• 제목/요약/키워드: Construction Order Construction

검색결과 7,870건 처리시간 0.032초

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

퍼지 계층분석 모형을 이용한 최적 방수 시공업체 선정에 관한 연구 (A Study on the Selection of Waterproofing Construction Firms using Fuzzy-AHP Model)

  • 신진학;이선규;송제영;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.11-14
    • /
    • 2012
  • The category for waterproofing is one of construction process most affected by falling-off in price competitiveness, construction quality, and material performance. Therefore, in order to select of waterproofing construction firms, it is necessary to consider Incorporating both price competitiveness and construction quality. In this article, I would like to analyze 10 Factors for Selecting using fuzzy-AHP model, including the survey of the waterproofing experts. This fuzzy-AHP model can be shown to calculate the fuzzy trigonometrical function to reflect weights for preference of 10 factors for the waterproofing construction firms. It was found from the result that waterproofing construction firms was searched order of priority for select by fuzzy-AHP model.

  • PDF

Urban facility construction planning system using location-time information

  • Shin, Jaehyeon;Lee, Sang-Joon;Kwak, Ho-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권1호
    • /
    • pp.187-195
    • /
    • 2019
  • In this paper, a shared model of systematic urban facility construction planning system is proposed. As the scope of construction on urban facilities has expanded, the construction process may occur simultaneously in the same location and short period of time by the different public agencies. This kind of construction duplications may cause the inefficiency of construction time and cost. In order to improve this, we studied the sharing method of the construction information which are produced by the different construction agencies. And also studied the method of find out the duplicate constructions occurring in the same place and short period of time. And Then we suggest a system that can rearrange the order of urban facility construction.

초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 - (Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods -)

  • 현동명;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

New Construction of Order-Preserving Encryption Based on Order-Revealing Encryption

  • Kim, Kee Sung
    • Journal of Information Processing Systems
    • /
    • 제15권5호
    • /
    • pp.1211-1217
    • /
    • 2019
  • Developing methods to search over an encrypted database (EDB) have received a lot of attention in the last few years. Among them, order-revealing encryption (OREnc) and order-preserving encryption (OPEnc) are the core parts in the case of range queries. Recently, some ideally-secure OPEnc schemes whose ciphertexts reveal no additional information beyond the order of the underlying plaintexts have been proposed. However, these schemes either require a large round complexity or a large persistent client-side storage of size O(n) where n denotes the number of encrypted items stored in EDB. In this work, we propose a new construction of an efficient OPEnc scheme based on an OREnc scheme. Security of our construction inherits the security of the underlying OREnc scheme. Moreover, we also show that the construction of a non-interactive ideally-secure OPEnc scheme with a constant client-side storage is theoretically possible from our construction.

시공사례 분석을 통한 모듈러 주택 원가절감 우선순위 항목 도출 (Priority Derivation of Modular House Cost Reduction Factors through Case Analysis)

  • 류국무;문예지;조병후
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.66-67
    • /
    • 2016
  • Modular construction is attracting attention as the solution of recent problems in construction site. Such as lack of construction workforce, increasing labor costs, work delay due to extreme weather events and strengthening government regulations. However, despite the many advantages, Modular construction has not been activated dueto high construction costs compared to other construction methods. Accordingly, the object of this study is priority derivation of prefabricated house cost reduction factors and use as basic research data. For research performance, we have analyzed the blueprint and bill of quantities of a modular construction based public dormitory which was built in 2013. In result, the proportion of modular construction and on-site construction is 66% and 34%, and the construction cost proportion by activity was devided in to construction(79%), machinery(7%), electricity(5%) and civil(9%). Among these results in order to reduce costs, interior finishing(19.4) steel-frame(16.9%), metal works(13.5%), RC(11.8%), joinery(7.3%) is the order requires focused management.

  • PDF

기획·발주, 설계, 건설사업관리 부분의 건설안전관리 향상에 대한 연구 (A Study on the Improvement of Safety Management of Plan/Order, Design, and Construction Business Management)

  • 윤형구;권용준;오병한;권영일;윤영근;오태근
    • 한국안전학회지
    • /
    • 제35권4호
    • /
    • pp.56-63
    • /
    • 2020
  • The government has established various policies focusing on accident prevention to reduce the accident rate in the construction industry, but the effect is still insignificant. These results allude that there are still many problems in terms of usability. Although construction safety accidents usually have characteristics that occur during construction, the laws and systems should include the pre-construction cycle (plan/order - design - construction business management- construction) to eliminate risk factors in advance. The purpose of this study is to analyze the performance evaluation of the construction safety system before construction rather than during construction. In the pre-construction phase (plan/ order-design-constuction business management), we intend to investigate and analyze measures to prevent safety accidents and identify a system that lacks the ability to implement. Specifically, we analyzed what to focus on as precautionary measures in the planning, ordering, designing, and supervising. To improve them, we made a questionnaire based on the role related to construction safety for each subject, and seek implications for lack of performance through interviews. Based on the results, some ways to improve the safety system were proposed.

Influence of Climate Change on the Lifecycle of Construction Projects at Gaza Strip

  • El-Sawalhi, Nabil;Mahdi, Mahdi
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.1-10
    • /
    • 2015
  • There is a high confidence based on scientific evidence that climate is changing over time. Now climate change is considered as one of the challenges facing the construction industry. As no project is risk free and climate change has a strong impact on the different phases of the construction project lifecycle. This research aimed at providing a platform of knowledge for the construction management practitioners about the impacts of climate change on the construction projects lifecycle, identify the most dangerous climate change factors on the construction project lifecycle, and identify the most affected phase by climate change factors through the construction projects lifecycle. The study depended on the opinions of civil engineers who have worked in the construction projects field among the reality of Gaza Strip. Questionnaire tool was adopted as the main research methodology in order to achieve the desired objectives. The questionnaire included 127 factors in order to obtain responses from 88 construction practitioners out of 98 representing 89.79% response rate about the influence of climate change on the generic lifecycle of construction projects. The results deduced that the most significant influence on the construction project lifecycle was related to the extreme weather events, rainfall change, and temperature change respectively. There was a general agreement between the respondents that the most affected phase by temperature, rainfall, and extreme weather events is the execution phase. The results also asserted with a high responses scale on the need to alternative procedures and clear strategies in order to face the climate change within construction industry.

다중시공방식에서 합리적인 공사 분리발주 방안 (A study on the Construction Procurement System at Multi-Trade Contract Method)

  • 김세범;전민창;이상범;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.62-63
    • /
    • 2015
  • In this paper, to prevent overspending of the CM Fee, Agent CM for the normal work-oriented, Willing to separate order model being used in the construction, using a multi-national grouping Go to offer the right company, a number of groups according to the appropriate CM Fee setting is aimed to suggest a reasonable basis. This paper does not use the domestic point of order characteristic of the model, and using a different theory of affinity grouping projection method is presented. The main disadvantage of the domestic order model because it is a contractual relationship, the contractual relationship as unified as possible by the most reasonable way of construction and construction capabilities and commercialization agreement upon the ability of companies also expect to be very helpful. The grouping by using the multi-order construction of the separation problem of the increase and thus the management object construction type administration was to solve the problem.

  • PDF

시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구 (Institutional Research for the Introduction of Construction Management at Risk in the Public Sector)

  • 박지호;김경래;배병윤
    • 한국건설관리학회논문집
    • /
    • 제22권4호
    • /
    • pp.20-28
    • /
    • 2021
  • 국내 건설산업은 시공자 중심의 일방적인 생산방식에서 발주자와 시공자의 협업이 가능한 생산방식으로 변화하는 과정에 있다. 발주 방식에 따라 입·낙찰 방식, 계약 방식, 그리고 발주자의 사업 관여 정도도 달라질 수 있다. 본 논문에서는 국내 환경에 적합한 '시공책임형 건설사업관리' 도입을 위해서 국·내외 제도 분석과 입·낙찰 프로세스 분석, 계약이행 및 관리 분석, 사후관리 분석을 하고, 법제화를 위한 관련 법령 조문화와 제도의 효율적 운영을 위한 방안을 제시하고자 국·내외 시공책임형 건설사업관리의 제도 및 사례분석을 실시하였다. 건설산업기본법에 정의된 '시공책임형 건설사업관리'는 Pre-Con 업무를 수행하는 용역계약인 본 계약 이전 계약과 건설사업관리 및 공사계약인 본 계약으로 구분된다. 그러므로 '시공책임형 건설사업관리'는 해외의 사례와 같이 낙찰제도가 아니라 발주 방식의 하나로 보아야 하며, 도입을 위해서 설계/시공 일괄입찰, 기술제안 입찰과 동등한 입찰제도로서의 법제화가 필요하다. 국내 환경에 적합한 '시공책임형 건설사업관리' 도입을 위해서 국·내외 제도 분석과 입·낙찰 프로세스 분석, 계약이행 및 관리분석, 사후관리 분석을 하고, 법제화를 위한 관련 법령 조문의 개정과 제도의 효율적인 운영을 위한 방법을 본 제도의 본래 장점은 유지하면서 국내 시장에서 적용이 가능하도록 제시하였다.