• Title/Summary/Keyword: Construction Period

Search Result 2,713, Processing Time 0.037 seconds

ANALYSIS OF THE TRANSPORTATION LOGISTICS FOR SPENT NUCLEAR FUEL IN KOREA

  • Lee, Hyo-Jik;Ko, Won-Il;Seo, Ki-Seok
    • Nuclear Engineering and Technology
    • /
    • v.42 no.5
    • /
    • pp.582-589
    • /
    • 2010
  • As a part of the back-end fuel cycle, transportation of spent nuclear fuel (SNF) from nuclear power plants (NPPs) to a fuel storage facility is very important in establishing a nuclear fuel cycle. In Korea, the accumulated amount of SNF in the NPP pools is troublesome since the temporary storage facilities at these NPP pools are expected to be full of SNF within ten years. Therefore, Korea cannot help but plan for the construction of an interim storage facility to solve this problem in the near future. Especially, a decision on several factors, such as where the interim storage facility should be located, how many casks a transport ship can carry at a time and how many casks are initially required, affect the configuration of the transportation system. In order to analyze the various possible candidate scenarios, we assumed four cases for the interim storage facility location, three cases for the load capacity that a transport ship can carry and two cases for the total amount of casks used for transportation. First, this study considered the currently accumulated amount of SNF in Korea, and the amount of SNF generated from NPPs until all NPPs are shut down. Then, how much SNF per year must be transported from the NPPs to an interim storage facility was calculated during an assumed transportation period. Second, 24 candidate transportation scenarios were constructed by a combination of the decision factors. To construct viable yearly transportation schedules for the selected 24 scenarios, we created a spreadsheet program named TranScenario, which was developed by using MS EXCEL. TranScenario can help schedulers input shipping routes and allocate transportation casks. Also, TranScenario provides information on the cask distribution in the NPPs and in the interim storage facility automatically, by displaying it in real time according to the shipping routes, cask types and cask numbers that the user generates. Once a yearly transportation schedule is established, TranScenario provides some statistical information, such as the voyage time, the availability of the interim storage facility, the number of transported casks sent from the NPPs, and the number of transported casks received at the interim storage facility. By using this information, users can verify and validate a yearly transportation schedule. In this way, the 24 candidate scenarios could be constructed easily. Finally, these 24 scenarios were compared in terms of their operation cost.

Improvements for Ordering and Bidding of VE in Convergence Era (융복합시대 설계의 경제성 등 검토(VE) 발주 및 입찰시 문제점과 개선방안에 관한 연구)

  • Park, Myeong-Su;Yang, Hae-Sool
    • Journal of Digital Convergence
    • /
    • v.14 no.3
    • /
    • pp.25-33
    • /
    • 2016
  • The author of this study conducted a survey with the expert groups who are currently handling hands-on works in convergence cities, ordering organizations, construction management companies, contractors, schools and research institutes, etc. The results of empirical analysis can be summarized as follows: First, there is no difference in distribution among the problems with position and the bidding system of private contracts. Second, there is relevance between position and the adequacy of current design VE ordering system, indicating different recognition. Third, there is no difference in distribution between organizations and the adequacy of current design VE ordering system. Fourth, there is difference in distribution between organizations and service price adequacy and there is difference in recognition by organization when organizations mutually recognize the service price adequacy. Fifth, there is difference in distribution between career and the necessity of the participating companies' qualification. Sixth, there is difference in distribution for the adequacy of career and the adequacy of participating companies' requirements. No problems have been found with the adequate service period according to private contract bidding system, but the necessity of participating companies' qualification and participating companies' requirements.

Soil Erosion and river-bed change of the Keum river basin using by GIS and RS (GIS와 RS를 이용한 금강유역 토양침식과 하상변화 연구)

  • Lee, Jin-Young;Kim, Ju-Young;Yang, Dong-Yoon;Nahm, Wook-Hyun;Kim, Jin-Kwan
    • The Korean Journal of Quaternary Research
    • /
    • v.20 no.2
    • /
    • pp.1-10
    • /
    • 2006
  • Flooding hazard caused by natural and artificial environmental changes is closely associated with change in river bed configuration. This study is aimed at explaining a river-bed change related to soil erosion in the Keum river basin using GIS and RS. The USLE was used to compute soil erosion rate on the basis of GIS. River-bed profiles stretching from Kongju to Ippo were measured to construct a 3D-geomorphological map. The river-bed change was also detected by remote sensing images using Landsat TM during the period of 1982 to 2000 for the Keum river. The result shows that USLE indicates a mean soil erosion rate of $1.8\;kg/m^2/year$, and a net increase of a river-bed change at a rate of $+5\;cm/m^2$/year in the Kangkyeong area. The change in river-bed is interpreted to have been caused by soil erosion in the downstream of the Keum river basin. In addition river-bed change mainly occurred on the downstream of the confluence where tributaries and the main channel meet. Other possible river-bed change is caused by a removal of fluvial sand aggregates, which might have resulted in a net decrease of exposed area of sediment distribution between 1991 and 1995, while a construction of underwater structures, including a bridge, a reclamation of sand bars for rice fields and dikes, resulted in an increase of the exposed area of river-bed due to sediment accumulation.

  • PDF

Development of Soil Moisture Data Assimilation Scheme for Predicting Effective Soil Characteristics Using Remotely Sensed Data (원격탐사자료 기반 유효토양특성 산정을 위한 토양수분자료동화기법 개발)

  • Lee, Taehwa;Kim, Sangwoo;Lee, Sang-Ho;Choi, Kyung-Sook;Shin, Yongchul;Lim, Kyoungjae;Park, Younshik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.1
    • /
    • pp.21-30
    • /
    • 2018
  • In this study, we developed the Soil Moisture Data Assimilation (SMDA) scheme to extract Effective Soil Characteristics-ESC (Sand, Silt, Clay %) from MODerate resolution Imaging Spectroradiometer (MODIS) products. The SMDA scheme was applied to the MODIS-based Soil Moisture (SM) data during the summer (July to September) period. Then the ESC and soil erosion factors (K) were predicted, respectively. Several numerical experiments were conducted to test the performance of SMDA at the study sites under the synthetic and field validation conditions. In the synthetic experiment, the estimated soil moistures values(R: >0.990 and RMSE: <0.005) were identified well with the synthetic observations. The field validation results at the Bangdongri and Chungmicheon sites were also comparable to the TDR-based measurements with the statistics (R: 0.772/0.000 and RMSE: 0.065/0.000). The estimated ESC values were also matched well with the measurements for the synthetic and field validation conditions. Then we tested the SMDA scheme to extract the ESC from the MODIS-based soil moisture products. Although uncertainties exist in the results, the estimated soil moisture and ESC based on the SMDA were comparable to the measurements. Overall, the K factors were similarly distributed based on the derived ESC. Also, the K factors in the mountainous regions were higher than those of the relatively flat areas. Thus, the newly developed SMDA scheme can be useful to estimate spatially and temporally-distributed soil erosion and establish soil erosion management plans.

Distribution Aspect and Extinction Threat Evaluation of the Endangered Species, Rhodeus pseudosericeus (Pisces: Cyprinidae) in Korea (멸종위기어류 한강납줄개 Rhodeus pseudosericeus (Pisces: Cyprinidae)의 분포양상 및 멸종위협 평가)

  • Ko, Myeong-Hun;Han, Mee-Sook;Kwan, Sun-Man
    • Korean Journal of Ichthyology
    • /
    • v.30 no.2
    • /
    • pp.100-106
    • /
    • 2018
  • The distribution aspect and extinction threat evaluation of the endangered species, Rhodeus pseudosericeus were investigated from 2012 to 2017 in Korea for the subject of this study. The number of appearance sites in the past literature of available and identified R. pseudosericeus was 26. During the study period, the samples of R. pseudosericeus were collected in 44 sites (Hangang River 35 sites, Sapgyocheon Stream 4 sites, Daecheoncheon Stream 5 sites) among the noted 214 sampling stations investigated. Among these, the newly appearance streams were Ilricheon Stream, Samsancheon Stream, Bangyecheon Stream and Hanpocheon Stream in the Hangang River. In addition, the habitats and populations in the upper Seomgang River (Hoengseong Dam), lower Heukcheon Stream, Muhancheon Stream and Daecheoncheon Stream decreased due to dam construction, river work, water pollution, and the spread of the exotic species Micropterus salmoides. The main habitat of R. pseudosericeus was the middle-upper stream of clean water with slow water velocity, sand-pebble bottoms and lots of aquatic plants. Given this evidence as noted for the 30.2% reduction in occupancy within 10 years, due to the qualitative decline of habitat, the overfishing risk of ornamental fish and the spread of M. salmoides, in this case R. pseudosericeus is considered to be Vulnerable (VU A2cde) based on the IUCN Red List categories and criteria.

Evaluation of Properties of Sulfur-Oxidizing Bacteria Growth and Resistance to Biochemical Corrosion by Simulation Test (시뮬레이션 시험에 의한 황산화세균의 생장 특성 및 생화학적 부식 저항성 평가)

  • Kim, Gyu-Yong;Lee, Eui-Bae;Khil, Bae-Su;Lee, Seung-Hun
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.4
    • /
    • pp.495-502
    • /
    • 2008
  • To analyze the growth of SOB(Thiobacillus novellus) and biochemical corrosion of concrete, simulation test method and device were developed, and basic conditions for SOB growth were established. Two types of simulation tests were conducted according to a transplant method and a concentration of $H_2SO_4$. As a result, the SOB growth in distinct manners and antibiosis of specimen were observed. In the case of the specimens indirectly transplanted with SOB through culture solution submersion at a hydrogen sulfide level of 120 ppm, the rapid activation of SOB and the resulting sulfuric acid production were observed. However, SOB were shown to grow rapidly and then die out in a relative short period of time. Meanwhile, in the case of the specimens directly transplanted with SOB at a hydrogen sulfide level of 50 ppm, the long-term growth of SOB was possible, but the production of sulfuric acid by SOB did not progress. In the case of the antibiotic metal-mixed specimens, SOB with destroyed cell membranes and internal organizations were observed.

The Experimental Study on Transverse Field Joint Method of Precast Road Deck Slab of Double Deck Tunnel in Great Depth (대심도 복층터널 프리캐스트 중간슬래브의 횡방향 현장이음방식에 대한 실험연구)

  • Lee, Doo-Sung;Kim, Bo-Yeon;Bae, Chul-Gi;Hur, Jae-Hun
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.23-32
    • /
    • 2017
  • The joints between precast PSC slabs of the intermediate road slab in double deck tunnel are inevitably generated in the road traffic vehicle traveling direction. Therefore, it is important to make the behavior of parts on the joint in one piece. The imtermediate road slab system of double deck tunnel in great depth proposed in this study will be constructed with precast PSC slab in order to minimize the construction period. And the joint connection between the precast slab has been developed in two methods: the 'Transverse tendon reinforcement method' and 'High strength bolts connection method'. Also, the experiments were performed for the full scale model in order to evaluate the performance of the intermediate road deck slab with two type joints systems, the structural stability was verified through the F.E.M analsysis. The results of static loading test and F.E.M analysis investigated a very stable behavior of intermediate road deck slab in double deck tunnel applying the joint methods developed in this study, in the cracks and deflections to satisfy the design standards of Highway Roads Bridges (2011), it was determined that there is no problem even servicebility.

An Analysis of the Changes in the Cause-and-Effect Relationships between Socio-Economic Indicators and the Road Network of Seoul Using Structural Equation Model (구조방정식모형(SEM)을 이용한 서울시 도로망과 사회.경제적 지표의 인과관계 변화분석)

  • Kim, Jung-Hee
    • Journal of the Korean Geographical Society
    • /
    • v.44 no.6
    • /
    • pp.797-812
    • /
    • 2009
  • The purpose of this study is to analyze cause-and-effect relationships between patterns of the road network and socio-economic factors such as population, industry, and land use of Seoul during the period of 1970~2000. In this study, Structural Equation Model (SEM) is used to estimate simultaneously the cause-and-effect relationships between many independent variables and dependent variables. For the observed variables, variables related to population, industry, land price, land use, and road variables were included; these variables were classified by exploratory factor analysis. The analysis using the SEM showed that the structure of the model changed around the 1980's. In general, socio-economic factors such as population, industry, and land use affected construction of the road network of the city during the 1970's and the 1980's. Especially, it was analyzed that the industrial development had the greatest impact on formation of the road network. In the 1990's, the effect that the road network exerts on socio-economic factors proved to be more appropriate than the other way round. At that time, the road-related factors had the greatest effect on the land price and industrial development, and that tendency has continued until now.

The Ramp Metering System Construction of Urban Freeway by the Intelligent Transportation System (ITS) Technology (첨단교통체계(ITS)에 의한 도시고속도록의 Ramp Metering 시스템 구축에 관한 연구)

  • 김태곤
    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.333-350
    • /
    • 1999
  • Today freeway is thought to be a very important transportation facility carrying tremendous traffic flow as the main corridor within the area of between the areas. However freeway is experiencing severe congestion and accidents by increased entrance ramp flow especially at peak time period. Ramp meters on the freeway entrance ramps that supply traffic to the freeway in a measured or appropriately regulated amount are needed for alleviating freeway congestion. Because ramp meters can be operated to discharge traffic at a measured or regulated rate thus maintaining more uniform speed on the mainline section maximizing the throughput to the freeway within the capacity of a downstream bottleneck and reducing the congestion related accidents. Thus the objectives in this study were to analyze the traffic characteristics on the freeway I-94 with ramp metering system before/after ITS technology in Detroit (Michigan) area compare shifts of the traffic characteristics on the freeway I-94 before/after ITS technology and finally suggest a better ramp metering strategy for the freeway system The following results were obtained: i)Flow occupancies and speeds on the mainline merge section of freeway were shown to be a big difference depending on the peak periods areas and directions based on the distribution of traffic flow characteristics on the freeway. ii)Reduced speed was shown to be more than 5 mph and ramp flow was also shown to be more than 240 vph at peak periods if there was the ramp metering system constructed on the freeway. iii)Ramp metering system was shown to be optimally operated on the freeway if ramp flow could be maximized within the range of over 900 vph and reduced occupancy could be also maximized by no more than 2 percent at peak periods. iv)The average flows on the freeway after the ITS technology were shown to be a decrease of over 20% depending on the peak periods areas and directions when compared with those flow on the freeway before the ITS technology. over 20% depending on the peak periods areas and directions when compared with those speeds on the freeway before the ITS technology. vi)The average metering rates on the freeway after the ITS technology were shown to be an increase of over 10% depending on the peak periods areas and directions when compared with those metering rates on the freeway before the ITS technology.

  • PDF

A Study on Development of Remote Crane Wire Rope Flaws Detection Systems (원격 크레인 와이어 로프 결함 탐지 시스템 개발에 관한 연구)

  • Min, Jeong-Tak;Lee, Jin-Woo;Lee, Kwon-Soon
    • Journal of Navigation and Port Research
    • /
    • v.27 no.1
    • /
    • pp.97-102
    • /
    • 2003
  • Wire ropes are used in a myriad of various industrial applications such as elevator, mine hoist, construction machinery, lift, and suspension bridge. Especially, the wire rope of crane is important component to container transfer. If it happens wire rope failures during the operation, it may lead to safety accident, economic loss by productivity decline and so on. To solve this problem, we developed remote wire rope fault detecting system, and this system is consisted of 3 parts that portable fault detecting part, signal processing part and remote monitoring part. All detected signal has external noise or disturbance according to circumstances. So, we applied to discrete wavelet transform to extract a signal from noisy data. It is verified that the detecting system by de-noising has good efficiency for inspecting faults of wire ropes in service. As a result, by developing this system, container terminal could reduce expense because of extension fo wire ropes exchange period and could competitive power. Also, this system is possible to apply in several field such as elevator, lift and so on.