• Title/Summary/Keyword: Construction IT

Search Result 22,456, Processing Time 0.052 seconds

Electronic Supervision System of Construction Facility by Construction IT (정보화에 의한 시설공사 감리업무 전자화방안)

  • Kang Leen-Seok;Moon Hyoun-Seok;Park Seo-Young;Lee Yang-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1143-1148
    • /
    • 2005
  • Recently, the application of construction IT (Information Technology) is recognized as an essential tool for the effective construction management and construction CALS. And the large construction projects are already using PMIS tool, and the application of construction IT tool will be accelerated by rapid popularization of computerized construction management system. This study defines a concept of construction IT and suggests an improved method to apply construction IT tool for construction supervision system.

  • PDF

A FUNDAMENTAL STUDY TO DEVELOP STANDARD TECHNOLOGY CRITERIA FOR IT-CONSTRUCTION FUSION TECHNOLOGIES, TO BE APPLIED TO A U-CITY

  • Kyoon-Tai Kim;Jae-Goo Han;Chang-Han Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1352-1358
    • /
    • 2009
  • As the demand for a convergence between construction technologies and IT is on the rise, as seen in the visualization of U-City construction, studies on the ways in which IT in should be utilized in the building and construction field have been continuously and actively performed. However, there has been almost no development of standardized technology criteria relating to the life cycle of a building (planning, design, construction, and maintenance). That is, there are almost no examples of efforts made to combine construction technology and IT in a fundamental way, considering the environment, the facility, its spatial characteristics, engineering, materials, and structure, aspects that are commonly required not only for interior spaces but also for exterior construction of U-City. Despite the fact that a state-of-the-art infrastructure has been built, and the competency of users with the cutting-edge technology, composite studies on technologies, facilities, services and spaces are still lacking, and basic research on the composite operation method including compatibility and linkage between facilities and services within a U-City has been insufficient as well. It is generally known that by fusing IT with construction technologies, the total period of construction taken can be reduced and construction expenses can be curtailed, while construction quality can be improved. For this reason, it is vital to prepare a standardized base to connect cutting-edge IT with the construction technologies. In preparing such a base, the most urgent issue is to develop standardized technology criteria. The ultimate objective of this research is to establish the technological criteria system required to apply construction-IT fused technologies to U-Cities, and to develop the technological criteria for the design, construction and maintenance of the U-Cities. This paper, whose objective is to establish development strategies for construction-IT fused technologies by way of analyzing the criteria for conventional construction projects, the necessity of criteria for construction-IT fused technologies, and the current status of U-Cities' development, is the underlying research for this purpose. The strategies established are expected to be utilized in establishing the system of criteria for construction-IT fused technologies, and to contribute to a knowledge base in the construction-IT field. In addition, based on the strategies established, criteria for construction-IT fused technologies, such as design criteria and construction standards, will be developed, and by applying these criteria and standards, the ultimate objectives of U-Cities, which are the enhancement of urban competitiveness and the satisfaction of residents, will be attained

  • PDF

A Preliminary Study on Change Management Factors through Analysing Development Phase of Construction IT System (건설 IT 시스템 발전단계분석을 통한 변화관리 요인 기초 연구)

  • Kim, Haneol;Lee, Dongheon;Lim, Hyoungchul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.214-215
    • /
    • 2022
  • This study analyzed the development stage and change management necessity of the construction IT system through existing research and literature review, and used WordCloud, one of the text mining techniques, to analyze current construction trends and major issues. The necessity of change management is derived by using existing research literature and construction-related social issues as analysis data.

  • PDF

The study on the Proposals for Application to Information Technology in Field Construction (건설 현장의 정보기술 발전 방향에 관한 연구)

  • Kim Sung-Gun;Lee Ung-Kyun;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.207-210
    • /
    • 2005
  • Information Technology (IT) makes a great contribution towards improvement of productivity in construction industry. Because most of researches of construction industry's IT are focused on the whole field of the industry or development of information system, however, these have no regard for conditions in fields. Thus, this study proposes the requirements in order to improve the productivity and efficiency of field execution of construction industry. To achieve this aim, the surveys are conducted of the problems and conditions of IT application on site workers and managers. As a result, the followings are suggested: (1) user training should be exercised continuously, (2) infrastructure of IT constructed, (3) total management system of field execution developed, and (4) the development of IT system focused on fields. Therefore, this study provides meaningful proposal that can be set up basic direction toward IT investment and IT system development.

  • PDF

A Study on the Selection of Construction Method by Decision Making Method (의사결정기법을 통한 건축공법선정에 관한 연구)

  • Yang, Keek-Young;Yoon, Yer-Wan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

The Regional Construction & Management Office Construction Management System Based On The Web (웹을 기반으로 한 지방청 공사현황 정보시스템 구축)

  • 서명배;강의석;김남곤
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.84-89
    • /
    • 2003
  • For running various construction processing information and technological information, it is supplied by Construction CALS/EC systems properly during whole facilities life cycle. So it is urgently necessary to change Regional Construction 8t Management Office (RCMO) equipment construction administration business to electron processing system (CALS/EC). From construction work plan to completion, a present storage documents system is unsystematic. Therefore, it needs management system to store documents and to read in turn documents properly. This research suggest that it is to connect with various information systems and Construction CALS/EC for RCMO which is running public construction field. So it can be driven systematic and effective administration system about public construction business by Web-based present construction situation information system.

  • PDF

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

CONSTRUCTION MANAGEMENT KNOWLEDGE IN PREPARING AND RESOLVING CONSTRUCTION CLAIMS

  • Ting-ya Hsieh
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.681-686
    • /
    • 2005
  • This paper discusses the role of construction management (CM) profession in claims management. It reviews the attitudes, psychology and practices relevant to CM knowledge. It is the purpose of this paper to highlight CM profession's knowledge in this area as this profession's core competence in contemporary construction.

  • PDF

A Study on the Selection of Underground Construction Method by Risk Analysis (리스크 분석을 통한 지하 구조체 공법 선정에 관한 연구)

  • 윤여완;양극영;홍성휘
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.99-117
    • /
    • 2001
  • In the past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of Underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need rely careful process. The purpose of this study is to present the best suitable methodology fer selection of construction method by considering potential risk of construction method and variables together with external condition for Underground construction. The purpose of this study is to select the most suitable construction method by analysing potential conditions(Construction site situation and Client. Request in designing) To do this, We prepared arrangement rule to arrangement conditions for construction method. And then make Checklist the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy Process among Multiple-Criteria Decision Making, the professional opinions is to be adapted. By doing this, It can lead and select the most suitable considering method considering the data which get from risk density test.

  • PDF

Development of the construction specification framework for skyscraper outer wall cleaning robot (외벽청소로봇의 가이드레일 시공기준체계 구축에 관한 연구)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.292-294
    • /
    • 2013
  • When the number of skyscrapers are increased in the domestic, it has increased the need of the outer wall cleaning robot. However, it does not exist the construction specification of the outer wall cleaning robot in the domestic. it is difficult to apply in the domestic that the outer wall cleaning robot. For this reason, it raised the need of the construction specification. And it is urgent that the construction specification of the outer wall cleaning robot is needed to develop in the domestic. Therefore, this study aims to propose the construction specification framework of the outer wall cleaning robot. In the future, this study will be based on the development of the construction specification on the outer wall cleaning robot.

  • PDF