shelf-software" package and customize it to suit their own business need. Due to the incapability of such software and inefficient customization, the possible result is making that ICT tool not user-friendly and sometimes the whole system becomes obsolete. The purpose of this paper is to review and report those actions taken (between February 2006 and December 2010) by a construction organization to enhance the performance of its Enterprise Resource Planning (ERP) system launched in December 2002. Such actions include: improving data inputting method; removing the transition bottleneck; introducing crystallization function; revising the organization's "Delegation and Limits of Authority"; publishing the "League Table" amongst users; integrating the 3D Mode into the system and upgrading hardware. Whilst the ultimate goals of such system are well beyond the time limit of this research study, an obvious interim result, achieved by this case studied organization, was winning a landmark project worth US$500 million after the ERP system was functioned properly and effectively. Their experience and success becomes an exemplar which can be borrowed by those companies, from managerial perspectives and as a roadmap, planning to adopt information technology (IT) strategy and use ICT tool in the construction engineering and project management framework. Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

A STUDY ON DEVELOPING DECISION SUPPORT MODULES OF iPMIS(INTELLIGENT PROGRAM MANAGEMEN INFORMATION SYSTEM) FROM ONTOLOGICAL PERSPECTIVE

  • Jae-Bok Lim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.717-724
    • /
    • 2009
  • Most recent programs in and out of the country are related to urban renewal projects. Contemporary project management information systems have been developed was to manage single or multiple projects focusing on their construction phase, and those have limitations to apply to large-scale complicated mega projects. So, this study explain the core concept of decision support modules for iPMIS (Intelligent Program Management Information System) and its major functions to support project owner and participants by introducing ontology in the web environment. This study confined the scope of research to the planning phase of urban environment improvement projects. Ontological logic structure and relation about planning works is essential parts and three functions to implement decision support module are developed.

  • PDF

An Evaluation Model for the Expected Value of the Construction Project Management Information System (건설관리 업무의 정보시스템화 기대가치 평가 모델)

  • Hwang In-Ae;Yoo Jung-Ho;Song Sang-Hoon;Yoo Won-Hee;Park Jong-Won;Kim Woo-Young;Lee Hyun-Soo;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.541-544
    • /
    • 2003
  • The Information System(IS) planning for construction project management must be performed through decomposing the construction management business process upon considering the information technology in a construction company. Following this background, this paper proposes a model for evaluating the expected value of IS planning for construction project management. The model is made to analyze the effectiveness and to evaluate the opportunity of IS planning for task and information, then finally to quantify the value. Lastly, this model can be used to plan IS for construction project management.

  • PDF

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

DEVELOPMENT OF A WEB-BASED GEO-SPATIAL INFORMATION SYSTEM FOR THE ANALYSIS AND EVALUATION OF SOIL DATA

  • YongGu Jang;SangHoon Lee;HoYun Kang;InJoon Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1396-1403
    • /
    • 2009
  • The Ministry of Construction and Transportation (MOCT) has been constructing a nationwide soil information DB since 2000, as basic data for the construction of 'underground geographical information,' a project under the 2nd National Geo-spatial Information System (NGIS) master plan. The inputted soil information includes not only underground conditions such as the layer depth, type, color, and groundwater level, but also engineering information that can be applied to construction work design, such as on the standard penetration test and the compression test. It is difficult to use this information in soil analysis and design, however, because only the test results are currently available. A web-based geo-spatial information system was developed in this study to facilitate the effective application of the soil information database (DB). First, the space information, layer information, and engineering test information were loaded from the soil information DB in real time, and the earth volume, bearing capacity, and settlement were calculated to develop a web client that will evaluate the ground softness and liquefaction. It seems that the soil information DB can be actively applied to the planning and design of construction works using this system.

  • PDF