• Title/Summary/Keyword: Construction Management Professional

Search Result 247, Processing Time 0.022 seconds

Disaster analysis and risk assessment studies of the foreign worker construction site (외국인근로자 건설현장의 재해분석 및 위험성 연구평가)

  • Shin, Sung Su;Bae, Young Bok;Ha, Haeng Bong;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.35-45
    • /
    • 2015
  • Total industrial accident rate in Korea is facing a record 0.7% for 10 years since 2000. After entering the continuous versus 0.6% (0.69%) in 2010. In 2011, the decrease was reduced to 0.65%. Conversely In contrast to foreign workers' share has increased dramatically over 10 years since 2000 to 2010 are expected to be difficult in the accident rate of 0.5% for the entry. Despite the ongoing disaster reduction efforts to reduce disaster (share) of foreign workers has been increasing rapidly Survey, Whilst the provision of disaster prevention system status and problem analysis and identify measures that can be established through such disaster reduction measures are urgently needed.

The Improvement of Work Structure in the Private Investment SOC Project (민자 SOC사업의 시공단계 업무체계 개선방향)

  • Kim Daejin;Shin Seungtae;Lee Younghwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.486-489
    • /
    • 2004
  • To enlarge the international competition and construction productivity, the domestic construction market attracts the private capital and expands the facility of :iocial Overhead Capital(SOC). However, the application of the business system used at the public project didn't utilize the effect of social overhead capital. It caused problems that parties' business was inefficient and their allotment of the risk was inadequate. This paper presents the course to reorganize the business system which the coincides with the origin aim of the SOC. For the reformation of the supervisor's work scope and business system and the government's overall project management, in other words, this paper proposes the professional organization to replace the superintendence and the formation of optimal business system. This paper confirms the privity of contract among parties of SOC project and parties' work scope and system between relative laws and concession agreement that government made a contract with Special purpose Company (SPC).

  • PDF

A Study on Assesment of Aalidity of Introducing of Design·Construction·Supervision Register Criteria Measures for Hazardous Materials Facilities (위험물시설의 설계·시공·감리업 등록제 도입에 대한 타당성 검토에 관한 연구)

  • Cha, Jung-Min;Lee, Yong-Jae;Kim, In-Beom;Hyun, Seong-Ho
    • Fire Science and Engineering
    • /
    • v.29 no.1
    • /
    • pp.27-37
    • /
    • 2015
  • This study is to analyze current inadequate status of installing hazardous materials facilities, and to propose rational standards by researching validity for implementing registration for design, construction, supervision for installing fire safety facilities. By studying installation of registering designing, constructing, supervising industry on hazardous material facilities, professional and higher level of stability measures for national hazardous material facility was provided. For above reasons, necessity of institutionalizing of registering standards for construction and supervising industry became clear. Much more gradual institutionalization is needed for construction industry. Moreover, new national qualification should be reconsidered, in order to rebuttal the above and also to cultivate and acquire technical power.

Performance Evaluation of Premier Global Construction Engineer Training Program (글로벌 건설 엔지니어링 고급인력 양성사업의 성과평가)

  • Park, Hyeon;Park, Inseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.97-104
    • /
    • 2018
  • This paper aims to evaluate the performance of S University's Premier Global Construction Engineer Training Program. The net impact of the program is evaluated through a quasi-experiment design approach. The competency level of an individual participant is compared with that of a non-participating expert with similar professional background. The results show that the training program contributed to a significant improvement in the professional competencies of the participating students. The competency level was regressed on the subjects of curriculum. The achievements are attributable to a group of subjects focused on the skills for project development such as PPP, feasibility study, and project financing. Another group of subjects found to have significantly contributed to the improved competencies can be categorized as subjects focused on nurturing global perspectives. The paper shows it is possible to quantify the contribution of the program and the results provide a set of information that can be useful in designing and operating similar programs.

Improvement of Global Construction Engineer Training Program : An Importance-Satisfaction Analysis (글로벌 건설 엔지니어링 고급인력 양성사업의 교육프로그램 개선방안)

  • Park, Hyeon;Park, In-Seok;Cha, Yongwoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.31-39
    • /
    • 2016
  • This study aims to give suggestions based on survey to improve the quality of Global Construction Engineer Training Program in line with the government goals. The domestic construction industry in Korea has kept shrinking, whereas the global construction market is forecasted to keep expanding in the future. It has become an urgent task to be taken up for construction contractors and engineering firms so as to improve their capacity, in particular, in the fields of planning, management, finance as well as engineering. To deal with the lack of capacity of the domestic engineers and to help them emerge as global players in the competitive overseas construction market, the Ministry of Land, Infrastructure and Transport of the Korean government has designed a program called 'Global Construction Engineer Training Program.' The eligible target of the training program is mid-career professionals who are working for the construction contractors or engineering firms. To draw suggestions for this program, an importance-satisfaction analysis is conducted to evaluate the effectiveness of the training program implemented by the S University. The S University, along with C University, was selected as an implementation organization of the program in 2014 by the government. Through an email survey, the participating students in the program were asked questions on the importance and satisfaction against 17 indicators classified into 5 categories: instruction method, professional knowledge of instructors, contents of program, curriculum, and facility and environment. The survey results show that students are satisfied with the overall quality of the program, but it was also found that they want the program opens more coursework on practical application of knowledge, case studies, and global networking.

A Study on the Contractor's Liability for the Defects in the Public Construction Works (공공건설사업의 하자에 대한 수급인의 책임에 관한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2002
  • Although Public Construction Works in Korea have been executed according to Government Contract Act, and nature of contract is very complicated. So it is difficult to define liability for the defects. Therefore the studies on the defective performance and contractor's defects liability were remained one of the non-cultivated virgin land. As a result, contract privy waive the right to claim or generally resolve the problems. Therefore domestic and overseas liability for the defects was investigated and liability for the defects, under and after construction, on the defective performance and defects, was analysed. With a literature research, contractor's defect liability was systematically analyzed, problems were defined and resolution of the problem were suggested item by item in this study.

  • PDF

VFM Analysis of Private Investment Project for Education Facilities in Private School (사립대학 교육시설 민간투자사업의 적격성분석에 관한 연구)

  • Jung, Boo-Jin;Kim, Soo-Yong;Park, Young-Min
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.615-618
    • /
    • 2008
  • From the 2006 report of Korea Foundation for the Promotion of Private school(KFPP), Private college account for 97% and private university account for 79% of the all college in country. The report shows that private college invest in educational facilities about 200 million won every year. But the standard of investment analysis which is for the private business of private college is not arranged, private college could not make progress the business. Accordingly the research is suggested "eligibility analysis method theory" that is a basic to make decision. At first in case of Quantitative VFM analysis, we suggest alternative analysis & progress procedure in analysis step. And in case of qualitative VFM analysis, we developed 15 items of analysis which is made with professional interviews.

  • PDF

Air Diving Operation, Management and Planning for Safe and Effective Underwater Works (안전하고 효율적인 수중작업을 위한 공기잠수의 계획·운용·관리)

  • Lee, Woo Dong;Kim, Sung Gil;Kim, Myeong Hoon;Lee, Jae Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.4
    • /
    • pp.103-110
    • /
    • 2019
  • Underwater works are indispensable in the coastal and ocean engineering fields, and the reliance on manpower is higher than land works. Divers who work for a long time in a high-pressure underwater environment are always exposed to the risks of diving-related diseases. To prevent them, proper planning, operation, and management of diving by a supervisor with professional diving knowledge are required. This study provides the basic data for supervisors to plan, operate, and manage air diving for safe and efficient work in underwater construction sites. It is well-known that air diving simulations using the varying permeability model (VPM) require a longer decompression time as the water depth and the residence time in water increase. Therefore, it is crucial to have a proper surface interval through repetitive diving rather than single diving to improve the safety of the divers and the efficiency of underwater work. Furthermore, coastal and ocean engineers who manage and supervise underwater construction work must acquire expert knowledge on diving before they can plan, operate, and manage diving.

Influence of National Culture on Staff Preferences to Knowledge Sharing Practices: the Case of Saudi Arabia

  • Al Hazmi, Hassan S.J.;Mohamed, Sherif
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.454-458
    • /
    • 2015
  • A number of practices for sharing knowledge has been recommended in the literature. These practices, however, are considered to be applicable, universally. This assumption is challenged by this paper which empirically explores the relationship between national culture and knowledge sharing practices in the context of procuring educational buildings in Saudi Arabia. The paper reports on a research study with the aim to identify whether national culture dimensions could be significant variables that impact upon staff preferences in relation to project knowledge sharing practices. The paper critically reviews the literature to identify appropriate measures for knowledge sharing practices. It explores the means by which public sectors professional exchange project knowledge; evaluates policies and level of technical support needed to facilitate knowledge sharing, then proceeds to how employees perceive the benefits they will gain by practicing project knowledge sharing, and their role in this process. The paper tests the relationships among the research constructs based on data collected from 115 project managers responsible for the procurement of educational buildings in Saudi Arabia. The paper provides empirical evidence that the national culture has a significant influence on staff preferences. In light of the research findings the paper concludes with practical recommendations for project knowledge sharing practices that are in line with staff preferences and their cultural orientation. The recommendations should facilitate a more effective application of knowledge sharing practices.

  • PDF

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.