Comparative Analysis of Wastewater Management Technologies for Construction Sites (건설사업장의 수질관리 기술 적용사례 비교분석)

  • Yi, JongChan;Koo, Jakon
    • KIEAE Journal
    • /
    • v.13 no.2
    • /
    • pp.157-162
    • /
    • 2013
  • To deal with the water pollution arising from the construction site, this study raises the issues of management and laws and it suggest the efficient way to reduce water pollution by through the case studies. In order to study, seven cases were selected from "Construction Environmental Management Best Practice Competition" co - sponsored by Construction Association of Korea and Construction Environment Association. As a study result, there are problems that depending on the characteristic of the construction site environment simple alone settling facilities can not handle muddy and dirty water generated by the construction site. However, when the construction site applied improved water pollution control facilities with reflecting the characteristic of muddy and dirty water. The problem can be solved moreover it can achieve exceeded emission standard. Therefore new regulations and management with water pollution control facilities considering characteristic of environment is needed to cope with water pollution arising from the construction site.

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

MEDIATION MECHANISM FOR CONSTRUCTION DISPUTE RESOLUTION IN TAIWAN

  • Chun-Yi Hwang;Nie-Jia Yau
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.357-363
    • /
    • 2011
  • Mediation has long been praised as one of effective dispute resolution methods in the area of construction law. Article 85-1 of the Taiwan Government Procurement Act was amended and promulgated by presidential decree on July 4, 2007. The second paragraph of the Article elaborates explicitly, "In the event that the application for mediation referred to in the preceding paragraph is made by the supplier, the agency may not object to such application." Beyond that, if an unsuccessful mediation of a construction dispute is due to the agency's disagreeing with the proposal or resolution for mediation proposed by the Complaint Review Board for Government Procurement ("CRBGP"), the agency may not object to the arbitration filed by the supplier. It undoubtedly reinforces the importance of the mediation-arbitration procedure. Accordingly, this paper elaborates on the mediation mechanism in Taiwan in the framework of construction disputes first. After that, dispute resolution of a local public work case is provided to demonstrate the practice of construction mediation in Taiwan. Lastly, this study proposes suggestions on applying mediation to ease similar subsequent cases.

  • PDF

A Study on the Experimental Sound Transmission Loss of Wall-Body in Song Practice Room (노래연습실 벽체의 투과손실에 관한 실험적 연구)

  • Yun, Jae-Hyun;Ju, Duck-Hoon;Kim, Jae-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.221-225
    • /
    • 2007
  • Recently, on account of stress relief and settlement of a healthy drinking culture, many people are visiting a song practice room. In case of such song practice room, since the mechanical voice through a loud accompaniment-music and microphone is on using, there has made a very loud noise, and it influences a lot to the adjacent other space and song practice room booth. Consequently, from the designing stage an efficient measures for soundproof and sound-insulation should be arranged. However, as most of the song practice room wall-bodies that already built up or under construction step were constructed merely with consideration on an interior-wise factor only, it is suffering at the soundproof and sound-insulation. Reflecting such viewpoint, this Study has measured Sound Transmission Loss on the subject for the song practice room wall-body recently built up, and based on the actually measured data, by practice of comparison?analysis on it using various evaluation methods, would intends to present a fundamental material for establishment an efficient sound-insulation measure.

  • PDF

Conflict Avoidance in Construction Projects: Six 'C' Rescue Factors

  • Acharya Nirmal Kumar;Lee Young-Dai;Kim Sa-Myeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.193-204
    • /
    • 2005
  • Conflict is aroused when different people having different interest work together for fulfilling same the objectives. As the construction field is large, complex, volatile and requires tremendous capital, there are always greater challenges and possibility of risks of conflicts. Poor management practices in construction site and trying to protect risks and threats by contracting parties are the cited sources of the construction conflicts. The best management practice is to resolve the problems before these cultivate as conflicts. This paper has identified six dispute avoidance factors-Convince, Coordination, Consideration, Compromise, Consolation and Coercion. Six 'C' factors described in this paper are the mantra (formula) to execute a conflict free construction project. The conflict avoidance factors have been verified through a successfully executed project called TEVT development project (Technical Education and Vocational Training) during 1993-1998 in Nepal. The results show that the six 'C' factors 'C' considered during the implementation of the project, construction conflicts would be controlled or minimized effectively.

Formwork System Selection Model for Tall Building Construction Using the Adaboost Algorithm

  • Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.523-529
    • /
    • 2011
  • In a tall building construction with reinforced concrete structures, the selection of an appropriate formwork system is a crucial factor for the success of the project. Thus, selecting an appropriate formwork system affects the entire construction duration and cost, as well as subsequent construction activities. However, in practice, the selection of an appropriate formwork system has depended mainly on the intuitive and subjective opinion of working level employees with restricted experience. Therefore, in this study, a formwork system selection model using the Adaboost algorithm is proposed to support the selection of a formwork system that is suitable for the construction site conditions. To validate the applicability of the proposed model, the selection models Adaboost and ANN were both applied to actual case data of tall building construction in Korea. The Adaboost model showed slightly better accuracy than that of the ANN model. The Adaboost model can assist engineers to determine the appropriate formwork system at the inception of future projects.

Performance Management System for Benchmarking in Construction Companies

  • You-Jin, Jang;Moon-Seo, Park;Hyun-Soo, Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.935-941
    • /
    • 2009
  • In competitive society, performance management is an essential element of business success. Despite the importance of performance management, it has not been widely implemented in construction companies. In the recent years, construction companies have become more aware of its need to identify, implement, and sustain performance improvements more systematically. Thus, the objective of this paper is to develop performance management system (PMS) for construction companies. The roles of performance management system is not only measuring performance but also offering guidance to improve performance. Therefore, PMS needs benchmarking process that provides Best Practice and new knowledge. This paper investigates the case of PMSs in UK, USA, Brazil, and Chile and discusses the lessons learned. To overcome the limitations of existing PMSs, new performance measurement framework, in form of 'Construction' BSC, is proposed. Based on the 'Construction' BSC, key performance indicators are derived and methodology of performance management is suggested. This paper concludes by developing PMS for benchmarking in construction companies and recommending some further directions on this research topic.

  • PDF

THE USE OF MOBILE COMPUTERS FOR CONSTRUCTION PROJECTS

  • Chul S. Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.956-961
    • /
    • 2009
  • When construction engineers perform their work in the jobsite, they have to record as-built conditions in the project log (Data Collection). On the other hand, the engineers often have to refer to the construction documents when necessary at the job faces (Data Access). The practice of Data Collection and Data Access in the jobsite can be greatly enhanced by utilizing mobile computing with wireless communications. In this paper, two cases of mobile computing applications for construction field management are presented; Mobile Specifications System and Mobile Data Collection System. The demonstration of the process for developing two mobile applications is the primary purpose of the paper. The problems and issues involved with adopting mobile computing for construction field are also presented. The simple information framework for mobile computing has been also proposed as an outcome of the research. As for development tools, readily available relational database and wireless network have been used. The use of commercial mobile broadband was examined for data communication where local area network is not available.

  • PDF

Identifying Standard Variables for Construction Management by Bibliometrics Analysis (계량서지학적 분석을 통한 건설사업관리 표준변수 도출)

  • Jin, Zhenhui;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.283-284
    • /
    • 2021
  • Due to the nature of the construction industry, massive and diverse data is generated and collected from each project. It can be classified into a number of variables that specify the distinct characteristics of construction projects. However, a variable is used in different terms depending on the users. This situation plays as a great barrier to effective construction information management and also has limitations to collective research and practice. As a solution, it is essential for developing common and shared variables. In this context, the aim of this study is to define systematically organized standard variables for globally collaborative construction management. The standard variables are identified by bibliometrics analysis with VOSviewer, and the bibliographic data is collected from the Scopus with 13,533 documents about construction management.

  • PDF

Creating Knowledge from Construction Documents Using Text Mining

  • Shin, Yoonjung;Chi, Seokho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.37-38
    • /
    • 2015
  • A number of documents containing important and useful knowledge have been generated over time in the construction industry. Such text-based knowledge plays an important role in the construction industry for decision-making and business strategy development by being used as best practice for upcoming projects, delivering lessons learned for better risk management and project control. Thus, practical and usable knowledge creation from construction documents is necessary to improve business efficiency. This study proposes a knowledge creating system from construction documents using text mining and the design comprises three main steps - text mining preprocessing, weight calculation of each term, and visualization. A system prototype was developed as a pilot study of the system design. This study is significant because it validates a knowledge creating system design based on text mining and visualization functionality through the developed system prototype. Automated visualization was found to significantly reduce unnecessary time consumption and energy for processing existing data and reading a range of documents to get to their core, and helped the system to provide an insight into the construction industry.

  • PDF