A system of networked digital libraries will be a primary component of information infra-structure. The general strategy for digital libraries by the American university libraries is summarized as building of information infrastructure, content database construction, and project-based design. This paper describes the present feature and status of digital libray programs being implemented by the libraries of Michigan University, Carnegie Mellon University and Virginia PolyTech & State University.
Tilting trains are now an established feature of railway operations throughout the world. For intercity traffic, tilt provides operators with increasing speeds, and therefore enhanced competitiveness, on existing routes where insufficient traffic or a lack of funds precludes the construction of a dedicated new high-speed railway. This paper explains the reduction effects of journey time with the Korean tilting train. The Korean Tilting Train express (TTX) project has been carried out to develop alt the core technologies related to tilting train and infra-technology to provide high speed inter-city service with the speed of 180 km/h as well as maintenance-free technology for conventional railway system. In order to simulate we considered 5 conventional railway. As a results of simulation, we found out the tilting train has very high efficiency(reduction rate 20-30%).
Recently, as construction of information infra including high-speed communication networks remarkably expands, more various information services have been provided. Thus the number of internet users rapidly increases, and it results in heavy load on Web server and higher traffics on networks. The phenomena cause longer response time that means worse quality of service. To solve such problems, much effort has been attempted to loosen bottleneck on Web server, reduce traffic on networks and shorten response times by caching informations being accessed more frequently at the proxy server that is located near to clients. And it is also possible to improve internet performance further by allowing clients to share informations stored in proxy caches. In this paper, we perform simulations of hierarchical proxy caches with the 3-level 4-ary tree structure by using real web traces, and analyze cache hit ratio for various cache replacement policies and cache sizes when the delayed-store scheme is applied. According to simulation results, the delayed-store scheme increases the remote cache hit ratio, that improves quality of service by shortening the service response time.
Ubiquitous Computing is gradually accepting in our real society. Already some Advanced State has studying of Ubiquitous for more convenience Ubiquitous environment. Anywhere, Anytime user can be provided information and service that he want, but it has some problem such as Rogue AP, IP spoofing, DoS attack, Warm which can causing social confusion in Ubiquitous society. In this paper we must analysis that security requirement in the Ubiquitous network environment and investigate 'Ad hoc' and RFID which is main technique for network infra construction.
Journal of the Korea Institute of Building Construction
/
v.16
no.6
/
pp.535-544
/
2016
Korean government is promoting "K-Smart City" to overseas market which is an integrated solution of construction industry with ICT(Information and Communciations Technologies) industry. Due to nature of Smart City, construction quality and the development quality of the facilities need to be established to improve the overall quality. However, guidelines and regulations to initiate quality control for Smart City are behind the actual demand. This deficiency is bringing quality control for construction and ICT to be controlled separately causing lack of synergy and resulting in overall quality degradation. This research is designed to improve the construction quality of Smart City during its establishment stage by integrating ICT system with on-site construction (Integrated control center and on-site equipment). The adoption of this research to a real Smart City case had resulted in 22% reduction of construction inspection failure (Audit), and also allowed Construction Company to pre-align quality control of all purchased items of ICT Infra that resulted in 18% reduction of nonconformity, thus contributing to an overall quality improvement. This research is expected to be used widely among all construction industry of Smart City.
With rapidly changing multimedia environment, various artistic changes and digitalized up-to-date social infra, urban environment construction based on culture contents has been activated. The large image in front of urban building that is expressed as media-façade, increasing rapidly in a recent period, is not a new thing at all. In addition, IT technology molten in city space is testing the possibility of new media through the meeting with architecture. However, unlike its infra enlargement, the definition about media-façade is not clear so the system was constructed in a level of night lightscape or outdoor image advertisement. The purpose of this guideline is the regulation from the negative aspect rather than the possibility of various visual, artistic media expressions. Therefore, it could not show essential concept of media-façade. Moreover, most of companies or building owners focus on short-term profit and marketing effect rather than prepare various contents so they can not use constructed infra properly. After all, in many cases, they discolor the meaning of media-façade. This paper is a pilot study to grasp the current definition of media-façade to construct right guideline of media-façade. On the basis of this study, it will prepare academic definition of media-façade and construct the guideline for design evaluation.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.39
no.6
/
pp.491-496
/
2021
In line with the modern era in which the safety of underground facilities and the use of underground information are increasingly emphasized, the state is pushing for more precise and accurate underground spatial information to be secured and utilized. Therefore, we need to pay more attention to subsurface geospatial data. In the future, the Ministry of Land, Infrastructure and Transport will actively utilize the 15 types of Integrated Underground Geospatial Information Map(6 types of underground facilities, 6 types of underground structures, 3 types of ground) that the Ministry of Land, Infrastructure and Transport is building as three-dimensional underground spatial information, and contribute greatly to improving national safety and convenience in underground construction. expected to do However, when a site manager requests an Integrated Underground Geospatial Information Map with a mobile device, if the large-capacity integrated underground space map is not quickly transmitted over the wireless section and is not serviced, it causes inconvenience to the site manager and delays work. In this paper, the goal of this paper is to enable field managers to quickly receive a tiled Integrated Underground Geospatial Information Map with minimal information exchange. Therefore, the tiling system is configured according to the dataset for high-speed Mobile Integrated Underground Geospatial Information Map transmission. In addition, a transmission system for the Mobile Integrated Underground Geospatial Information Map is established, and a TCP/IP (Transmission Control Protocol/Internet Protocol)-based spatial information tiling transmission protocol dedicated to the on-site Integrated Underground Geospatial Information Map is developed.
In April, 1995, ANC government was established in South Africa. The Black government set up Truth and Reconciliation Committee in November, 1995. The Committee investigated approximately 50,000 cases for 3years. Through this process, Black and White in SA could be united into one. Finally, the system of racial discrimination, lasting for about 300 years, was abolished. The Committee played a role as a social infra-structure, which was to perform and solidify democracy in SA. Reconciliation, agreement, Participation, equality, Communication, and Reformation of law system were practically implemented by the Committee. Many people evaluate TRC's activity, which had the reformative and democratic character of the object of investigation, investigative criterion, investigative process, and the approval of investigative result. But De Klerk evaluates that TRC retaliated the White with legal. J. Cronin evaluates that TRC transiently change democracy of the South Africa, and many other social movement groups had a negative view about TRC. But the Black and White in South Africa transformed 'discriminated society' into 'united one'. The Committee took the initiative in such a change. The Committee was not an organization needed for the policy, but the committee was the policy itself to change the former society to the new one. Now The ANC government was forwarding TRC's roles and functions to the truth and reconciliation bureau of the Justice Department for further action. The ANC government has to execute some policy for social reconciliation. Firstly, the government needs to build construction social and national system for making close investigation into the White's historical guilt. Secondly, it must be executed to TRC's recommendation pursuit social reform of social infra-structure in the South Africa. Thirdly, The government should execute policy for the Black's right as labors and social member. Lastly, the government must investigate still-remaining historic state violence and infringement of human right for social reconciliation.
Kim, Junyoung;Yoon, Inseok;Jung, Minhyuk;Joo, Seonu;Park, Seungeun;Hong, Yeungmin;Cho, Jongwoo;Park, Moonseo
Korean Journal of Construction Engineering and Management
/
v.23
no.3
/
pp.3-12
/
2022
In general construction project planning ratio of manpower and quantity of outputs produced, such as the construction estimate standard, is used as the criterion for labor productivity. This method is highly effective in construction projects with repetitive work, however, there is a limit to apply in large-scale projects with high complexity. This is because the influence of non-work time caused by various work interruption factors that act complexly on the productivity of the project is greater than the average labor productivity derived from the performance data of the project. Therefore, this study proposes a productivity measurement method that can evaluate the characteristics of construction works and the cause of non-working time. To this end, first, detailed work processes and their non-work factors for each work type are defined, and the Adv-FMR technique is developed for quantitatively measuring them. Next, based on the concept of obtainable productivity, methods for comparative productivity analysis by work type, evaluating non-work factors, and deriving productivity improvement methods are proposed. Finally, a case study is conducted to validate that the analysis results based on Adv-FMR data can support the decision-making of construction managers on productivity management.
Logistics needs in Asia are surprisingly increasing due to rapid growth of China in Northeast Asia We are endeavoring to make an economic block in opposition to NAFTA and EU by economic revival, political stability, and easing of exclusive parts between countries as increasing of traffic infra such as asian highway, transcontinental railway in the region of Northeast Asia and as considering diversification of transportation mode. Now, Busan is not a final terminal of this business, and it is not a concreted level in considering an undersea tunnel between Korea and Japan as effort to extend to Japan. Therefore, this study performed an effect analysis which be affected to Northeast Asia and Korea in future by analysis and comparison of a cost and time required of marine transportation and railway before and after construction through course analysis and summary of discussed content until now for undersea tunnel between Korea and Japan. This result expects as a accelerative play for study cf undersea tunnel between Korea and Japan in future. In this result, we estimate that it is an effective things in a cost and time required if undersea tunnel between Korea and Japan is constructed, and we simply searched for theirs effects in the aspects of Northeast Asia, national balanced development, regional economic in Busan, and marine logistics.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.