• Title/Summary/Keyword: Construction Labor

Search Result 736, Processing Time 0.026 seconds

A Study of Permanent Form System by Thin Precast Concrete Panel (II) (박판 프리캐스트 콘크리트 영구거푸집 시스템 연구 (II))

  • 남기룡;정문영;정문열;서치호;김윤일
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.749-754
    • /
    • 1997
  • Nowadays domestic building market has undergone several changes. Labor costs are too high and materials are in short supply. These raised building costs and therefore lowered productivity. At this point it is the best way to reduce manual labor and find alternative materials that can improve productivity. In the building process form work take the most part of it. So many formwork systems were developed to reduce the construction period and labor cost. But their technical improvements just limited to adjust form shape-the role of form is not changed. This research developed a new formwork systems that can function to unify or minimze the unit process with cast-in-place type permanent form. In former study (reported in '97 spring seminar), we did the assembling test with column and beam clamps. Furthermore, In this paper, we examined the total systems of form erections and evaluated the structural performances.

  • PDF

A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects (공공건설공사의 공기연장에 따른 추가간접비 산출을 위한 요율방식 제안)

  • Lee, Seung-Joon;Cha, Yongwoon;Han, Sangwon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.79-90
    • /
    • 2021
  • In domestic public construction, disputes are increasing due to differences among stakeholders regarding contract price adjustment. In particular, the actual cost-plus fee for overhead costs due to the schedule extension cannot be agreed upon at the administrative phase, and most of them seek judicial judgment. Thus, this study aims to propose a 'sufficiently satisfactory' alternative to reach an agreement before disputes in order to minimize disputes related to the calculation of additional overhead costs. To this end, this study proposes three alternatives based on the rate method. Firstly, when calculating additional overhead costs, it is not calculated as an actual cost-plus-fee method, but as a rate compared to direct labor costs among net direct costs. Secondly, the calculated indirect labor costs are compensated for up to the legal maximum of legal limit costs such as general management costs, profits and so on. Thirdly, it reflects overhead costs increased or decreased due to change orders. Risks were analyzed by collecting expert opinions on the proposed methods and applying actual cases. Finally, as a result of investigating the level of consensus for each stakeholder, it was confirmed that all stakeholders could agree regardless of the size of the company. The result of this study is expected to as a useful tool among stakeholders in the construction fields that can be able to easily agreed upon.

Need to Reduce Industrial Accidents through the Introduction of an Prevailing Wage System (적정임금제 도입을 통한 산업재해 감축 필요성 고찰)

  • Choonhwan Cho;Yeoncheol Shin;Kyung-Bo Han
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • In order to carry out construction work, it is urgent to introduce a proper wage system so that the cost burden of projects that have been won due to bleeding competition among original government buildings based on low-priced bids can be transferred to subcontractors. Purpose: Construction with illegal multi-level industrial structure needs to improve the wage reduction environment leading to order (100%) → original contractor (80%) → subcontractor (65%) → load contractor (65%) and aims to ensure wages for end workers. Method: Investigate the current status of labor cost appropriate payment plan in the construction industry, and investigate the case of the appropriate wage system (P.W) in the United States. In addition, the effect and direction of the appropriate wage system are presented. Result: Individual minimum wage security was also mentioned in the Constitution, and many researchers suggested that only the introduction of an appropriate wage system could solve the problem of reducing worker labor and ensure quality and safety. Conclusion: The proper wage system in the construction industry will block illegal multi-level and illegal foreign work, improve the labor environment in the construction market, create an influx of young workers, and have a significant impact on the construction industry's competitive structure, safety, and quality.

An Experimental Study on the Application of Lib-lath Form (리브라스 거푸집의 적용을 위한 실험적 연구)

  • Nam, Jung-Min;Park, Moo-Young;Lee, Young-Do;Jung, Sang-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.103-108
    • /
    • 2004
  • In order for concrete as a basic material constituting reinforced concrete structure to meet the required performance, it is necessary to satisfy various requirements in concrete construction. Among them, form work has significant effects not only on the process of molding fresh concrete but also on the quality and performance of hardened concrete. Recently, the decrease and aging of form workers is becoming a great problem in the construction industry and, as a result, it is required to rationalize form works and reduce labor costs for employing form workers. Because form construction methods decide the type of form according to required performance, it is necessary to develop various form construction methods and examine their performance. Thus the present study purposed to expand the scope of application of form construction methods and, for this purpose, investigated the basic characteristics of rib- lath form and presented a system form construction method.

Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication (복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출)

  • Lee, Dongmin;Jang, Sejun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.76-77
    • /
    • 2015
  • In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

  • PDF

A Study on the Prediction of SIP Piling Noise by Computer Simulation (Computer Simulation을 이용한 SIP 항타소음의 예측에 관한 연구)

  • 이병윤;윤해동;김재수
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.14-21
    • /
    • 2001
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Nevertheless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the characteristics and prediction of SIP piling noise. On the basis of measurement value, we analysed about prediction possibility of SIP piling noise by computer simulation.

  • PDF

Research on construction safety assessment topic areas -Focusing on domestic construction site- (건설안전 분야 평가항목에 대한 연구 -국내 건설공사현장을 중심으로-)

  • Ahn, Kwang Yong;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.1-12
    • /
    • 2015
  • Recent construction site large disaster occurs in, even normal disaster not be reduced, the efforts of pre-disaster prevention for this is also a need to study the evaluation index. By comprehensive examination zero reform the current lowest bid system has included the social responsibility index is scheduled, objective and quantitative evaluation indicators making construction safety areas that are included in the item of social responsibility is required ing. In this study, the construction, in order to prevent disasters, efforts pre disaster prevention be presented metrics in the construction safety in the field of comprehensive examination system and the evaluation index, it is intended to examine the evaluation items for the evaluation indices.

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

A Study on the Characteristics of Construction Noise by Sand Drain Method (Sand Drain 공법에 의한 작업시 발생하는 건설소음의 특성에 관한 연구)

  • Yun, Hae-Dong;Kim, Jae-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.500-505
    • /
    • 2000
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Neverthless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the characteristics of attenuation and propagation of Sand Drain Method in construction field. On the basis of measurement value, we analysed about prediction possibility of Sand Drain Method. This study also present a basic data found a effective plans for Sand Drain Method.

  • PDF