Methodology Development for Analyzing Performance of Star Technology using BSC in Construction (BSC를 이용한 건설R&D 스타기술의 성과분석 방법론 개발)

  • Park, Hwan-Pyo;Hong, Tae-Hoon;Chin, Kyung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.194-203
    • /
    • 2008
  • Construction Research and Development (R & D) projects have been begun with the investment of 1.2 billions in 1994 and have been reached to 30 billions in 2004. During this ten-year period, a total of investment for construction R&D amounts to 125.7 billions (Total 418 construction R&D projects). However, the results of each R&D project could not apply to real construction site because each project has been performed by a small size (0.5 billions). In addition to those, the social interest on the construction R&D projects has not been received and those importance has not been recognized. Especially, there aren't still standardized methodologies or weighted measurement data for evaluating research performance of the construction R&D projects up to now. The construction R&D projects has been Invested on the basis of an annual technology demand survey rather than the research performance outcome. Therefore, it is important to establish a qualitative performance measurement model for evaluating construction R&D projects. This paper proposes a new research methodology for analyzing the performance measurement of the construction R&D projects. First of all, the Balanced Score Card (BSC) is used to evaluate the construction STAR technologies selected in this research. The performance items of BSC has been modified as four criteria such as "productivity, "knowledge accumulation," "training of students," and "welfare." The new research methodology developed in this paper is expected to use in establishing resonable construction R&D budget in the future.

Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects (선보상-후시공 제도의 공공건설사업 파급효과 분석)

  • Kim Sang-Bum;Choi Jeong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.245-254
    • /
    • 2004
  • Pre-compensation and post-construction policy'(PCPC) is a part of $\ulcorner$public project performance improvement policies (PPPIP)$\lrcorner$ whose purpose is to reduce the construction project cost by $20\%$. This research focuses on measuring the quantitative and qualitative impacts of PCPC public construction project. The evaluation of PCPC was conducted using five performance indices which are measuring performance improvement in terms of project cost and schedule. The analysis results show that implementation of this policy reduced $4.8\%$ of public construction project budget while playing a positive role in shortening the project schedule.

A study on the Improvement of the Performance Measurement Based on Lean Construction (린 건설에 기초한 성과 측정 방법 개선방향에 관한 연구)

  • Yun, Jung-Sook;Kim, Hyung-Il;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.278-281
    • /
    • 2008
  • As all industries field has changed very quickly, the field of construction faces in many changed. It is the representatively change that focus on the growth of quality level than increase of the quantity in construction. Whether the project successes or not is related to the survival of the company and it is necessity that we need performance measurement indicators to complete the project successfully. The domestic construction company considers overbearingly the cost-performance indicator in executing a project so far. It is rare of studies that suggest the methodology of more deeply measurement and analysis about the each project itself. The performance measured methodology based on Lean Construction is linked with the each project performance measurement methodology. This methodology uses three indicators such as the reliability, effectiveness and productivity at the sane their measuring whether each task is completed at the point of work. The measurement on the three performance indicators measure and evaluate whether the task is completed on the focus of construction duration. The research suggest the work plan reliability and weight of the performance measurement methodology based on the Lean Construction and the three considerately in the scope of measurement. If the suggestion is considered fully, we can indicate more objective and accurate construction project performance measurement indicators based on Lena Construction.

  • PDF

An analysis on the International Construction Market and the Business Performance of Top Contractors after the Global Financial Crisis

  • Sung, Yookyung;Choi, Seok-In
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.736-737
    • /
    • 2015
  • In these days, international construction market including construction companies has much grown due to globalization and economic boom in the mid 2000's. The size of international construction market, measured with overseas revenue of 225 construction firms, has expanded 2.7 times from 2003 to 2008 according to the ENR. However, after the global financial crisis of 2008 it has faced condition of low growth. In this research, major changes of international construction market and top contractors have been studied. In this study, changes of international construction market have been analyzed in the aspect of region and product including general buildings, transportation, petroleum, etc. Then, in order to find the changes of top contractors which obtained good accomplishment, business performance of companies have been examined by the compound annual growth rate, profit margin and international revenue by comparing the data before 2008 and after. The purpose of the study is to understand major changes of international construction market. Also, strategy changes of top contractors against market stagnation, profit depreciation, high competition have been inferred through the study. The result of the study would contribute to analyzing the strategies of construction companies in international market.

  • PDF

A STUDY ON THE INTRODUCTION OF PERFORMANCE WARRANTY SYSTEM FOR PAVEMENTS INTO KOREA

  • Tae-Song Kim;Yong-Chil Seo;Sang-Beom Lee;Kyong-Ju Kim;Jai-Dong Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1446-1452
    • /
    • 2009
  • This study is designed to examine the current status of the performance warranty systems for asphalt pavements implemented in Europe, USA, and Japan, and to review the feasibility and possibility of introducing this system into the Korean environment. For such objectives, the concept and necessity of performance warranty and the status of Korean contracting systems and overseas performance warranty systems were evaluated. In particular, the bidding systems, performance guarantee systems, and maintenance work inclusion status in the projects and warranty specifications of Europe, USA and Japan were comparatively evaluated. And methods of introducing the performance warranty system by utilizing defects liability system and design-build contracts of Korea were suggested.

  • PDF

Evaluation on the Structural Performance and Economics of Ultra-high Performance Concrete Precast Bridges Considering the Construction Environment in North Korea (북한 건설환경을 고려한 초고성능 콘크리트 프리캐스트 교량의 구조성능 및 경제성 평가)

  • Kim, Kyoung-Chul;Koh, Kyung-Taek;Son, Min-Su;Ryu, Gum-Sung;Kang, Jae-Yoon
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.2
    • /
    • pp.208-215
    • /
    • 2021
  • In this study, a customiz ed bridge system was developed for North Korea application. For the application of North Korea, the customized bridge system design, fabrication, and construction performance evaluation were performed using ultra-high performance concrete a compressive strength 120MPa or more and a direct tensile strength 7MPa or more. The comparison of the North Korean truck luggage load(30, 40, 55) and the Korean standard KL-510 load showed that cross-section increased as the load increased. Furthermore, a bridge with a span length of 30m was fabricated with ultra-high performance concrete for the construction performance evaluation. The evaluation of the load condition analysis was performed by a flexural test. The results showed that a bridge with a span length of 30m secured about 167% of sectional performance under initial cracking load conditions and about 134% of load bearing capacity under ultimate load conditions. As a result of economic analysis, the customized bridge system using ultra-high-performance concrete was less than about 11% of the upper construction cost compared to the steel composite girder bridge. Therefore, these results suggest that the price competitiveness can be secured when applying the ultra-high-performance concrete long-span bridge developed through this study.

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

Robust Real-time Object Detection on Construction Sites Using Integral Channel Features

  • Kim, Jinwoo;Chi, Seokho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.304-309
    • /
    • 2015
  • On construction sites, it is important to monitor the performance of construction equipment and workers to achieve successful construction project management; especially, vision-based detection methods have advantages for the real-time site data collection for safety and productivity analyses. Although many researchers developed vision-based detection methods with acceptable performance, there are still limitations to be addressed: 1) sensitiveness to the shape and appearance changes of moving objects in difference working postures, and 2) high computation time. To deal with the limitations, this paper proposes a detection algorithm of construction equipment based on Integral Channel Features. For validation, 16,850 frames of video streams were recorded and analyzed. The results showed that the proposed method worked in high performance in terms of accuracy and processing time. In conclusion, the developed method can help to understand useful site information including working pattern, working time and input manpower analyses.

  • PDF

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.

A Study on the Effects of Risk Perception and Opportunism on the Project Performance (위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Yoon, Chang Soo;Jo, Dong Hyuk
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.1
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.