• 제목/요약/키워드: Construction Management Method (Best Practice)

검색결과 8건 처리시간 0.026초

건설공사 품질인증시스템 향상을 위한 품질인프라 및 핵심역량 도출에 관한 연구 (A Study on the construction quality infra and it's core confidency priority for enhancing construction certification system)

  • 이갑순;배영주
    • 대한안전경영과학회지
    • /
    • 제19권4호
    • /
    • pp.189-208
    • /
    • 2017
  • This study is for figuring out major components of construction quality infrastructure and suggesting improvement plan by benchmarking global best practice model and analyzing gap between the model and sample practice. Based on improvement plan, researcher could derive major characters and components of construction quality infrastructure, and also about the priority among core competency components of construction quality experts. The result showed that the 'human resource' was ranked the best priority followed by 'method' 'environment', 'equipment' among major characters and components of construction quality infrastructure. Also, for core competency components of construction quality experts, 'number of years in work places' was the best priority, and the 'professional knowledge on engineering' was another priority ranked. Far from general perception on competency components, 'academic education' ranked the last. It may allude that the current education system in this country is not effective in developing competency of quality engineers. In summary, this study shows professionalism of quality engineer is the most important thing in all the components.

Measuring Performance to Engage the Extended Project Team in Construction

  • Bal, Menoka;Bryde, David
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.1-10
    • /
    • 2015
  • In construction, stakeholders of extended project team play a key role in the overall project performance. Successful integration of stakeholders demands for good management practices at strategic, operational and project levels. Targets and measures to improve the stakeholder performance encourage the creativity and willingness of stakeholders of extended project team to develop the better ways to achieve the project objectives. This paper presents a generic descriptive method, showing how stakeholder's ability and influence impacts on project performance in the construction sector. The findings of a series of interviews with key informants are presented and the following main conclusion is drawn: improving project performance through stakeholder's contribution and measuring their performance can strengthen the project performance. This innovative approach which redefines the process of improving the project performance in construction projects will be of interest to those who intend to manage the projects in practice as well as to those who interested in advancing theory.

건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안 (Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance)

  • 고영진;차희성;신동우;김경래
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.3-13
    • /
    • 2012
  • 건설 산업에서는 프로젝트 관리에 대한 어려움이 높아짐에 따라 이러한 문제점을 해결할 수 있는 대안으로 성과관리의 중요성이 부각되고 있다. 하지만, 성과관리체계의 개발과 적용이 미흡하여 건설 프로젝트에 스스로의 수준을 파악하기 힘든 실정이다. 또한 우수한 프로젝트를 벤치마킹하기 위한 적합한 정보 제공이 힘들어 관리 전략을 수립함에 있어서 의사결정에 비효율적인 문제점이 있다. 그리고 프로젝트 성공에 영향을 미치는 요소들의 개선여부가 고려되지 않고 혼재 되어있어서 성과 관리 요소로서 성공요소를 적용하기 힘들다. 따라서 본 연구는 프로젝트 성공에 영향을 미치는 요소를 시공자의 노력에 따른 개선여부에 의해 분류하였고, 성과관리 요소로 이를 적용하였다. 그리고 건설 초기단계에서 시공자의 노력으로 개선 불가능한 성과관리 요소인 프로젝트 특성을 반영한 성과를 예측하기 위해, 프로젝트 특성이 성과에 미치는 영향을 성과달성 난이도로 도출하여 예측하였다. 또한 예측된 성과를 향상시키기 위해 성과와 공사 관리기법 간의 상관관계를 분석하여 성과 영역별로 시공자의 노력으로 개선 가능한 최적 공사 관리기법(Best Practices)을 규명하고, 이를 선정하는 방안을 제시하였다.

건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발 (Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics)

  • 차희성;김기현
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.82-90
    • /
    • 2013
  • 건설 산업의 속성상 프로젝트의 성과를 정량적으로 분석하기 위해서는 다양한 영향인자에 대한 고려가 필수적이다. 프로젝트의 특성과 성과와의 관계를 파악하고, 프로젝트에 가장 적합한 관리기법을 적용시켜서 프로젝트의 성과를 향상시키기 위해서는 성과관련 정보를 축적시켜 관리하기 위한 시스템적인 접근이 요구되고 있다. 그럼에도 불구하고 많은 성과관련 시스템들은 성과결과의 분석에만 치중하여 프로젝트의 특성이나 관리기법 등 성과에 영향을 미치는 인자에 대한 심도 있는 분석방법과 접근방식에 대한 고려 부족으로 인해 성과시스템의 활발한 적용을 기대할수 없었다. 이에 본 연구는 건설 프로젝트의 특성을 고려하여 성과를 사전에 예측하고 성과체계를 정량적으로 모델링할수 있는 성과정보시스템을 개발하는 데 목적을 두었다. 이를 위해 실제 사례프로젝트의 성과관련 정보를 바탕으로 성과결과와 프로젝트 특성, 관리기법 간의 상관관계를 분석함으로써 해당 프로젝트에 가장 적합한 관리기법을 도출할수 있는 방안을 수립하였다. 그 결과, 성과영역별로 다양한 관점에서 프로젝트의 성과비교가 가능할 수 있는 정량화 방안을 정립하였고, 상관관계 분석을 통해 성과예측이 가능한 모델을 제안하였으며, 기존 데이터 분석을 통해 최적 관리기법을 선정할수 있는 시스템을 개발하였다. 웹기반 프로그램으로 구축된 시스템은 향후 데이터베이스의 지속한 관리와 보완을 통해서 성과정보의 양을 확대시킨다면 통계적으로 유의미한 결과를 바탕으로 신뢰성 있는 프로젝트 성과 관리를 도모할수 있을 것으로 사료된다.

Appropriate Methods in Determining the Event Mean Concentration and Pollutant Removal Efficiency of a Best Management Practice

  • Maniquiz, Marla C.;Choi, Ji-Yeon;Lee, So-Young;Cho, Hye-Jin;Kim, Lee-Hyung
    • Environmental Engineering Research
    • /
    • 제15권4호
    • /
    • pp.215-223
    • /
    • 2010
  • This study attempted to develop and suggest a more appropriate method for the determination of event mean concentration (EMC) and pollutant removal efficiency of a stormwater best management practice (BMP) considering rainfall. The stormwater runoff and hydrologic data gathered from 22 storm events during a 28-month monitoring period on a swirl and filtration type of BMP were used to evaluate the developed methods. Based on the findings, the modified EMC method resulted in lower (average) values than the overall EMC, although the differences were not significant (P>0.05). By comparison, the developed 'Rainfall Occurrence Ratio' (ROR) method was most significantly correlated (r=0.967 to 988, P<0.009) with the other existing removal efficiency determination methods such as the 'Efficiency Ratio' (ER), 'Summation of Loads' (SOL) and 'Regression of Loads' (ROL) methods. In addition, the ROR method gave the highest efficiency values, with no significant differences with any of the pollutant parameters, unlike the other three methods. These results were obtained because the ROR method integrated both pollutant loading and rainfall, which are not considered by the other three methods. Therefore, this study proved the suitability of the modified EMC and ROR methods for application in other BMP monitoring studies.

LID/BMPs 효과분석을 위한 LIDMOD2 개발 (LIDMOD2 Development for Evaluation of LID/BMPs)

  • 전지홍;최동혁;나은혜;박찬기;김태동
    • 한국물환경학회지
    • /
    • 제26권3호
    • /
    • pp.432-438
    • /
    • 2010
  • LIDMOD2 was developed for evaluation of low impact development (LID) and best management practice (BMP) by modification of Site Evaluation Tool (SET). The modification includes employment of SCS-CN method for annual runoff simulation, unit load method for annual pollutant loads simulation, and the method proposed by Korean TMDL for calculating pollutant reduction by BMPs. The CN values were updated with regionalized parameters within Nack-Dong River basin because these are important parameters for simulating hydrology. LIDMOD2 was tested by applying to Andong Bus terminal. As a simulation results, pollutant loads and surface runoff will be significantly increased by post-development without LID compared with those from pre-development. LID technique was simulated to efficiently reduce surface runoff and pollutant load and increase infiltration. LIDMOD2 is screening level tool and easy to use because LIDMOD2 is based on spread sheet and most of parameters are regionalized. LIDMOD2 was illustrate that it could evaluate LID well by summarizing and graphing annual hydrology, annual pollutant loading, and hydrograph for event storm. The calculation methods related with pollutant loads are employed from the guideline of Korean TMDL and it can be useful tool for Korean TMDL to evaluate the effect of LID/BMP on developing area.

Analytic Hierarchical Procedure and Economic Analysis of Pneumatic Pavement Crack Preparation Devices

  • Park, JeeWoong;Cho, Yong K.;Wang, Chao
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.44-52
    • /
    • 2015
  • Various approaches have been used in crack preparations and each of the approaches has advantages and disadvantages. Although the routing method has been widely used and seems to be the best approach among the approaches, it is not a complete solution for crack preparation. This paper compares and evaluates a pneumatic crack cleaning device (CCD) developed by Robotics and Intelligent Construction Automation group at Georgia Tech, over existing devices. Surveys were conducted to discover factors that affect the performance of crack/joint preparation work. Then, data for such information were collected via field tests for devices such as router, heat lancer, air blower and CCD. Performed field test results and follow-up interviews demonstrated that the utilization of CCD has potential to offer improvements in productivity, safety, and maintenance cost. An analytic hierarchical procedure (AHP) and economic analyses were conducted. The AHP analysis considered three factors including safety, quality and productivity while the economic analyses examined the alternatives in various ways. The results indicated that the CCD was ranked first and second for the AHP analysis and economic analysis, respectively. In conclusion, the field tests and results revealed that the utilization of CCD achieved satisfactorily in performance, quality, safety and control, and showed that it has high potential in crack cleaning practice.

공공건축물의 그린리모델링 수준별 LCC (Life Cycle Cost) 분석을 통한 경제성 비교 (The Economic Comparision through LCC Analysis on each Graded Alternatives for Green Remodeling of Public Building)

  • 김재문;이정혁;이두환
    • 한국건설관리학회논문집
    • /
    • 제19권2호
    • /
    • pp.38-49
    • /
    • 2018
  • 파리협약 비준 이후 온실감축에 대한 중요성 및 국가 의무가 커짐에 따라 정부에서는 건축산업의 온실가스 감축을 위한 정책을 지속적으로 강화해 나가고 있으며, 특히 노후건축물에 대한 에너지 성능개선의 필요성을 강조하고 있다. 2014년 이후 정부에서는 공공 노후건축물 그린리모델링 사업의 시공비 지원 등으로 시범사업을 운영 중에 있으며 이를 통해 그린리모델링의 모범사례를 개발하여 민간에 그린리모델링을 활성 시키고자 한다. 본 연구에서는 공공 노후건축물의 그린리모델링을 통한 수준별 경제성을 분석하였으며, 해당건물의 대안을 계획하기 위해 건물 육안조사 및 장비측정을 수행하였다. 개선안은 대안을 종합한 그린리모델링 계획안으로 수준별 5개의 개선안을 개발하여 각 안에 대한 경제성을 분석하였다. 분석방법은 ECO2를 통한 1차 에너지소요량 산정 및 LCC 분석을 진행하였으며, LCC 측면에서는 개선 3, 4안(중간수준 안)이 가장 우수한 것으로 분석되었으며, 다음으로 최대비용안, 최소 비용 안 순으로 결과가 도출되었다. 이 결과로 향후 진행될 그린리모델링 성능계획 및 경제성 분석 시 기초자료로서 활용이 가능 할 것으로 예상된다.