• Title/Summary/Keyword: Construction Operation

Search Result 3,102, Processing Time 0.029 seconds

Recent Progress in Air Conditioning and Refrigeration Research - A Review of papers Published in the Korean Journal of Air-Conditioning and Refrigeration Engineering in 1998 and 1999 - (공기조화, 냉동 분야의 최근 연구 동향 - 1998년 1999년 학회지 논문에 대한 종합적 고찰 -)

  • 이재헌;김광우;김병주;이재효;김우승;조형희;김민수
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.12
    • /
    • pp.1098-1125
    • /
    • 2000
  • A review on the papers published in the Korean Journal of Air-Conditioning and Refrigerating Engineering in 1998 and 1999 has been done. Focus has been put on current status of research in the aspect of heating, cooling, ventilation, sanitation and building environment. The conclusions are as follows. 1) A review of the recent studies on fluid flow, turbomachinery and pipe-network shows that many experimental investigations are conducted in applications of impingement jets. Researches on turbulent flows, pipe flows, pipe-networks are focused on analyses of practical systems and prediction of system performance. The results of noise reduction in the turbomachinery are also reported. 2) A review of the recent studies on heat transfer analysis and heat exchanger shows that there were many papers on the channel flow with the application to the design of heat exchanger in the heat transfer analysis. Various experimental and numerical papers on heat exchanger were also published, however, there were few papers available for the analysis of whole system including heat exchanger. 3) A review of the recent studies on heat pump system have focused on the multi-type system and the heat pump cycle to utilize treated sewage as the heat source. The defrosting and the frosting behaviors in the fin-tube heat exchanger is experimentally examined by several authors. Several papers on the ice storage cooling system are presented to show the dynamic simulation program and optimal operation conditions. The study on the micro heat pipes for the cooling of high power electronic components is carried out to examine the characteristics of heat and mass transfer processed. In addition to these, new type of separate thermosyphon is studied experimentally. 4) The recent studies on refrigeration/air conditioning system have focused on the system performance and efficiency for new alternative refrigerants. New systems operating with natural refrigerants are drawing lots of attention. In addition to these, evaporation and condensation heat transfer characteristics of traditional and new refrigerants are investigated for plain tubes and also for microfin tubes. Capillary tubes and orifice are main topics of research as expansion devices and studies on thermophysical properties of new refrigerants and refrigerant/oil mixtures are widely carried out. 5) A review of the recent studies on absorption cooling system shows that numerous experimental and analytical studies on the improvement of absorber performance have been presented. Dynamic analysis of compressor have been performed to understand its vibration characteristics. However research works on tow-phase flow and heat transfer, which could be encountered in the refrigeration system and various phase-change heat exchanger, were seemed to be insufficient. 6) A review of recent studies on duct system shows that the methods for circuit analysis, and flow balancing have been presented. Researches on ventilation are focused on the measurement of ventilation efficiency, and variation of ventilation efficiency with ventilation methods by numerous experimental and numerical studies. Furthermore, many studies have been conducted in real building in order to estimate indoor thermal environments. Many research works to get some information for cooling tower design have been performed but are insufficient. 7) A review on the recent studies on architectural thermal environment and building mechanical systems design shows that thermal comfort analysis is sitting environment, thermal performance analysis of Korean traditional building structures., and evaluation of building environmental load have been performed. However research works to improve the performance of mechanical system design and construction technology were seemed to be insufficient.

  • PDF

A Legal Study on Safety Management System (항공안전관리에 관한 법적 고찰)

  • So, Jae-Seon;Lee, Chang-Kyu
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.29 no.1
    • /
    • pp.3-32
    • /
    • 2014
  • Safety Management System is the aviation industry policy for while operating the aircraft, to ensure the safety crew, aircraft and passengers. For operating a safe aircraft, in order to establish the international technical standards, the International Civil Aviation Organization has established the Annex 19 of the Convention on International Civil Aviation. As a result, member country was supposed to be in accordance with the policy of the International Civil Aviation Organization, to accept the international standard of domestic air law. The South Korean government announced that it would promote active safety management strategy in primary aviation policy master plan of 2012. And, by integrating and state safety programmes(ssp) and safety management system(sms) for the safe management of Annex 19 is to enforce the policy on aviation safety standards. State safety programmes(ssp) is a system of activities for the aim of strengthening the safety and integrated management of the activities of government. State safety programmes(ssp) is important on the basis of the data of the risk information. Collecting aviation hazard information is necessary for efficient operation of the state safety programmes(ssp) Korean government must implement the strategy required to comply with aviation methods and standards of the International Civil Aviation Organization. Airlines, must strive to safety features for safety culture construction and improvement of safety management is realized. It is necessary to make regulations on the basis of the aviation practice, for aviation safety regulatory requirements, aviation safety should reflect the opinion of the aviation industry.

Study on the Selecting of Suitable Sites for Integrated Riparian Eco-belts Connecting Dam Floodplains and Riparian Zone - Case Study of Daecheong Reservoir in Geum-river Basin - (댐 홍수터와 수변구역을 연계한 통합형 수변생태벨트 적지 선정방안 연구 - 금강 수계 대청호 사례 연구 -)

  • Bahn, Gwonsoo;Cho, Myeonghyeon;Kang, Jeonkyeong;Kim, Leehyung
    • Journal of Wetlands Research
    • /
    • v.23 no.4
    • /
    • pp.327-341
    • /
    • 2021
  • The riparian eco-belt is an efficient technique that can reduce non-point pollution sources in the basin and improve ecological connectivity and health. In Korea, a legal system for the construction and management of riparian eco-belts is in operation. However, it is currently excluded that rivers and floodplains in dam reservoir that are advantageous for buffer functions such as control of non-point pollutants and ecological habitats. Accordingly, this study presented and analyzed a plan to select a site for an integrated riparian ecol-belt that comprehensively evaluates the water quality and ecosystem characteristics of each dam floodplain and riparian zone for the Daecheong Dam basin in Geum River watershed. First, the Daecheong Dam basin was divided into 138 sub-basin with GIS, and the riparian zone adjacent to the dam floodplain was analyzed. Sixteen evaluation factors related to the ecosystem and water quality impact that affect the selection of integrated riparian eco-belt were decided, and weights for the importance of each factor were set through AHP analysis. The priority of site suitability was derived by conducting an integrated evaluation by applying weights to sub-basin by floodplains and riparian zone factors. In order to determine whether the sites derived through GIS site analysis are sutiable for actual implementation, five sites were inspected according to three factors: land use, pollution sources, and ecological connectivity. As a result, it was confirmed that all sites were appropriate to apply integrated riparian ecol-belt. It is judged that the riparian eco-belt site analysis technique proposed through this study can be applied as a useful tool when establishing an integrated riparian zone management policy in the future. However, it might be necessary to experiment various evaluation factors and weights for each item according to the characteristics and issues of each dam. Additional research need to be conducted on elaborated conservation and restoration strategies considering the Green-Blue Network aspect, evaluation of ecosystem services, and interconnection between related laws and policy and its improvements.

A study on the management of drawings of Metropolitan Rapid Transit (도시철도 도면 관리에 관한 연구 -서울시 도시철도공사를 중심으로-)

  • Kim, Miyon
    • The Korean Journal of Archival Studies
    • /
    • no.11
    • /
    • pp.181-214
    • /
    • 2005
  • Metropolitan rapid transit system plays an essential role in the public transportation system of any large city, and its managing agency is usually charged with the responsibility of storing and managing the design drawings of the system. The drawings are important and historically valuable documents that must be kept permanently because they contain comprehensive data that is used to manage and maintain the system. However, no study has been performed in Korea on how well agencies are preserving and managing these records. Seoul Metropolitan Rapid Transit Corporation(SMRT) is the managing agency established by the city of Seoul to operate subway lines 5, 6, 7, and 8 more efficiently to serve its citizens. By the Act on Records Management in Public Institutions(ARMPI), SMRT should establish a records center to manage its records. Furthermore, all drawings produced by SMRT and other third party entities should be in compliance with the Act. However, SMRT, as a form of local public corporation, can establish a records center by its own way. Accordingly, the National Archives & Records Service(NARS) has very little control over SMRT. Therefore, the purpose of this study is to research and analyze the present state of storage and management of the drawings of metropolitan rapid transit in SMRT and is to find a desirable method of preservation and management for drawings of metropolitan rapid transit. In the process of the study, it was found that a records center is being considered to manage only general official documents and not to manage the drawings as required by ARMPI. SMRT does not have a records center, and the environment of management on the drawings is very poor. Although there is a plan to develop a new management system for the drawings, it will be non-compliant of ARMPI. What's happening at SMRT does not reflect the state of all other cities' metropolitan rapid transit records management systems, but the state of creation of records center of local public corporation is the almost same state as SMRT. There should be continuous education and many studies conducted in order to manage the drawings of metropolitan rapid transit efficiently by records management system. This study proposes a records center based on both professional records centers and union records centers. Although metropolitan rapid transit is constructed and managed by each local public corporation, the overall characteristics and processes of metropolitan rapid transit projects are similar in nature. In consideration of huge quantity, complexity and specialty of drawings produced and used during construction and operation of metropolitan rapid transit, and overlap of each local public corporation's effort and cost of the storage and management of the drawings, they need to be managed in a professional and united way. As an example of professional records center, there is the National Personnel Records Center(NPRC) in St. Louis, Missouri. NPRC is one of the National Archives and Records Administration's largest operations and a central repository of personnel-related records on former and present federal employees and the military. It provides extensive information to government agencies, military veterans, former federal employees, family members, as well as researchers and historians. As an example of union records center, there is the Chinese Union Dangansil. It was established by several institutions and organizations, so united management of records can be performed and human efforts and facilities can be saved. We should establish a professional and united records center which manages drawings of metropolitan rapid transit and provides service to researchers and the public as well as members of the related institutions. This study can be an impetus to improve interest on management of not only drawings of metropolitan rapid transit but also drawings of various public facilities.

Comparison of the wall clock time for extracting remote sensing data in Hierarchical Data Format using Geospatial Data Abstraction Library by operating system and compiler (운영 체제와 컴파일러에 따른 Geospatial Data Abstraction Library의 Hierarchical Data Format 형식 원격 탐사 자료 추출 속도 비교)

  • Yoo, Byoung Hyun;Kim, Kwang Soo;Lee, Jihye
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.21 no.1
    • /
    • pp.65-73
    • /
    • 2019
  • The MODIS (Moderate Resolution Imaging Spectroradiometer) data in Hierarchical Data Format (HDF) have been processed using the Geospatial Data Abstraction Library (GDAL). Because of a relatively large data size, it would be preferable to build and install the data analysis tool with greater computing performance, which would differ by operating system and the form of distribution, e.g., source code or binary package. The objective of this study was to examine the performance of the GDAL for processing the HDF files, which would guide construction of a computer system for remote sensing data analysis. The differences in execution time were compared between environments under which the GDAL was installed. The wall clock time was measured after extracting data for each variable in the MODIS data file using a tool built lining against GDAL under a combination of operating systems (Ubuntu and openSUSE), compilers (GNU and Intel), and distribution forms. The MOD07 product, which contains atmosphere data, were processed for eight 2-D variables and two 3-D variables. The GDAL compiled with Intel compiler under Ubuntu had the shortest computation time. For openSUSE, the GDAL compiled using GNU and intel compilers had greater performance for 2-D and 3-D variables, respectively. It was found that the wall clock time was considerably long for the GDAL complied with "--with-hdf4=no" configuration option or RPM package manager under openSUSE. These results indicated that the choice of the environments under which the GDAL is installed, e.g., operation system or compiler, would have a considerable impact on the performance of a system for processing remote sensing data. Application of parallel computing approaches would improve the performance of the data processing for the HDF files, which merits further evaluation of these computational methods.

A Study for establishment of soil moisture station in mountain terrain (1): the representative analysis of soil moisture for construction of Cosmic-ray verification system (산악 지형에서의 토양수분 관측소 구축을 위한 연구(1): Cosmic-ray 검증시스템 구축을 위한 토양수분량 대표성 분석 연구)

  • Kim, Kiyoung;Jung, Sungwon;Lee, Yeongil
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.1
    • /
    • pp.51-60
    • /
    • 2019
  • The major purpose of this study is to construct an in-situ soil moisture verification network employing Frequency Domain Reflectometry (FDR) sensors for Cosmic-ray soil moisture observation system operation as well as long-term field-scale soil moisture monitoring. The test bed of Cosmic-ray and FDR verification network system was established at the Sulma Catchment, in connection with the existing instrumentations for integrated data provision of various hydrologic variables. This test bed includes one Cosmic-ray Neutron Probe (CRNP) and ten FDR stations with four different measurement depths (10 cm, 20 cm, 30 cm, and 40 cm) at each station, and has been operating since July 2018. Furthermore, to assess the reliability of the in-situ verification network, the volumetric water content data measured by FDR sensors were compared to those calculated through the core sampling method. The evaluation results of FDR sensors- measured soil moisture against sampling method during the study period indicated a reasonable agreement, with average values of $bias=-0.03m^3/m^3$ and RMSE $0.03m^3/m^3$, revealing that this FDR network is adequate to provide long-term reliable field-scale soil moisture monitoring at Sulmacheon basin. In addition, soil moisture time series observed at all FDR stations during the study period generally respond well to the rainfall events; and at some locations, the characteristics of rainfall water intercepted by canopy were also identified. The Temporal Stability Analysis (TSA) was performed for all FDR stations located within the CRNP footprint at each measurement depth to determine the representative locations for field-average soil moisture at different soil profiles of the verification network. The TSA results showed that superior performances were obtained at FDR 5 for 10 cm depth, FDR 8 for 20 cm depth, FDR2 for 30 cm depth, and FDR1 for 40 cm depth, respectively; demonstrating that those aforementioned stations can be regarded as temporal stable locations to represent field mean soil moisture measurements at their corresponding measurement depths. Although the limit on study duration has been presented, the analysis results of this study can provide useful knowledge on soil moisture variability and stability at the test bed, as well as supporting the utilization of the Cosmic-ray observation system for long-term field-scale soil moisture monitoring.

A Basic Study on the Performance Improvement of Safety Certification Standards (안전인증기준 성능화에 대한 기반 연구)

  • Byeon, Jung-Hwan;Kim, Jung-Gon
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.3
    • /
    • pp.487-499
    • /
    • 2021
  • Purpose:The purpose of the paper is to review the problems of performance enhancement of safety certification standards and to suggest directions for improvement in order to rationalize safety certification standards for future industrial development and environmental changes. Method: The problems and limitations of the safety certification system are summarized through literature review and interview with manager, and the status of safety certification standards is classified into design standards, performance standards, and detailed standards, and the status analysis is performed. In addition, by synthesizing the results of the investigation and analysis, improvements are suggested to improve the performance of the safety certification standards. Result: Through the survey, the problems and limitations of safety certification could be grouped into six categories: government-led certification system operation, standardized certification standards, long time required to improve certification, poor certification standards preparation system, and lack of reflection of industry opinions. And, as a result of analyzing the certification standards by dividing them into performance and design standards, in the case of machinery, equipment, and protection devices, the design standards were high at 69.7% and 64.9%, whereas in the case of protective equipment, the performance standards were high at 61.1%. In order to improve the performance of safety certification standards centered on design standards, it is necessary to determine the possibility of performance enhancement of the certification standards and determine the feasibility of the inspection test method. In order to improve performance, it was reviewed that it was necessary to establish a systemic foundation and infrastructure, such as strengthening the Product Liability Act, systematizing market monitoring, etc., distributing certification test tasks, and participating in the preparation of certification standards by the private sector. Conclusion: Through this study, the problems and limitations of Korea's safety certification system were summarized and the necessity for performance improvement was reviewed. Performance improvement of safety certification standards is a matter that requires preparatory work, such as legislative revision and infrastructure construction, and requires mid-to-long-term promotion. In addition, rather than improving the overall safety certification standards, the performance requirements for each item subject to certification should be reviewed and promoted, and details should be specified through additional research.

Studies on the Structure and Function of the Subsidiary Baekje Temple Building Attachments - Focusing on the Buyeo Wangheungsa Temple - (백제 사찰 부속건물지의 구조와 기능 - 부여 왕흥사지를 중심으로 -)

  • Lee, Sangil
    • Korean Journal of Heritage: History & Science
    • /
    • v.54 no.1
    • /
    • pp.138-163
    • /
    • 2021
  • The Buyeo Wangheungsa Temple was excavated 15 times by the Buyeo National Research Institute of Cultural Heritage by 2015. In doing this, it was confirmed that the attached buildings were placed in the east and west along with the central Sangharama building. Various building sites were established in the western section of the temple, and various buildings were placed inside, and this pattern was estimated in the eastern section. In this article, the structure and function of the attached buildings of the Wangheungsa Temple were focused on the planar structure and excavated artifacts. The most distinctive feature of the attached buildings of the Wangheungsa Temple is their construction alongside the central Sangharama building. It is different from the building to the Neungsan-ri Temple, which was expanded gradually. The attached buildings in the east and west of the lecture hall are presumed to be living space for monks who used solitary rooms, and the attached buildings in the east and west of the main hall were a combination of public work space used for things such as administration, ceremonies, and reception. Next, looking at the outer space of the central Sangharama, the western section was likely constructed at the same time as the central Sangharama. However, if you look at the building site inside the western section, the function has been changed in two stages. The first stage was a ritual space, and it is evident that the western section has a separate entrance and sidewalk and that the workshop was used as a monastery space in the second stage. Finally, there is a distinct possibility that the eastern part of the complex was an important section. Although this space is presumed to be composed of triple towers and halls, it must be have been approached in various ways and included structures related to the operation of temples, such as the monastery space. From this point on, the overall appearance of Baekje temples can be recovered through access to temple structures in a wide variety of ways, including studies of the attached buildings.

Research on the Measures and Driving Force behind the Three Major Works of Daesoon Jinrihoe in North Korea in Case of the Respective Types of Unification on the Korean Peninsula (한반도 통일 유형별 북한지역의 대순진리회 3대 중요사업 추진 여건과 방안 연구)

  • Park, Young-taek
    • Journal of the Daesoon Academy of Sciences
    • /
    • v.39
    • /
    • pp.137-174
    • /
    • 2021
  • The main theme of this paper centers on how to promote Three Major Works of Daesoon Jinrihoe, charity aid, social welfare, and education projects, during the unification period. Determining the best methods of promotion is crucial because the Three Major Works must be carried out after unification, and the works must remain based on the practice of the philosophy of Haewon-sangsaeng (the Resolution of Grievances for Mutual Beneficence). The idea of Haewon-sangsaeng is in line with the preface of the U.N. Charter and the aim of world peace. North Korean residents are suffering from starvation under their devastated economy, which is certain to face a crisis of materialistic deficiency during reunification. In this study, the peaceful unification of Germany, unification under a period of sudden changes in Yemen, and the militarized unification of Vietnam were taken as case studies to diagnose and analyze the conditions which would affect the implementation of the Three Major Works. These three styles of unification commonly required a considerable budget and other forms of support to carry out the Three Major Works. Especially if unification were to occur after a period of sudden changes, this would require solutions to issues of food, shelter, and medical support due to the loss of numerous lives and the destruction of infrastructure. On the other hand, the UNHCR model was analyzed to determine the implications of expanding mental well prepared and sufficiently qualified professionals, reorganizing standard organizations within complex situations, task direction, preparing sufficient relief goods, budgeting, securing bases in border areas with North Korea, and establishing networks for sponsorship. Based on this, eight detailed tasks in the field of system construction could be used by the operators of the Three Major Works to prepare for unification. Additionally, nine tasks for review were presented in consideration of the timing of unification and the current situation between South and North Korea. In conclusion, in the event of unification, the Three Major Works should not be neglected during the transition period. The manual "Three Major Works during the Unification Period" should include strategic points on organizational formation and mission implementation, forward base and base operation, security and logistics preparation, public relations and external cooperation, safety measures, and transportation and contact systems.

A Study on Evaluating the Possibility of Monitoring Ships of CAS500-1 Images Based on YOLO Algorithm: A Case Study of a Busan New Port and an Oakland Port in California (YOLO 알고리즘 기반 국토위성영상의 선박 모니터링 가능성 평가 연구: 부산 신항과 캘리포니아 오클랜드항을 대상으로)

  • Park, Sangchul;Park, Yeongbin;Jang, Soyeong;Kim, Tae-Ho
    • Korean Journal of Remote Sensing
    • /
    • v.38 no.6_1
    • /
    • pp.1463-1478
    • /
    • 2022
  • Maritime transport accounts for 99.7% of the exports and imports of the Republic of Korea; therefore, developing a vessel monitoring system for efficient operation is of significant interest. Several studies have focused on tracking and monitoring vessel movements based on automatic identification system (AIS) data; however, ships without AIS have limited monitoring and tracking ability. High-resolution optical satellite images can provide the missing layer of information in AIS-based monitoring systems because they can identify non-AIS vessels and small ships over a wide range. Therefore, it is necessary to investigate vessel monitoring and small vessel classification systems using high-resolution optical satellite images. This study examined the possibility of developing ship monitoring systems using Compact Advanced Satellite 500-1 (CAS500-1) satellite images by first training a deep learning model using satellite image data and then performing detection in other images. To determine the effectiveness of the proposed method, the learning data was acquired from ships in the Yellow Sea and its major ports, and the detection model was established using the You Only Look Once (YOLO) algorithm. The ship detection performance was evaluated for a domestic and an international port. The results obtained using the detection model in ships in the anchorage and berth areas were compared with the ship classification information obtained using AIS, and an accuracy of 85.5% and 70% was achieved using domestic and international classification models, respectively. The results indicate that high-resolution satellite images can be used in mooring ships for vessel monitoring. The developed approach can potentially be used in vessel tracking and monitoring systems at major ports around the world if the accuracy of the detection model is improved through continuous learning data construction.