• Title/Summary/Keyword: Construction Finance

Search Result 243, Processing Time 0.024 seconds

Factors Affecting Business Performance of Construction Enterprises Listed on Vietnam Stock Markets

  • DANG, Thanh Cuong;TRINH, Thi Hang;BANH, Thi Thao;NGUYEN, Thi Yen
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.9
    • /
    • pp.49-59
    • /
    • 2022
  • Based on assessing the impact of factors on the business efficiency of construction enterprises, the research team proposes policy implications to improve the business performance of listed construction enterprises in Vietnam in the coming time. The study used secondary data collected from the audited financial statements of 25 enterprises listed on Vietnam's stock market in the period 2015-2021 to estimate the factors affecting the business performance of construction enterprises. After collecting, the data will be encrypted and checked. The article uses a quantitative research method by using a linear regression model on Eviews 10 to analyze the data and analyze the impact of factors on the business performance of construction enterprises listed on Vietnam's stock market. The research result shows that firm size and growth rate positively affect business performance while capital structure, receivable management, fixed asset investment, and economic growth have a positive impact on the business performance of construction companies listed on the Vietnamese stock market. Based on this result, the paper also makes recommendations to the Vietnamese construction companies to enhance their business performance.

CONSTRUCTION FINANCING AND INDUSTRY DEVELOPMENT

  • Yat-Hung, Chiang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.962-969
    • /
    • 2009
  • The market of building construction has been competitive in Hong Kong, perhaps as anywhere else in the world. The barrier to entry is low because there are relatively low requirements on the three factors of production - technology, manpower and finance. The prevailing building technology is traditional and labour-intensive. There is also not much need of capital because clients' periodic payments have been the main source of project finance. Further, capitalizing on trade sub-contracting, contractors have been able to keep their direct labour-force small and to transfer much of their business risk to the sub-contractors. Based on interviews to solicit the perception of a sample of building contractors on the particular issues of construction finance, we present the findings in this paper and discuss the various implications. We believe that the current practice of construction financing is both the cause and effect of the competition within, and the competitiveness of, the building construction sector in Hong Kong. We conclude that the building construction sector is "locked or stuck" in this "equilibrium" of traditional technology, reliance on clients' finance and exploitation of sub-contracting. In this "equilibrium" state, there is hardly any motivation for contractors to engage themselves in product or process innovation. Consequently, any talk of industry reform or innovation could only remain just that. We believe that this problem is not unique in Hong Kong. The building construction sector in many other developed and developing economies is posed with similar if not the same problems and constraints. We conclude that there has to be some "external forces" to bring this "equilibrium" state to a higher level "equilibrium" one where higher value-added building construction services are supplied and demanded. This is a state where building contractors possessing innovative technology, better financial and manpower resources could thrive to build better buildings with innovative building methods and processes.

  • PDF

Factors Affecting Application of Cost Management Accounting: Evidence from Small and Medium Enterprises in Vietnam

  • NGUYEN, Co Trong;NGUYEN, Tung Dao;NGO, Hoang Thanh
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.4
    • /
    • pp.185-190
    • /
    • 2022
  • The article analyzes the impact of factors affecting the application of management accounting in Vietnamese small and medium enterprises. It provides more empirical evidence on the factors affecting the application of cost management accounting. The research methodology involved a questionnaire survey of managers at all levels, and chief accountants and accountants of 65 Vietnamese construction enterprises. 220 questionnaires were collected in total, out of which 14 invalid questionnaires were not used due to many blank cells. The 5-level Likert scale is familiarly used in many studies, so the author also quantifies each factor according to five levels. Quantitative research was carried out with SPSS 25 software. Research results show that 4 factors positively influence the application of cost management accounting, including Business strategy, Management cost control, level of accounting staff, and Manager's point of view on cost management accounting. The level of accounting staff factor has the strongest influence on the application. Based on the research results, the author has proposed recommendations to improve the application of cost management accounting techniques of construction enterprises, thereby contributing to enhancing competitiveness and efficiency activities of construction enterprises in Vietnam.

on the Risk Analysis of Project Finance in BTL Project (주거부문(住居部門) BTL사업(事業)에서 프로젝트금용의 위험분석(危險分析)에 관한 연구(硏究))

  • Song, Kyu-Ryol;Jung, Eul-Kyu;Im, Chil-Soon
    • Journal of the Korean housing association
    • /
    • v.17 no.6
    • /
    • pp.83-90
    • /
    • 2006
  • The purpose of this study is to apply efficiently a successful Project Finance in BTL. To use Project Finance, it is necessary to Risk Analysis of each work step. This Risk Analysis have to repeatedly progress in overall Project Process. The differences between Corporate Finance and Project Finance are remarkably appeared in Risk Allocation and Limited Resource. To use successful Project Finance in construction industry, first, raising project confidence, second, technical : economical : lawful evaluation by Finance Expert, third, Income Guarantee for Lender or Consortium of Lending Banks, forth, Leverage Effect of Project Sponsor must be preceded.

Cost Performance Evaluation Framework through Analysis of Unstructured Construction Supervision Documents using Binomial Logistic Regression (비정형 공사감리문서 정보와 이항 로지스틱 회귀분석을 이용한 건축 현장 비용성과 평가 프레임워크 개발)

  • Kim, Chang-Won;Song, Taegeun;Lee, Kiseok;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.121-131
    • /
    • 2024
  • This research explores the potential of leveraging unstructured data from construction supervision documents, which contain detailed inspection insights from independent third-party monitors of building construction processes. With the evolution of analytical methodologies, such unstructured data has been recognized as a valuable source of information, offering diverse insights. The study introduces a framework designed to assess cost performance by applying advanced analytical methods to the unstructured data found in final construction supervision reports. Specifically, key phrases were identified using text mining and social network analysis techniques, and these phrases were then analyzed through binomial logistic regression to assess cost performance. The study found that predictions of cost performance based on unstructured data from supervision documents achieved an accuracy rate of approximately 73%. The findings of this research are anticipated to serve as a foundational resource for analyzing various forms of unstructured data generated within the construction sector in future projects.

Factors Affecting Firm Performance: A Case Study of the Construction and Real Estate Sector in Vietnam

  • HA, Ho Nguyen Phi
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.4
    • /
    • pp.307-314
    • /
    • 2022
  • The construction and real estate industries contribute significantly to each country's economic development. Strong construction and real estate firms will contribute more to the country's GDP by contributing to the industry's development. The purpose of this study is to examine the factors that influence the performance of the construction and real estate sectors in Vietnam. A survey of 200 construction and real estate firms in different areas was conducted from 2020 until the end of 2021. Following the removal of errors, the author got 196 replies, 6 of which were invalid, leaving 190 votes for quantitative analysis. The research findings show that elements such as (1) senior executives' commitment to the organization, and (2) the ability to use technology have a positive and significant impact on firm performance when using advanced econometric analysis. Furthermore, in the case of Hanoi, Vietnam, business relationships have a positive impact on firm performance. Training and development, as well as the working environment and incentives, have little effect on the profitability of construction and real estate firms. Finally, the research also has some recommendations and limitations for the construction and real estate sector.

A Study on Finances and Factors of weighting Cost in Government Constructions in the Late of Chosun Dynasty (조선 후기 관영건축공사(官營建築工事)의 재원과 비용 절감 방안에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.11 no.3 s.31
    • /
    • pp.53-68
    • /
    • 2002
  • Since the 17th century, the finance for the government construction was demanded unlike the early chosun dynasty. It was consequent upon a transition in the supply method of materials and labors for the construction. The government construction being enforced in chronic financial difficulties had to undergo lack of funds. Especially, a rising construction cost by purchasing lots of materials including wood, and by employing labors weighted the difficulties. In order to put forward a construction, new and various efforts besides diversification in sources of finance ad been looked for. The efforts were driven in three parts which were to be the management of labor and materials, and the way of construction execution. As a result of spending a great effort to save cost, an extinguished improvement in the way of construction execution came out with 'Injungjeon-yeongkweon' in the year 1805.

  • PDF

EVALUATION OF MINIMUM REVENUE GUARANTEE(MRG) IN BOT PROJECT FINANCE WITH OPTION PRICING THEORY

  • Jae Bum Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.800-807
    • /
    • 2009
  • The limited public funds available for infrastructure projects have led governments to consider private entities' participation in long-term contracts for finance, construction, and operation of these projects to share risks and rewards between the public and the private. Because these projects have complicated risk evolutions, diverse contractual forms for each project member to hedge risks involved in a project are necessary. In light of this, Build-Operate-Transfer(BOT) model is considered as effective to accomplish Public Private Partnerships(PPPs) with a characteristic of an ownership-reversion. In BOT projects, the government has used such an incentive system as minimum revenue guarantee(MRG) agreement to attract the private's participation. Although this agreement turns out critical in success of BOT project, there still exist problematic issues in a financial feasibility analysis since the traditional capital budgeting theory, Net Present Value(NPV) analysis, has failed to evaluate the contingent characteristic of MRG agreement. The purpose of this research is to develop real option model based on option pricing theory so as to provide a theoretical framework in valuing MRG agreement in BOT projects. To understand the applicability of the model, the model is applied to the example of the BOT toll road project and the results are compared with that by NPV analysis. Finally, we found that the impact of the MRG agreement is significant on the project value. Hence, the real option model can help the government establish better BOT policies and the developer make appropriate bidding strategies.

  • PDF

ESTABLISHMENT OF CDM PROJECT ADDITIONALITY THROUGH ECONOMIC INDICATORS

  • Kai. Li.;Robert Tiong L. K.;Maria Balatbat ;David Carmichael
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.272-275
    • /
    • 2009
  • Carbon finance is the investment in Greenhouse Gas (GHG) emission reduction projects in developing countries and countries with economies in transition within the framework of the Kyoto Protocol's Clean Development Mechanism (CDM) or Joint Implementation (JI) and with creation of financial instruments, i.e., carbon credits, which are tradable in carbon market. The additional revenue generated from carbon credits will increase the bankability of projects by reducing the risks of commercial lending or grant finance. Meantime, it has also demonstrated numerous opportunities for collaborating across sectors, and has served as a catalyst in bringing climate issues to bear in projects relating to rural electrification, renewable energy, energy efficiency, urban infrastructure, waste management, pollution abatement, forestry, and water resource management. Establishing additionality is essential for successful CDM project development. One of the key steps is the investment analysis. As guided by UNFCCC, financial indicators such as IRR, NPV, DSCR etc are most commonly used in both Option II & Option III. However, economic indicator such as Economic Internal Rate of Return(EIRR) are often overlooked in Option III even it might be more suitable for the project. This could be due to the difficulties in economic analysis. Although Asian Development Bank(ADB) has given guidelines in evaluating EIRR, there are still large amount of works have to be carried out in estimating the economic, financial, social and environmental benefits in the host country. This paper will present a case study of a CDM development of a 18 MW hydro power plant with carbon finance option in central Vietnam. The estimation of respective factors in EIRR, such as Willingness to Pay(WTP), shadow price etc, will be addressed with the adjustment to Vietnam local provincial factors. The significance of carbon finance to Vietnam renewable energy development will also be addressed.

  • PDF