LCC 평가를 통한 지붕방수공법선정에 관한 연구 (A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing)

  • 최오영;김태희;김광희
    • 한국건축시공학회지
    • /
    • 제8권5호
    • /
    • pp.127-134
    • /
    • 2008
  • The purpose of this study is to propose the decision making technique in roof waterproofing method at the early construction stage. Selecting the suitable construction method is difficult because of the complex interrelationships between many factors of influencing the construction method selection. This study presents an example of selecting suitable method by analyzing LCC (Life Cycle Cost) in roof waterproofing work. In this study, roof waterproofing method is analyzed by LCC(Life Cycle Cost) which is consists of the initial costs, running costs, and removal costs. Sheet waterproofing, membrane waterproofing and asphalt waterproofing costs are compared to select the most economic method. The result of this study revealed that considering LCC is useful in selecting the proper method in the construction work.

하프슬래브를 이용한 PC 복합공법의 선정기준 개발 (Development of Selection Criteria for Composite Method Using Half-PC Slab)

  • 박병훈;김재엽
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.103-104
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. This study is a basic research in the construction management aspect regarding 'composite method using hollow-PC column' (HPC method), and is intended to develop assessment standards for the benefit·cost analysis of HPC method. Assessment standards for the benefit·cost analysis were composed of main-factors and sub-factors through interview with 4 experts. It was possible to classify main-factors into 4 major categories, i.e,. structural performance, construction performance, construction duration and construction cost. Sub-factors were composed of factors which were of high importance in assessing the two methods. And factors judged to be repeated or of little importance were excluded.

  • PDF

외단열 고정 방법에 따른 부착강도 변화 (Other Changes in Bond Strength due to External Insulation Method)

  • 김태준;박완구;박진상;오정환;배기선;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.132-133
    • /
    • 2013
  • External Insulation Method is to place the insulation on the outside of concrete. External Insulation Method is better than Internal Insulation Method to the protection of structure. However, The phenomenon that External Insulation falling from the structure occurs frequently. Apply method of External Insulation is divided Wet Construction, Dry Construction and Wet & Dry Construction. The purpose of this study is to test Bonding Strength of External Insuation. Furthermore, on the basis of this study, External Insulation Method determines the effective development will be made.

  • PDF

토압 영향을 받는 Down-Up 지하공사 공법의 오픈 구간 균열 저감 방안 연구 (A Study on Crack Reduction Method in open Section of Down-Up Underground Construction Method Affected by Earth Pressure)

  • 심학보;전현수;석원균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.196-197
    • /
    • 2021
  • The underground method can be divided into Top-Down, Semi-Top-Down, Up-Up and Down-Up methods according to the construction order of the upper and lower structures. Among them, the Down-Up method proceeds with the construction of the first floor and its lower floors, and when the foundation is completed, the vertical members of the basement are sequentially completed from the foundation and the above-ground floor is constructed. In this paper, the crack reduction method around the open section of the Down-Up method affected by earth pressure was analyzed and divided into design and construction parts.

  • PDF

지반과 관련된 지난 세기의 건설사고와 정보화 시공 (A Review of the Last Century Construction Failures and the Observational Method in Geotechnical Engineering)

  • 김학문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술세미나 논문집
    • /
    • pp.1-36
    • /
    • 2000
  • Construction incidents, mechanisms and causes in Geotechnical Engineering have been closely reviewed for the safety assurance during design and construction stages. The safety assurance is clearly related to the observational method in which design is reviewed during construction and contingency actions are undertaken successfully to minimise any potential failures. The observational method has been extensively applied for the construction of subways underground structures, dams and many important Civil Engineering projects in the past 20 years. But the number of serious construction incidents are growing for the past several decades. Therefore present development of observational method and improvement techniques are introduced with some case histories.

  • PDF

군집시설물 건설공사의 안전점검 대가 산정모델 제안 및 평가 (Proposal and Evaluation of the Safety Inspection Cost Estimation Model for Multi-building Construction Project)

  • 김진원;방종대;손정락
    • 대한건축학회논문집:구조계
    • /
    • 제33권12호
    • /
    • pp.11-18
    • /
    • 2017
  • The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.

GFI를 활용한 건설공사 시공VE 대안평가 방법 (Alternative Evaluation Method of GFI-based Construction Value Engineering)

  • 김수용;이영록;양진국
    • 한국건설관리학회논문집
    • /
    • 제16권3호
    • /
    • pp.3-10
    • /
    • 2015
  • 건설 프로젝트의 VE는 크게 설계단계 VE와 시공단계 VE로 분류된다. 설계단계 VE는 정부의 법률에 의해 100억 원 이상의 공공 건설공사에 적용해야만 한다. 따라서 설계VE는 건설 프로젝트에 적극적으로 적용되고 있다. 이와는 대조적으로, 시공 VE는 제한된 특정 건설 프로젝트에 적용되고 있다. 그 이유는 시공 VE 프로세스가 실무적 요구 품질을 반영 할 수 없기 때문이다. 시공 VE는 시공 가능성에 대한 타당성 검증을 통해 긍정적인 효과를 구현할 수 있다. 이에 본 연구에서는 실무를 반영한 시공 VE의 방법을 제안하고자 한다. 제안 방법은 직관지수(G.F.I.)를 활용한 전문가 기반의 대안평가 방법이며, 제안 방법의 적용성을 검증하기 위해 실무사례에 적용하였다. 그 결과 제안된 대안평가 방법은 기존의 방법보다 적용 절차, 적용 방법 측면에서 효율성이 높은 것으로 나타났다.

모듈러 공법의 시공 프로세스 기반 시공 오차 관리 의사 결정 모델 (Decision Model of Construction Errors Management Based on Modular Method Construction Process)

  • 신현규;김수영;안용한
    • 한국건설관리학회논문집
    • /
    • 제18권6호
    • /
    • pp.98-108
    • /
    • 2017
  • 최근 모듈러 공법을 활용한 중 고층 건축 기술이 개발되면서 현장 시공 오차 관리의 중요성이 부각되었다. 모듈러 공법은 공장 생산 특성 때문에 현장에서 시공 오차를 조정하는 것이 매우 제한적이다. 따라서 시공 오차를 사전에 예방하기 위해서는 모듈러 공법 특성을 반영한 관리 방안이 필요하며 각 단계별 공사 참여자의 의사 결정이 중요하다. 이에 본 연구에서는 모듈러 공사 시공 오차 요인을 분석하고, 시공 프로세스 기반의 시공 오차 관리 방안 의사 결정 지원 모델을 제안하였다. 본 연구의 결과물은 모듈러 공사 참여자가 시공 오차 관리 방안을 도출하는데 가이드라인 역할을 할 수 있을 것이라 기대한다.

대공간 건축물 지붕공사의 시공기법선정을 위한 기초연구 (A preliminary Study on Selection of Construction Method for Roofing work in Large-Scale Structures)

  • 김대길;홍주영;이명도;엄진업;김대원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.247-248
    • /
    • 2016
  • Globally the interest of large-scale structure has been increasing for the use in various social and cultural events. However various problems for building large-scale structure in South Korea are expected in terms of construction method and site management due to the lack of experience. Construction method and planning significantly affects on making decisions. There are only theoretical approach for constructing large-scale building in domestic with the limited experience of constructing constrained size structure. Through Analytic Hierarchy Process with experts, derived decision factors mostly used construction method in construction of large-scale structure. Derived factors from this study will support making decisions for field management in constructing large-scale structure.

  • PDF

프리캐스트 스팬 공법을 적용한 고속철도 연속교 시공 (Construction of Continuous Bridges in Hi8h-Speed Railway using Precast Span Method)

  • 김성일;김성호;이원표;윤철수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.401-407
    • /
    • 2001
  • Out of 412km long Kyung-bu high-speed railway, 302km was designed in tile form of either bridges or tunnels. Most of bridges were designed to be prestressed concrete box girder type. The precast span method was selected because of good quality of bridge section secured by factory manufacturing, fast construction speed, low construction cost with mechanized construction and the safety fur field workers. The precast span method has been mainly utilized in bridges consisted of repeated simple spans. However, we applied the precast span method to continuous bridge for high-speed railway Since it was the first attempt to apply ate precast span method to a continuous bridge for high-speed railway, many design and construction details were studied and implemented in the construction. Design and construction processes of a continuous bridge construction using tile precast span mettled are briefly described in this paper.

  • PDF