• Title/Summary/Keyword: Construction Performance

Search Result 8,022, Processing Time 0.035 seconds

Study of Polymer Rapid Setting Cement Concrete Using Electric Arc Furnace Oxidizing Slag Aggregate (전기로(電氣爐) 산화(酸化)슬래그 잔골재를 이용한 폴리머 속경성(速硬性) 시멘트 콘크리트 기초물성(基礎物性) 연구(硏究))

  • Jung, Won-Kyong;Gill, Yong-Soo;Kang, Seung-Hee
    • Resources Recycling
    • /
    • v.21 no.1
    • /
    • pp.30-40
    • /
    • 2012
  • Electric arc furnace slag is made in ironworks during steel refining, it is been increasing chemical and physical resistibility using ageing method of unstable state of melting steel slag for using concrete's fine aggregates. Which is been changing stable molecular structure of aggregates, it restrains moving of ion and molecule. In Korea, KS F 4571 has been prepared for using the electric arc furnace oxidizing slag to concrete aggregates(EFS). In this study, Electric arc furnace oxidizing slag is used in the PRCC(Polymer Rapid setting Cement Concrete) which is applied a bridge pavement of rehabilitation, largely. The results showed that the increment of compressive strength development by 10- 20%. The flexural strength of EFS-Con increased greatly as the electric arc furnace oxidizing slag changed. The compressive strength and flexural strength developed enough for opening the overlayed EFS-Con to the traffic after 4 hours of EFS-Con placement. The permeability of EFS-Con was evaluated as negligible due to its very low charge passed. Thus, EFS-Con could be used at repairing or overlaying the concrete at fast-track job sites.

Improved Design of Hydraulic Circuit of Front-end Loader for Bump Shock Reduction of an Agricultural Tractor (농업용 트랙터의 프론트 로더 충격 저감을 위한 유압 회로의 설계 개선)

  • Cho, Bong Jin;Ahn, Seong Wook;Lee, Chang Joo;Yoon, Young Hwan;Lee, Soo Seong;Kim, Hak Jin
    • Journal of Drive and Control
    • /
    • v.13 no.2
    • /
    • pp.10-18
    • /
    • 2016
  • A front-end loader (FEL) mounted on an agricultural tractor is one of the most commonly used implements to mechanize routine agricultural tasks. When the FEL is used with a loaded bucket, careful operation is required to maintain safety and avoid spillage when the tractor passes a bump because a change in the gravity center of the tractor due to varied loadings can affect the stability of the tractor. Use of a boom suspension system consisting of accumulators and orifice dampers can be instrumental in reducing pitching vibrations while increasing the handling performance of the FEL-mounted tractor. The objective of this research was to reduce bump shocks by adding an orifice and a flow control valve to the original hydraulic circuit composed solely of accumulators. A simulation study was performed using the SimulationX program to investigate the effects of an accumulator and an orifice-throttle damper on bump shocks. Results showed that the peak pressure on a boom cylinder and the vertical acceleration of a bucket were significantly affected by use of both an accumulator and an orifice damper. In a field test conducted with a 75-kW tractor, the peak pressure of the boom cylinder, and the root mean square (RMS) vertical acceleration of the bucket and seat were reduced by on average, 23.0, 42.2, and 44.9% respectively, as compared to those measured with the original accumulator system, showing that an improved design for the accumulator hydraulic circuit can reduce bump shocks. Further studies are needed to design a tractor suspension system that includes the effects of cabin suspension and tires as well as dynamic analysis.

A P2P Content Distribution Method Using Virtual Location in MANET (MANET에서 가상위치를 이용한 P2P 데이터 배포 방법)

  • Ko, Seok-Kap;Oh, Seung-Hun;Kim, Young-Han
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.46 no.5
    • /
    • pp.139-145
    • /
    • 2009
  • Recently P2P (Peer-to-Peer) networks and applications have been expanded to various field. However, because the construction of P2P network did not influence a underlying network topology or property, it may be inefficient. Especially, this inefficiency is more serious in MANET because MANET has narrow bandwidth and energy constraint. When we use a proactive routing protocol in MANET, we can know hop counts between two nodes. And, we can construct a P2P overlay network using this hop count information. However, In case of using hop count only, we can avoid a interference path selection problem and a zig-zag problem. We propose a method of improving P2P contents distribution using virtual positions. We calculate virtual positions from hop counts using the trigonometry. This method solves a interference path selection problem and a zig-zag problem. This method also allows a P2P network to influence underlying network topology. We adopt this method to a network which uses a virtual geographic routing, a proactive routing protocol, or a reactive routing protocol. We show that our proposed methods improve P2P contents distribution performance over MANET through a simulation.

Building Height Extraction using Triangular Vector Structure from a Single High Resolution Satellite Image (삼각벡터구조를 이용한 고해상도 위성 단영상에서의 건물 높이 추출)

  • Kim, Hye-Jin;Han, Dong-Yeob;Kim, Yong-Il
    • Korean Journal of Remote Sensing
    • /
    • v.22 no.6
    • /
    • pp.621-626
    • /
    • 2006
  • Today's commercial high resolution satellite imagery such as IKONOS and QuickBird, offers the potential to extract useful spatial information for geographical database construction and GIS applications. Extraction of 3D building information from high resolution satellite imagery is one of the most active research topics. There have been many previous works to extract 3D information based on stereo analysis, including sensor modelling. Practically, it is not easy to obtain stereo high resolution satellite images. On single image performance, most studies applied the roof-bottom points or shadow length extracted manually to sensor models with DEM. It is not suitable to apply these algorithms for dense buildings. We aim to extract 3D building information from a single satellite image in a simple and practical way. To measure as many buildings as possible, in this paper, we suggested a new way to extract building height by triangular vector structure that consists of a building bottom point, its corresponding roof point and a shadow end point. The proposed method could increase the number of measurable building, and decrease the digitizing error and the computation efficiency.

A Proposal on the Consulting Model for Efficient Construction of Material Handling Automation System : Focused on K Company's Case (물류자동화 시스템의 효율적 구축을 위한 컨설팅 방법론 제안 : K기업의 사례를 중심으로)

  • Ko, J.H.;Cho, J.H.;Oh, H.S.;Shim, S.C.;Ryu, J.H.;Lee, S.J.
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.202-211
    • /
    • 2015
  • Companies build the factory automation system to improve management effectiveness and productivity as prime strategies for sustainable growth. But most companies undergo various trials and errors while carrying out the project without elaborate preparation stage for factory automation. In this study, we tried to verify what factors are critical to effectively building distribution automation system, which is a branch of factory automation system. A consulting model for setting up a Material Handling Automation System by utilizing the Stage-Gate Process, which is product development process was studied. 29 material handling automation projects carried out between the year 1990 to 2013 at K-Company were selected. Interviews with the project managers, operators and maintenance personnels, various records and current status of the projects were used as data for structural equations based on the Milan consulting model and existing researches of factory automation, CIM for material handling automation. Creating effective basis of production, material handling system and energy saving system with expert review, when preparing a material handling automation project, help promote the project planning thus contributing to the performance of the resulting system, which appears though rather weakly in our data. Also the effect of material handling automation can be enhanced through sufficient and effective links to the relevant environments such as production logistics management and automated warehouses. More detailed planning characteristics of project promotion or some time-series data of effective Material Handling Automation System could enhace furthur studies. We propose a consulting model for setting up an efficient material handling automation system.

A Study on the Implementation of an All-IP Train Communication Network Using Plastic Optical Fiber (플라스틱 광섬유를 이용한 All-IP 열차통신네트워크 구현에 관한 연구)

  • Kim, Dongha;Lee, Soyoung;Choi, Kyuhyong
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.3
    • /
    • pp.189-195
    • /
    • 2013
  • Recent trains have broadband train communication networks to improve train operation safety and to provide passengers with multimedia services. Compared to glass optical fiber, plastic optical fiber (POF) has a large diameter; it also provides the good durability and maintainability necessary to railway applications. This paper suggests an All-IP broadband train communication network that connects all devices in the train through a POF interface. Performance tests according to Korean railroad standards shows that this POF interface is usable in the range of vibration and temperature conditions encountered in trains. A dedicated Layer-2 switch with the POF interface is developed for the construction of the All-IP train communication network. A prototype 1Gbps train communication network was set up in a trial-run of train on a metro line using the developed Layer-2 switch and POF. On-track tests indicated the feasibility of the POF train communication network. POF has an additional advantage of economic feasibility, and it is expected to start a trend toward broadband train communication networks using POF.

A study on the smoke control performance of the damper exhaust system at FCEV fire in tunnel for small vehicles (소형차 전용터널 내 수소연료전지차 화재시 집중배기방식의 제연성능에 관한 연구)

  • Hong, Seo-Hee;Baek, Doo-San
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.745-756
    • /
    • 2022
  • The road tunnel is a semi-closed space that is blocked on all sides except the entrance and exit, and in the event of a fire, the smoke of the fire spreads longitudinally due to heat buoyancy caused by the fire and air currents that always exist in the tunnel. To solve this problem, smoke removal facilities are installed in road tunnels to secure a safe evacuation environment by controlling the direction of movement of smoke or directly smoking at fire points. In urban areas, the service level of urban roads decreases due to the increase in traffic due to the increase in population, and as a solution, the construction of underground roads in urban areas is increasing. When a fire occurs during hydrogen leakage through TPRD of a hydrogen fuel cell vehicle (FCEV), the fire intensity depends on the amount of leakage, and the maximum fire intensity depends on the orifice diameter of the TPRD. Considering the TPRD orifice diameter of 1.8 mm, this study analyzed the diffusion distance of fire smoke according to the wind speed of the roadway and the opening interval of the large exhaust port when the maximum fire intensity was 15 MW. As a result, it was analyzed that air flow in the tunnel could be controlled if the wind speed of the road in the tunnel was less than 1.25 m/s, and smoke could be controlled within 200 m from the fire if the damper interval was 50 m and 100 m.

A Study on the Performance Evaluation Measures of Traffic Signal Operation at Signalized Intersections by Utilizing Historical Data from Advanced Traveller Information System (첨단 교통 정보 시스템 누적 소통정보를 활용한 신호교차로 운영개선 효과평가를 위한 혼잡강도 지표 연구)

  • Cho, Yong-bin;Kim, Jin-tae
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.11
    • /
    • pp.643-654
    • /
    • 2018
  • In order to understand and manage traffic flows in urban areas in the past, a variety of traffic engineering theoretical indicators such as intersection lag and highway speed have been applied. However, these theories and indicators have been developed under the constraints of traffic engineering research before the construction of intelligent transportation system. Since the ATIS system currently exists, it is necessary to introduce a separate traffic engineering technology that utilizes the data. In this paper, it is aimed to confirm whether it is applicable to intermittent flow (approach road, intersection, control group, main road axis) by using 'congestion intensity' which is already used in traffic engineering field. The results of this study are as follows: (1) The traffic signal improvement effect of urban road access road, intersection road, control group, Two verification studies were performed to verify the derived congestion intensity index. (1) verification of congestion intensity threshold value analysis and (2) crossing improvement using the congestion intensity. Through verification, it was confirmed that it is possible to apply the congestion intensity in the inter - city intermittent flow using the 5 - minute unit speed data so as to be able to escape from the existing traffic signal operation management which is past passive and manpower limit.

Development of AI-based Real Time Agent Advisor System on Call Center - Focused on N Bank Call Center (AI기반 콜센터 실시간 상담 도우미 시스템 개발 - N은행 콜센터 사례를 중심으로)

  • Ryu, Ki-Dong;Park, Jong-Pil;Kim, Young-min;Lee, Dong-Hoon;Kim, Woo-Je
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.750-762
    • /
    • 2019
  • The importance of the call center as a contact point for the enterprise is growing. However, call centers have difficulty with their operating agents due to the agents' lack of knowledge and owing to frequent agent turnover due to downturns in the business, which causes deterioration in the quality of customer service. Therefore, through an N-bank call center case study, we developed a system to reduce the burden of keeping up business knowledge and to improve customer service quality. It is a "real-time agent advisor" system that provides agents with answers to customer questions in real time by combining AI technology for speech recognition, natural language processing, and questions & answers for existing call center information systems, such as a private branch exchange (PBX) and computer telephony integration (CTI). As a result of the case study, we confirmed that the speech recognition system for real-time call analysis and the corpus construction method improves the natural speech processing performance of the query response system. Especially with name entity recognition (NER), the accuracy of the corpus learning improved by 31%. Also, after applying the agent advisor system, the positive feedback rate of agents about the answers from the agent advisor was 93.1%, which proved the system is helpful to the agents.

Evaluation of Operational Options of Wastewater Treatment Using EQPS Models (EQPS 모델을 이용한 하수처리장 운전 평가)

  • Yoo, Hosik;Ahn, Seyoung
    • Journal of the Korean Society of Urban Environment
    • /
    • v.18 no.4
    • /
    • pp.401-408
    • /
    • 2018
  • EQPS (Effluent Quality Prediction System, Dynamita, France) was applied to analyze the appropriateness of the design of a bioreactor in A sewage treatment plant. A sewage treatment plant was designed by setting the design concentration of the secondary clarifier effluent to total nitrogen and total phosphorus, 10 mg/L and 1.8 mg/L, respectively, in order to comply with the target water quality at the level of the hydrophilic water. The retention time of the 4-stage BNR reactor was 9.6 hours, which was 0.5 for the pre-anoxic tank, 1.0 for the anaerobic tank, 2.9 for the anoxic tank, and 5.2 hours for the aerobic tank. As a result of the modeling of the winter season, the retention time of the anaerobic tank was increased by 0.2 hours in order to satisfy the target water quality of the hydrophilic water level. The default coefficients of the one step nitrification denitrification model proposed by the software manufacturer were used to exclude distortion of the modeling results. Since the process modeling generally presents optimal conditions, the retention time of the 4-stage BNR should be increased to 9.8 hours considering the bioreactor margin. The accurate use of process modeling in the design stage of the sewage treatment plant is a way to ensure the stability of the treatment performance and efficiency after construction of the sewage treatment plant.