• 제목/요약/키워드: Construction Order Construction

검색결과 7,870건 처리시간 0.038초

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

건설공사 사후평가결과보고서 표준화 방안 (Standardization for Post-Construction Evaluation Report)

  • 김경훈;이찬규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

건설현장 안전사고의 작업 리스크 매트릭스 분석 (Analysis of Job Risk Matrix Exposed to Safety Accidents in Construction Field)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2017
  • As the construction industry has been increasingly complex, aging workers, hard-working avoiding young generation, foreign workers having language problem for the past decades, delivering of construction qualified workers has been a rising problem. This misalignment between the complex jobs and the number of skilled workers will continue to be in issue that the construction industry will face for following decades. Construction field workers who are working outside in uncontrollable condition unlike manufacturing industry are exposed to easily construction safety accident. There are so many efforts to prevent and control the construction accident. However, the relationships between the construction works and construction safety accident has not been well dealt and investigated based on objective accident data except for the qualitative study through interview, delphi and so on. Therefore this study analyzes job risk matrix exposed to safety accidents based on statistic data for 20 years from Korean Occupational Safety & Health Agency in order to prevent the construction field accidents.

  • PDF

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

공공 건축물 그린리모델링 시공단계 공사 우선사항 도출에 관한 연구 - 건축요소를 중심으로 - (A Study on the Derivation of Construction Priority in the Construction Stage of Green Remodeling in Public Buildings - With a Focus on Construction Elements - )

  • 박준수;안용한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.59-60
    • /
    • 2023
  • Climate change caused by greenhouse gas emissions has become a climate crisis that actually threatens us and is making global efforts to solve it. In response, Korea is carrying out a "Green remodeling" project to reduce carbon emissions generated in the building maintenance stage, which has the highest percentage of all carbon emissions. However, Green remodeling is carried out under emergency supervision at the construction stage, but construction supervisors are often non-professionals, and even experienced site directors have difficulty in implementing actual designs if they do not have experience in Green remodeling construction. Therefore, this study aims to derive priorities between construction and construction focus points for each construction in order to standardize the construction of Green remodeling construction works and derive objective guidelines.

  • PDF

건설폐기물 자원순환체계 구축을 위한 발생원단위 적용에 관한 연구 (The Investigation on Application of Construction Waste Unit to Establish Resource Recycling System through Case Study)

  • 손병훈;홍원화
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.181-186
    • /
    • 2010
  • Research on construction waste unit was in progress in the 1995 when 'Proper Disposal and Recycling Measures for Construction Waste' was made by the Seoul Development Institute. Such an effort has been made in order to cope with the lack of natural resources in Korea and to utilize the reusable resources. Furthermore, these efforts have also increased due to the improved standing of Korea in the international community. A large number of residential buildings were built in the response to the government's policy by increasing the supply of houses between the 1970's and 1980's. In 2000, more reconstruction and redevelopment was done because of the aged buildings and change of use for those buildings. And the project has been actively promoted until now, which caused a sharp increase in the generation volume of construction waste. In Korea, 8 kinds of construction waste unit, including the standard construction manpower and materials estimation, are introduced. Currently, they provide standards to different building categories and waste properties while for construction sites different standards are applied. This study aims to measure the actual amount of construction waste after sample buildings are dismantled and analyzes the estimation of the waste quantity by using various standard units. Through comparison, this study will figure out the differences among the standard units in order to find out how to apply the standard units properly. Moreover, this research will provide practical measures to apply such units to construction sites.

고층 철골공사의 사업관리 효율화를 위한 자동화 기술 적용 방안 연구 (Automation Technology Application for Efficient Project Management of Steel Framing High-rise Building Construction)

  • 김창섭;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.3-4
    • /
    • 2010
  • With improvements of information technology, the cases which automation technology are applied to construction site are increased. These technologies have advantages and limitations for construction site, therefore they has to be considered in order to maximize benefit. This study are to suggest the process for optimizing management of steel framing high-rise building construction.

  • PDF

Competitiveness Benchmarking of Overseas Construction through a SWOT analysis of leading construction firms in Spain and France

  • Han, Jae-Goo;Park, Hwan-Pyo;Jang, Hyoun-Seung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.721-722
    • /
    • 2015
  • The aim of this research is to provide a direction to benchmark advanced construction companies from Spain and France by deriving business strategies through SWOT analysis in order to strengthen overseas expansion and competitiveness of domestic construction companies.

  • PDF

Feature Selection을 활용한 해외 건설의 공사변경 관리에 관한 연구 - 중동 플랜트 건설프로젝트를 중심으로 - (A Study on Change Orders in Overseas Construction using Feature Selection - Focus on Plant Construction in the Middle East -)

  • 홍선영;염춘호
    • 한국건설관리학회논문집
    • /
    • 제22권2호
    • /
    • pp.63-71
    • /
    • 2021
  • 국내 기업의 해외 건설 수주는 지속적으로 성장하고 양적성장을 이루어왔지만, 2011년 유가하락에 이어 최근 COVID-19의 장기화 등 대외환경의 불확실성이 커지며 해외 건설 시장의 침체가 전망된다. 이에 4차 산업혁명의 발전된 기술을 활용해 그간 축적된 데이터를 연구한다면, 향후 해외 건설사업 관리의 역량 및 경쟁력을 키울 수 있을 것이다. 따라서 이 연구에서는 중동 건설시장에서 공정지연과 주요 분쟁의 원인으로 대두되고 있는 공사변경의 상향된 프로젝트 관리 방안을 제시하고자 하였다. 우선 실제 해외 플랜트 건설사례를 분석하여 6가지 주요 공사변경 원인을 도출하였고, 이에 따라 영향을 받는 요인을 8가지로 분류하였다. 특히 머신러닝 기반의 다양한 Feature Selection 기법을 활용해 중요도를 계량화된 수치를 평가함으로써 공사변경과 영향 요인 사이의 유의미한 관계를 파악 하였다. 이를 통해 프로젝트 관리 측면에서 내부적으로는 공사변경의 명확한 관리 방향 수립이 가능하고, 대외적으로는 협상 기간 단축으로 추가적인 공기 지연을 방지하고 비용지출 관리가 가능할 것이라고 판단된다.