• Title/Summary/Keyword: Construction Information System

Search Result 4,321, Processing Time 0.028 seconds

A Study on the Necessity for the Standardization of Information Classification System about Construction Products

  • Hong, Simhee;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.121-123
    • /
    • 2017
  • The widespread dissemination of the green building certification system has led to the ongoing development of information management technologies with the aim to effectively utilize construction product information. Among them, a data crawling technology enables to collect the data conveniently and to manage large volumes of construction product information in Korea and overseas. However, without a standardized classification system, it is difficult to efficiently utilize information, and problems such as an additional work for classifying information or information-sharing errors. Therefore, this study suggests to present a necessity for the standardization of the information classification system through expert interviews, and to compare construction product classification systems in Korea and overseas. This study is expected to present a necessity for the effective management of construction product information and the standardization of information-sharing with regard to various construction certifications.

  • PDF

Problem Analysis of Construction Material Information System (국내 건설자재정보시스템의 문제점 분석)

  • Park, Jun-Ho;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.164-165
    • /
    • 2013
  • Currently, the process of selecting products such as construction materials and equipment in the design phase proceeds based on the reuse of products used in the previous projects or samples from design companies as well as information on the limited products provided from the website of several manufactures. In particular, it is urgently required to formulate a standard product information management system that can be utilized in the BIM-based design environment these days. In Korea, domestic construction information classification system was developed, but its utilization has been underestimated since continuous studies on the practical usability are still lacking. Therefore, this paper derived problem of domestic construction materials information system by comparing with abroad material information system. Issues and implication is derived in terms of (1) Input information (2) Provide information, and (3) Utilize Information.

  • PDF

Proposal of an Application Characteristic Model of Information System for Construction Decision-making Support (건설 의사결정지원용 정보시스템 활용특성모델 제안)

  • Lee Jong-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.145-152
    • /
    • 2004
  • Many construction companies have developed many kinds of information system to integrate the information created in the phase of planning, design, procurement, construction, and maintenance of construction project. However, the previous researches for the state of applying information technologies and the efforts of the analysis of the present information system launched in domestic construction industry is very rare. There also has been short of research on the construction decision-making support theory in construction business and industry. Hence this paper would contribute in identifying the state of information technologies and the theory of decision-making support of the information system in general construction company. and suggest the characteristic model on the information system for the construction decision-making support. The model consists of the two dimensions; (1) organizational hierarchy (2) data analyzing technology. This research, especially, can be expected to initiate the discussion on framework for understanding the construction decision-making support system in construction industry. The model is nut a practical methodology, but a window that offers a new perspective un sources of information system in each construction company, and thus can provide a clue of the useful guide to construction information system development.

  • PDF

Assessment for Overseas Construction Information Classification Using Collaborative Filtering (협력적 필터링을 통한 건설정보 분류체계의 적정성 평가)

  • Choi, Wonyoung;Choi, Sangmin;Kwak, Seing-Jin
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.53 no.4
    • /
    • pp.361-372
    • /
    • 2019
  • The Overseas Construction Engineering Information System (OVICE), which is operated by the Korea Institute of Construction Technology, uses the Overseas Construction Information Service classification system to service information required for overseas construction of domestic construction engineering companies. In this study, through the application of the recommendation system using collaborative filtering, identifying the relationship between the subjects for real users, verifying the adequacy of the overseas construction information classification system currently in service. Through this, I would like to propose an information service classification system that reflects actual user demand.

USING GIS TO IMPROVE ROADWAY CONSTRUCTION PLANNING

  • Sanghyeok Kang;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.643-648
    • /
    • 2005
  • The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. GIS (Geographic Information System) is a very effective tool for integrating and managing various types of information including spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Interactive Space Scheduling' and 'Operation Level Planning' functions. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time. It is expected that the proposed system could improve the efficiency of roadway construction planning.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

A Study on the Management Information System for Supporting the Supervision of Construction Workplace (건설감리실무 지원을 위한 정보관리시스템 구축에 관한연구)

  • Noh, Dae-Won;Jeong, Byong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.85-93
    • /
    • 2003
  • The purpose of this study was to construct the management information system for supporting the supervision of construction workplace. For the purpose, firstly, this study surveyed the present states and the problems of construction workplace in Korea. And then, defined the range and the process of the supervision of construction workplace, and examined the information standards of construction and the CALS standards for supporting. As a result, this study proposed the first stage of management information system, which consists of several basic functions, such as, document management, system management and partially, duality management and construction information management.

The Regional Construction & Management Office Construction Management System Based On The Web (웹을 기반으로 한 지방청 공사현황 정보시스템 구축)

  • 서명배;강의석;김남곤
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.84-89
    • /
    • 2003
  • For running various construction processing information and technological information, it is supplied by Construction CALS/EC systems properly during whole facilities life cycle. So it is urgently necessary to change Regional Construction 8t Management Office (RCMO) equipment construction administration business to electron processing system (CALS/EC). From construction work plan to completion, a present storage documents system is unsystematic. Therefore, it needs management system to store documents and to read in turn documents properly. This research suggest that it is to connect with various information systems and Construction CALS/EC for RCMO which is running public construction field. So it can be driven systematic and effective administration system about public construction business by Web-based present construction situation information system.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF