• Title/Summary/Keyword: Construction Formwork

Search Result 206, Processing Time 0.149 seconds

Formwork System Selection Model for Tall Building Construction Using the Adaboost Algorithm

  • Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.523-529
    • /
    • 2011
  • In a tall building construction with reinforced concrete structures, the selection of an appropriate formwork system is a crucial factor for the success of the project. Thus, selecting an appropriate formwork system affects the entire construction duration and cost, as well as subsequent construction activities. However, in practice, the selection of an appropriate formwork system has depended mainly on the intuitive and subjective opinion of working level employees with restricted experience. Therefore, in this study, a formwork system selection model using the Adaboost algorithm is proposed to support the selection of a formwork system that is suitable for the construction site conditions. To validate the applicability of the proposed model, the selection models Adaboost and ANN were both applied to actual case data of tall building construction in Korea. The Adaboost model showed slightly better accuracy than that of the ANN model. The Adaboost model can assist engineers to determine the appropriate formwork system at the inception of future projects.

Importance Analysis of Major Factors in Formwork Collapse Accident (거푸집 붕괴사고 주요 요인별 중요도 분석)

  • Park, Ji-Yeong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.249-256
    • /
    • 2021
  • Fatal accidents in the construction industry account for a higher proportion than other industries, and in particular, the collapse accident of formwork is likely to lead to a serious accident like death. This study aim to derive the importance ranking of formwork collapse factors using AHP technique for preventing fatal accident. The AHP survey was conducted on field construction engineers, construction project managers, safety managers, and formwork specialist foreman with 10 years on site experience. The results of AHP analysis is that the most importance factor of formwork collapse accident is 'non-compliance with the formwork shoring assembly drawing'. Next it is important in the order of 'poor installation of formwork shoring and accessories', 'formwork shoring is not installed vertically', 'non-compliance with the concrete curing period of the formwork shoring', 'safety supervisor not designated and negligent'. It is necessary to preferentially and intensively manage the high importance factors presented as a result of this research for reducing formwork collapse accident. In addition, it will contribute to reducing construction safety accidents if the factors of the formwork collapse accident suggested in this research are included in the formwork inspection check list and checked step by step in formwork construction.

The Development of Automatic Module for Formwork Layout using the BIM

  • Chijoo Lee;Sungil Ham;Ghang Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1266-1271
    • /
    • 2009
  • Formwork layout is perceived as important due to its strong tie to site works. But, most formwork is done manually and influenced by worker's skill and thus, a lot of construction errors occur. The introduction of BIM (Building Information Modeling) enables acquiring more precise information on the building shape, dimension, structure, etc. than 2D-based drawings and thus, the increased productivity, such as reduction of workload and work times, and the economic efficiency, such as reduction of formwork types and form dimensions with the consideration of constructability, are expected. This study reviewed the previous studies and formwork layout systems to derive this study's differentiations and factors to be first considered for formwork planning were derived by analyzing priorities against consideration factors. Last, a flow chart and algorithm were developed to apply the derived factors to the formwork layout module.

  • PDF

The Study on the Risk Assesment of Formwork (거푸집공사 위험성 평가에 관한 연구)

  • 고성석;오준호
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.96-101
    • /
    • 2002
  • The object of risk assesment is to prevent the accident from arising. The main reason for risk assesment of construction work is to determine priority order of improvement plan about risky work. Formwork is a complicated process that determines the total duration of apartment construction, and occupies 10∼15% of total construction expense, and 17% of serious accidents occur during formwork. So, formwork occupies very importment roles in work sites, economical efficiency and safety. We need to identify the work type with a high risk of accidents, and to establish suitable safety counterplan and implement intensive safety management.

The Process for Development of the Optimum Layout Model in Slab Formwork of High-rise Building Construction (초고층 건축공사의 바닥거푸집 최적배치 모델 구축 프로세스 연구)

  • Cha, Minsoo;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.171-172
    • /
    • 2011
  • Formwork accounts for a large proportion of the framework in high-rise construction projects in terms of the duration and cost. Especially, slab formwork has a significant influence on these factors. However, the current selection of formwork method in general contractors depends on the decisions of few experienced engineers, and layout planning of the formwork in specialty contractors requires lots of time by different floor types. As a preliminary study for developing an optimum layout model in slab formwork of high-rise building construction, this study proposes the process of the optimum layout model and determines a fitness function for use of the genetic algorithm aimed at table formwork.

  • PDF

Evaluation of Construction RCB Exterior Wall Formwork according to Placing Height on Nuclear Power Plant

  • Song, Hyo-Min;Sohn, Young-Jin;Shin, Yoonseok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.653-660
    • /
    • 2015
  • Technologies for reducing construction duration are key factors in nuclear power plant construction projects, as a reduction in construction duration at the construction phase leads to a reduction in construction cost and an increase in profits through the early operation of the nuclear power plant. To analyze the constructability of the height of single-layer placement of formwork for the Reactor Containment Building (RCB) exterior wall through lateral pressure according to the height of concrete placement, the deformation criteria for formwork, and a new form design, 'MIDAS GEN (hereinafter referred to as MIDAS)' is used in this study. The cost and workload of formwork are derived according to the unit of height of the RCB exterior wall. Based on the result, it was found that the higher the RCB exterior wall, the higher the material cost, and the less the construction duration and the less the total number of formwork layers. Based on this result, it is believed that the material cost and the construction duration can be appropriately determined according to the formwork height.

Artificial Intelligence Image Segmentation for Extracting Construction Formwork Elements (거푸집 부재 인식을 위한 인공지능 이미지 분할)

  • Ayesha Munira, Chowdhury;Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2022
  • Concrete formwork is a crucial component for any construction project. Artificial intelligence offers great potential to automate formwork design by offering various design options and under different criteria depending on the requirements. This study applied image segmentation in 2D formwork drawings to extract sheathing, strut and pipe support formwork elements. The proposed artificial intelligence model can recognize, classify, and extract formwork elements from 2D CAD drawing image and training and test results confirmed the model performed very well at formwork element recognition with average precision and recall better than 80%. Recognition systems for each formwork element can be implemented later to generate 3D BIM models.

Formwork Productivity Analysis Model for Cost-efficient Equipment Operations

  • Hyunsu Lim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.226-230
    • /
    • 2013
  • In the tall building construction, the slab formwork largely impacts on construction cost. Because productivity of a slab formwork is influenced by a number of and the efficiency of equipment, using the equipment-based construction method, an appropriate equipment input planning is crucial for the productivity. Meanwhile, the general equipment input planning is conducted by intuition based on experience due to the lack of equipment productivity data. Thus, this study develop a simulation model to analyze table formwork productivity and to propose an optimum equipment input plan that reflects the construction process, based on the full consideration of the economic factors. This study developed a simulation model by using CYCLONE and the data for the model was collected by measuring the duration of each unit activity in the tall building where table forms were applied. It is expected that a simulation model helps users to make better decision on the equipment input planning of slab formwork.

  • PDF

DEVELOPMENT AND APPLICATION OF SUBSTRUCTURE NON SUPPORTING FORMWORK FOR TOP-DOWN CONSTRUCTION

  • Mee-Ra Jeong;Hong-Chul Rhim;Doo-Hyun Kang;Kwang-Jun Yoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.788-793
    • /
    • 2009
  • Constructing substructures by using Top-Down or Downward method needs an efficient formwork system because of difficulties in supporting concrete slabs from the bottom while excavation is in process. Existing underground formwork systems can be classified by three types: graded ground supported type (Slab On Grade, Beam On Grade), suspension type (Non Supporting Top Down Method), and bracket supported type (Bracket Supported R/C Downward). Each method has its own advantages and limits. Application of a specific formwork system for a given construction site is determined by various conditions and affect construction time and cost. This paper presents a newly developed underground non-supporting formwork system, which combines the advantages of a suspension type and a bracket supported type while it overcomes limits of two types. The developed system has a moving formwork which is supported by suspension cables hanging from the bracket placed at the top of pre-installed substructure columns. Then, the moving formwork is repeatedly lowered down for the next floor below to support concrete slab during curing. The details of this bracket and cable supported system have been investigated for the improvement of easiness in construction.

  • PDF

An Analysis of Application by Formwork in Concrete Structural Frame Work for Tall Building in Korea (국내 초고층 골조공사의 거푸집벽 적용성 분석)

  • Kim, Tae-Hoon;Jin, Il-Guan;Shin, Yoon-Seok;Cho, Seong-Soo;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.387-391
    • /
    • 2007
  • A proper selection of formwork greatly affects project success in tall building construction. The tall building construction, however, has not been selected properly using the characteristics by formwork and demands the comprehensive consideration of cost, duration, quality, safety, and environment. Therefore, this study compares and analyzes the application by formwork of five aspects. In order to perform an analysis, the questionnaire was performed to research the priority order of management as determining formwork and application by formwork of tall building construction engineers. This study is expected to help reasonable selection of formwork.

  • PDF