Focusing on complex diseases of public health significance, strategic issues regarding the on-going Korean Genome Cohort were reviewed: target size and diseases, measurements, study design issues, and follow-up strategy of the cohort. Considering the epidemiologic characteristics of Korean population as well as strengths and drawbacks of current research environment, we tried to tailor the experience of other existing cohorts into proposals for this Korean study. Currently 100,000 individuals have been participating the new Genome Cohort in Korea. Target size of de novo collection is recommended to be set as between 300,000 to 500,000. This target size would allow acceptable power to detect genetic and environmental factors of moderate effect size and possible interactions between them. Family units and/or special subgroups are recommended to parallel main body of adult individuals to increase the overall efficiency of the study. Given that response rate to the conventional re-contact method may not be satisfactory, successful follow-up is the main key to the achievement of the Korean Genome Cohort. Access to the central database such as National Health Insurance data can provide enormous potential for near-complete case detection. Efforts to build consensus amongst scientists from broad fields and stakeholders are crucial to unleash the centralized database as well as to refine the commitment of this national project.
In the absence of any guidance under statutory law, such as the Rules for Construction of Policy, MIA 1906, judges should follow the general principles of interpretation that apply to all contracts. In simple terms, Contra Proferentem Rule means that if the contents of the terms and conditions are ambiguous, they are interpreted against the writer of the terms and conditions. In the Anglo-American Contract Law, the 'default rule' is an important judicial tool that can supplement defects in contract norms and reinforce the principle of private autonomy through gap-filling techniques related to the interpretation of contracts. In Korea, it is sometimes mentioned in case of precedent, and it has been established as a clear rule. This study analyzes the interpretation of terms and conditions is not in the form that the interpretation of other general contracts and other interpretation principles are valid, but contracts based on terms and conditions are also contracts, and as a general rule, the interpretation of terms and conditions is explained like the general contract interpretation.
The elderly in South Korea in 2012 to 11.8% now aging fast-paced world, which is older than most countries. That is, as long as the elderly people lack the time to respond on the issue could cause many problems. According to the principle of social solidarity, long-term care insurance was introduced for the elderly since July 2008 and facility and sanction salaries were supported for the level 1 (the most serious illness) - level 3 (serious illness) elderly. On the other hand, in the fields of architecture, it is difficult to receive the contents of the unified related articles when the design and construction of the elderly welfare facilities take propel commissioned. This paper not only presents the elderly welfare facilities operated according to the institution and policy of elderly welfare facilities in terms of architecture, but also provides the criteria summarized by building facilities in the field of construction of elderly welfare facilities planning, planning, design is intended to provide basic information. This study addresses are as follows: First, the aging population of South Korea and welfare facilities for the elderly are addressed. Second, in terms of architecture, the institution and policy of elderly welfare facilities in South Korea, are addressed. Third, the construction criteria of elderly welfare facilities is summarized to help architectural practitioners understand. Fourth, the future direction of the architectural design of welfare facilities for the elderly is presented.
The Quantitative analysis for collapsion probability of each construcion work has not been developed, despite of that the one for safety management itself has been reported, up to now. It is concluded that showing critical check points against structure collapsion due to each work at construction site, and Quantifying those could be useful Quality-assuring tool, not to prevent Quality failure. Risk classes of each work at construction site, classified by German Builders Mutual-Aid Association (GEBMAS), and by special instruction rates of Korea Insurance Development Institute, are introduced to compare with the results of this study. As of a study method, total 2,002 sheets of questionwares are distributed directly to new city development areas, which are called, Ilsan 110 points : Pundang 79points and Chungdong 38points, including additional Changwon 125sheets and pusan 60sheets, by four(4) people, for contact with actual site engineers. Total responses of 1,056 sheets, are collected. Interrelationship diagram between experience years of Engrs., and risk rate of responses are also classified, with the criteria of four(4) years. Domestic journals with relation to construction have reported that main building Structure collapsions are mainly shown on apartment buildings and office ones. These two(2) building structures are again classified as five(5) kinds of works. This study takes use of an approach on haying the risk rates for each construction work on the above individual construction work. Additionally, site investigations have been performed to find out any possible unreasonable check items, due to construction method ; Reinforced Concret structure, Pre cast Concrete structure, and Steel structure building. Developed Quality Assurance Analysis Form with the Quantitative danger class, resulted from this study, are verified as it is able to be a good efficiency tool against collapsion of building structures.
건설사업에서 공공건설사업은 국가계약법령에 의해 집행되고 있고, 계약유형으로 볼 때 도급, 위임, 고용 등 복합적인 계약성질을 띠고 있으므로, 수급인의 하자책임을 단일화하여 규정하는 것이 쉽지 않다. 이로 인해 계약이행중 발생하는 불완전이행과 목적물 인수 후 발생하는 하자에 대한 수급인의 책임에 대한 적용 및 해석은 어려운 작업이 되어 왔다. 그리고 불완전이행이나 하자에 대한 연구는 활성화되지 못하였고, 불완전이행이나 하자관련 분쟁이 발생하게 될 경우 당사자 일방이 포기하거나 일반론적으로 접근하여 본질적인 문제해결을 이루지 못하였다. 따라서 공공건설사업에 있어서 수급인의 하자책임에 대해 심층적으로 고찰할 필요성이 있다. 이러한 문제점을 인식하여 본 연구에서는 건설공사의 하자나 불완전이행은 제조물책임법에서 규정하는 결함과는 다르므로 국내외 수급인의 하자책임에 대해 고찰한 후, 우리나라 국가계약법령에 근거한 수급인의 불완전이행 및 하자책임을 분석하여 문제점을 도출한 후 개선방안을 항목별로 도출하였다.
Purpose : Long-term Care Insurance sets up facility standard and installation standard of aged care facilities and decides the presence of minimum number of rooms and its size in care facilities by using systematic instruments. Therefore, most aged care facilities had renovation in expansion and reconstruction following the revised regulations and even facility space structure and space composition are continuously improving. The study is to determine the purpose and trend by comparing before and after space composition of facilities which followed the implementation of Long-term Care Insurance and also to suggest hierarchical space composition suitable for aged care facilities through derived problems and to provide basic materials to plan the most appropriate facility for the aged. Methods : J-graph based on Space Syntax Theory will be schematized through in-site facility survey and before and after facility floor plan. Space composition trend will be analyzed by comparing indexes through S3 program. Results : As a result of 5 cases analysis, the following results were found; the average of whole space depth is increasing due to the Extension, the number of volunteers is decreasing and rooms for geriatric care helpers are being created due to the geriatric care helper introduction duty. Also, there are solariums being created to improve the health of the aged and dispensaries are being placed on every floor with the increase of documentary work for geriatric care helpers. With the policy implementation, care facility space composition and structure are changing with facility standard and it was analyzed that facilities were mostly put under the control of limited number of people in care room and total ground area per person. It was also found that there is increase in care space integration through before and after comparison of whole integration value. This is considered as the important result not only in facility standard satisfaction, but also in care support of geriatric care helpers and the aged, its main users. Implication : In order for elderly care facilities to have quality improvement and to develop as suitable facilities for characteristics of the aged, independent environmental facility standard preparation of elderly care facilities is needed through mutual cooperation of construction fields with regulation and policy related researches.
우리 건설 산업의 국가전체산업 대비 기여현황을 살펴보면 제조업 대비 45%정도의 종사인원이나 산업생산 유발계수가 제조업과 거의 대등하고 부가가치 유발계수는 제조업보다 훨씬 높다. 이러한 건설 산업의 현장생산직 근로자들이 겪고 있는 열악한 근로실태와 개인 삶에 대한 현황을 조명하여 우리사회 구성원으로서의 동반자로서, 또 건설 직업인으로서 긍지를 갖고 직무에 충실할 수 있도록 정부와 업계가 함께 노력하여, 그들의 위상을 강화시킴으로서 한 차원 높은 건설생산문화가 유발될 수 있고 업계의 세계화에 따른 경쟁력 향상에도 이바지하게 될 것이다. 이러한 건설생산직 근로자들을 위한 전문적인 교육 훈련, 신분보장, 자격제도 확립, 사회보험혜택, 안정적 임금수령, 작업환경개선 등 전문 직업인으로서의 자부심을 가질 수 있는 제도화된 환경을 통하여 그동안의 실적위주 정량적 건설에서 정성적 건설로 변화하는 기틀을 마련하도록 하여야한다. 우리나라의 행복지수는 100점 만점기준 67.8점으로 OECD 30개 국가 중 25위에 그친다. 건설현장 근로의 보다나은 양질화를 유도하기 위하여 현장생산직 근로자들의 직업 및 사회적 자기만족도 향상을 위한 대책으로서 기존관습에서 탈피하여 개선시켜야하는 문제요소들을 도출, 정부와 업계가 함께 노력하여 점차 세계화되고 있는 우리건설업계의 국제경쟁력에 이바지할 수 있는 차원 높은 건설생산인력으로 변화시킬 수 있도록 해야 한다.
최근 세계적으로 기후 변화에 따라 태풍으로 인한 피해규모가 커지고 가속화되어 많은 피해를 받고 있는 중이다. 이에 몇몇 선진국의 경우, 태풍을 포함하여 다양한 자연재해로부터 건물에 미치는 손상을 최소한으로 하기 위해 건축물 피해액 사전예측 모델에 관한 연구가 진행되고 있는 추세이다. 하지만, 국내에서는 외국에서 개발된 프로그램을 사용하기에는 태풍의 크기나 영향력에서 많은 차이가 나므로 국내의 특성에 적합한 모델이 필요한 실정이다. 또한, 국내의 연구들은 태풍의 특성만을 고려하여 진행되고 있으나 태풍은 폭우와 강풍을 동반하는 복합재해로서 태풍의 특성뿐만 아니라 지리, 사회경제, 건설환경 등 다양한 요인을 고려하여야 한다. 이에 본 연구에서는 태풍에 따른 지역별 건물피해액 영향요인을 도출하고 회귀분석을 활용한 건물피해액 예측모델 개발을 목적으로 한다. 향후 본 연구의 결과는 미국의 HAZUS -MH와 같이 국내에서 태풍에 따른 피해를 예측하기 위한 모델 개발을 위한 자료로 활용될 것이다.
The international transactions of capital goods such as industrial plant exports, overseas constructions, and shipbuilding exports, are so huge that tremendous amount of funds are required, and that most of the loans are long-term credits of over five years. In the export of huge capital goods, financing is more crucial than technology itself. Some of the importing countries are developing ones that are politically and economically unstable. Therefore the financing mechanism for these transactions is conclusive in winning these projects. Global financial market instability caused by US sub-prime mortgage financial crisis expanded all over the world, and the international transactions have been decreased due to global credit crisis. This indicates how much influential the financing market is in international transactions. The financing schemes are classified into supplier credit and buyer credit by who provides the financing. A supplier credit is a credit extended by an exporter(seller) to an importer(buyer) as part of an export contract. Cover for this transaction may be extended by an export credit agency('ECA') to the exporter. In a sales contract a seller shall provide fund required to manufacture goods, and in a construction contract a contractor shall provide fund required to complete a construction. A buyer credit is an arrangement in which an exporter enters into a contract with an importer, which is financed by means of a loan agreement A Comparative Study on a Supplier Credit and a Buyer Credit in International Transactions of Capital Goods 155 where the borrower is the importer. In a sales contract a buyer shall provide fund required to manufacture and procure the goods, and in a construction contract an owner shall provide fund required to complete a construction. Therefore an exporter is paid on progressive payment method. A supplier credit and a buyer credit have their own advantages and disadvantages in the respect of the parties respectively. These two financing methods are selectively used considering financing conditions such as funding cost, importer's and/or exporter's financial conditions, importing country's political risk.
본 연구에서는 현행 설계기준상의 강관말뚝머리 연결부의 결합방법이 갖고 있는 철근 배근 및 정착길이 확보, 전단키 용접 등의 문제점을 개선하기 위해 퍼포본드 전단연결재(Perforated Rib Shear Connector)를 활용한 강관말뚝머리 보강방법을 고안하고 이에 대한 압발저항성능을 실험적으로 검증하였다. 그 결과 퍼포본드를 활용한 보강방법은 연직하중에 대해 기존 방법을 대체할만한 동등 수준이상의 구조 안전성은 물론 시공성 및 경제성 측면에서도 우수한 성능을 갖는 구조 시스템인 것으로 나타남에 따라 상부구조의 작용하중을 강관말뚝으로 전달하기 위한 효율적인 강관말뚝머리 연결부 보강방법의 하나로 자리매김할 것으로 사료된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.