• Title/Summary/Keyword: Construction Management Professional

Search Result 247, Processing Time 0.019 seconds

Extraction of the Key Performance Indicators of Construction Management Using Balanced Score Card (균형성과표를 활용한 건설사업관리의 핵심성과지표 도출)

  • Lim, Wooseok;Jung, Jihyun;Lee, Hakki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.22-30
    • /
    • 2015
  • Enterprises should set up realizable goals and continually control the goals from apprehending whether they can be realized or not so that the enterprises grow consistently. Furthermore, from supplementing parts to be improved, goals are reset and the result should be controlled in order to fit to them. Lately, a lot of discussions about the results of organizations, projects, and companies are being realized in construction field. Particularly, in construction management, effective and professional control activities throughout the life cycle of facilities as well as the stage of business implementation of construction work are needed. About the result measurement of the construction management, lots of most domestic researches stay in the level of establishing basic concepts. Also, since characteristics of the construction field and the construction management were not reflected properly, it is in a situation that the result control system is not applied to on-site real works. Hence, this study intends to suggest fundamental data for measuring objective results from extracting result areas and key performance indicators of the construction management using Balanced Score Card.

Impact of Introduction of Construction Labor Providers System and Improvement Plan (건설노무제공자제도의 도입에 따른 영향 및 개선방안)

  • Ahn, Hye-Kyun;Seo, Hee-Chang;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.149-152
    • /
    • 2010
  • Construction labor provider system is requested system by professional construction companys of profitless caused by directly hire of construction labor and labor management of difficulty after construction participants system abolition. Complemental laws which occured problems of Payment of wages, illegal subcontracting In construction participants system is prepared and no complemental point included in revised bill. but Construction labor groups oppose introduction of Construction labor provider system because groups concern to occurr before problem in construction participants system. The purpose of this study is drawn satisfactory system to Specialty contractor and construction worker.

  • PDF

Special safety measures and health education survey and study on the construction industry (건설업에서 특별안전보건교육의 실태조사 및 대책 연구)

  • Shin, Sung Su;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.123-134
    • /
    • 2015
  • This study is a study for finding a solution to the current situation and identify problems such as discharge through a survey of special health and safety training in the construction industry. In particular by identifying the status and problems, such as special health and safety training in the construction industry it was carried out for the purpose of the measures taken.

A Study on the Role of Construction Management in the Construction Turn-Key Projects (턴키사업과 CM의 역할)

  • Kim Kyung-Nam;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.223-232
    • /
    • 2002
  • The government, in order to settle and activate the use of Construction Management (CM) method, clarified the legal Issues pertaining to infrastructure development and is taking an active role to promote CM through government sponsored pilot projects. However, when a CM method is applied to a turn-key protect, many applicational difficulites are expected. With design and construction are performed under the simple responsibility in a turn-key method, roles of CM's is overlapped. Also, the characteristics of turn-key method are not reflected to the present $\lceil$CM Work Guideline$\rfloor$. Over the years, various problems have been identified from turn-key projects. Korea's $\lceil$CM Work Guideline$\rfloor$ is more inclusive compared to the CM services of CMAA and overlooks the importance of CM's roles in pre-design phase. In this study, CM's roles of pre-construction phase (pre-bidding, bidding, detail design, contracting) in construction turn-key projects were identified and complementary policy for institution was suggested. We further look into dividing the roles of the CM at turn-key project Into professional role and emotional role. Also, we speculate problems of the existing experience in turn-key projects and suggest a rough methodology on how these concepts can be adjusted for improve the turn-key method.

  • PDF

Safety Management Factor Analysis of Expert Perceptions Based on 4M Method for Plant Construction Phase (플랜트 시설물 시공단계의 4M기법을 활용한 전문가 인식조사에 의한 안전관리요인 분석)

  • Kim, Kyujin;Choi, Byungsun;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.18-27
    • /
    • 2016
  • The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.

The Design and Construction Management of Exposed Concrete Finish Work through the Construction Process Analysis (노출콘크리트 마감공법의 시공 프로세스 분석을 통한 설계 시공관리 방안)

  • Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.160-170
    • /
    • 2005
  • Because designers want to express various elevation, architectural concrete has recently paid attention to finish material and has increasingly used in the construction. architectural concrete needs more careful and professional supervision works such as controling quality of color, texture, construction plan, and design plan. none the less, It is not clear to define process and manage methods for the construction life-cycle, which causes the expense to increase and the quality to be poor. this study will analyze concrete finish method by dividing three parts which are common, exposed and architectural concrete finish method. definition and the limit of application in architectural concrete finish method will be present by comparing three methods. Throughout an interview with a staff in charge and a case study, this paper shows the requirement and the keynote of management which are divided by three steps; the design, construction and maintenance. finally, this research provides management methods of individual steps for effective construction.

Automatic indoor progress monitoring using BIM and computer vision

  • Deng, Yichuan;Hong, Hao;Luo, Han;Deng, Hui
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.252-259
    • /
    • 2017
  • Nowadays, the existing manual method for recording actual progress of the construction site has some drawbacks, such as great reliance on the experience of professional engineers, work-intensive, time consuming and error prone. A method integrating computer vision and BIM(Building Information Modeling) is presented for indoor automatic progress monitoring. The developed method can accurately calculate the engineering quantity of target component in the time-lapse images. Firstly, sample images of on-site target are collected for training the classifier. After the construction images are identified by edge detection and classifier, a voting algorithm based on mathematical geometry and vector operation will divide the target contour. Then, according to the camera calibration principle, the image pixel coordinates are conversed into the real world Coordinate and the real coordinates would be corrected with the help of the geometric information in BIM model. Finally, the actual engineering quantity is calculated.

  • PDF

The Study on the Accidents analysis and preventive measures from a excavator (굴삭기로 인한 재해분석 및 예방대책에 관한 연구)

  • Lee, Yong-Soo;Gang, Yong-Tak;Kim, Jin-Su;Kim, Chang-Eun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.283-297
    • /
    • 2010
  • This study carried out the investigation about the actual conditions of the management, disaster analysis and safety awareness on excavator in one of construction equipment and tried to make it's preventive measures. To achieve this, first of all, the accident of the internal Construction Industry process Investigation and Analysis, and then analyze an cause of accident based on it. Next, For the conditions of safety management conduct a survey to Investigation and Analysis and Propose preventive measures. The results of this study can be summarized as follows. 1st, Status of safety awareness and management of construction equipment tend to seek quickly and easily for the interests of sight. 2nd, Half the precincts of the equipment is causing major disaster. 3rd, The risk of excavator operation's indicators and drivers is so much potential. 4th, The preventive measures are needed for strengthening safety education, professional legal education, changes in safety awareness, the development of prevention system.

  • PDF

Introduction of Integrated Management of Satellite Imagery Information

  • Chae, Gee-Ju;Yoon, Geun-Won;Hwang, Tae-Hyun;Park, Jong-Hyun
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.197-201
    • /
    • 2002
  • The high prices of satellite images prevent researchers from studying remote sensing and most non-professional people doesn't have the simple and easy solutions for the manipulation of satellite images. "Integrated Management of Satellite Imagery Information" project which will be promoted by ETRI (Electronics and Telecommunications Research Institute) will provide the solutions for the above mentioned problems. We will introduce the archiving center in this study. This includes the data construction, storage, management and distribution. We first review the background for this archiving center and introduce the interior and foreign institutes which archive and distribute satellite images. We review our H/W system and S/W system briefly. Finally, the further service of our project will be suggested. Since we will distribute the satellite images (Landsat, SPOT, JERS, Corona, Kompast-1) and will receive Landsat7 ETM+ in 2003 you, this will help the professional work dealing with the satellite image and attract the non-professional people for simple and easy manipulation solutions of satellite image.

  • PDF

Suggestion of Project Information Management System for Small & Medium Sized Construction Companies through Analysis of Information Management Structure (프로젝트 정보관리체계 분석을 통한 중소건설업체 프로젝트 정보관리시스템 모델 제안)

  • Lee Tai-Sik;Koo Ja-Kyung;Lee Sang-Yub;Kim Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.549-552
    • /
    • 2003
  • Small & medium-sized construction companies(SMCC), they has lot's of problem like poor finance, a lack of specialists, and a shortage of professional skill. So the basic condition of SMCC is not good for small construction companies. In this situation, moreover SMCC has been influenced by big-sired construction companies(BCC) difficult after the crisis of economics of Korea, IMF. Therefore it is necessary that we strengthen competitive power of SMCC for survival. This research is about project management for SMCC. We analized information system which is developed from SI corporation and BCC. As this research, we want to build and organize project information management system for SMCC. This will make SMCC have more competitiveness and increase productivity efficiency, skill for information management of project given.

  • PDF