• 제목/요약/키워드: Construction Estimation

검색결과 2,083건 처리시간 0.029초

디지털 수량산출에 기반한 건축공사 내역서 구성에 대한 연구 (A Study on Improvement for Organizing Construction Bill of Quantity based on Digital Quantity Take-Off)

  • 송아름;강기수;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.198-199
    • /
    • 2014
  • In construction management the estimation procedure of construction expanses follows a series of submission phases: production of drawings, the assessment report, and the expanse report. In South Korea, it is a widely known issue that the expanse report only includes the net expanses at each construction phase and part, which makes it difficult to trace detailed basis from the records. This issue with inefficient record management should pose a number of problems, which result from discontinuation of construction record, unproductiveness for reproduction of records at each construction and submission phases for construction management, and failure to perform fair management among the contracting parties. Thus, the amendment in which the assessment report and the quantity estimation report reflect common codes to share throughout types of construction, space, and parts should be applied into practices so as to model production of acceptable reports and record.

  • PDF

공동주택 시멘트 액체방수 공사의 현장분석을 통한 작업조 기반 품셈에 관한 연구 (A Study on the Work Crew Based for the Estimation from Construction Analysis of Cement Liquid Waterproofing in Apartment House)

  • 하기주;하민수
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.121-128
    • /
    • 2010
  • 본 연구에서는 건설공사의 합리적인 공사비 산정을 위하여 기존 표준품셈의 문제점을 개선하고, 새로운 적산 모델을 도입한 작업조 기반 표준품셈을 제안하고자 한다. 그리고 공동주택 시멘트 액체방수 공사를 대상으로 건설공사의 적산기술과 시공능력을 향상할 수 있도록 작업조구성과 시공프로세스를 체계화하였다. 또한 공동주택에서 욕실부분 시멘트 액체방수 공사를 대상으로 전용면적 $84{\sim}85m^2$, 전용면적 $125{\sim}184m^2$의 노무량 및 생산성을 분석하고 현행 표준품셈과 작업조 기반 품셈의 특징을 비교 분석하였다. 본 연구를 통하여 공동주택 시멘트 액체방수 공사의 현행 표준품셈과 작업조 기반 품셈을 서로 비교하였을 때, 전용면적 $84{\sim}85m^2$에서는 방수공은 평균 1.91~2.13배, 보통인부는 평균 8.82~9.52배의 차이가 있었다. 그리고 전용면적 $125{\sim}184m^2$에서는 방수공은 평균 1.89~2.07배, 보통인부는 평균 8.57~9.38배의 차이가 나타났다.

생산성 분석을 통한 철근콘크리트공사의 Cost Data Prototype 개발 (Development of Cost Data Prototype in Reinforced Concrete work based on Productivity Analysis)

  • 안수배;지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.135-136
    • /
    • 2011
  • A standard of estimation is used as a basis for estimating the predetermined amount of public construction. However, they raise several points of reasonable labor to be presented to a standard of estimation. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for an accurate way of making such a calculation.This study analyzed the productivity of reinforced concrete work by the CYCLONE model, and the estimated optimal labor through sensitivity analysis, and presented the model on the number of optimal labor through sensitivity analysis.

  • PDF

등가재령에 의한 플라이애시 치환 시멘트 모르타르의 강도증진해석 (Estimation of Compressive strength of the Fly Ash Substitution cement mortar by Equivalent Age)

  • 손호정;정은봉;정상현;안상구;한천구;한민철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.105-107
    • /
    • 2012
  • This study was conducted to investigate the strength development of fly ash concrete using the strength development estimation for the ready mixed concrete for construction of nuclear reactors. The findings are as follows. First, the higher the curing temperature becomes, the shorter the setting time becomes. In addition, the compressive strength also increased as the curing temperature gets higher. The apparent activation energy derived from ASTM C 1074 showed 34.75 KJ/mol. The results of concrete strength estimation confirmed that Gompertz model formula has good accuracy.

  • PDF

VE 대상선정을 위한 평가기준 중요도 산정방법 개선에 관한 연구 (A Study on the Improvement of Estimation Method of an Appraisal Standard to Select of the Subject in VE.)

  • 권병석;이동준;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.291-294
    • /
    • 2001
  • This study has established an appraisal standard to select VE subject when they evaluate of design VE by using of a qualify model in an early design step and has suggested an improvement method for importance's estimation method of an appraisal standard. An importance's estimation method is to arrangement of geometric average method using an AHP method to this study, When an evaluation of a quality model, we estimate an importance by establishing of an appraisal standard of economics, construction, security, environmental influence, maintenance, etc.

  • PDF

그린리모델링 에너지저감 효과 예측 Tool 구축에 관한 기초연구 - 업무시설 대상 - (A Study on the Estimation of Green Remodeling Energy Reduction Tool in Building Construction - Office Building -)

  • 주정훈;이건호;구보경;김기태
    • 대한건축학회논문집:구조계
    • /
    • 제34권8호
    • /
    • pp.13-18
    • /
    • 2018
  • The purpose of this study was to study on the estimation of green remodeling energy reduction tool in building construction. Green Remodeling Decision System that can predict the energy reduction effect in green remodeling is developed as a tool for simple remodeling of green remodeling considering users' convenience, so that it can quickly and comprehensively determine power peak load reduction factor technology. A preliminary simulation result of a short preliminary remodeling evaluation is DB. It will be developed as a tool that can be easily accessed by users such as web and apps.

증점제를 첨가한 매입말뚝 주면고정액의 실험적 연구 (Experimental study of file filling meterial with A thickener)

  • 고혜빈;이한승
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.21-22
    • /
    • 2020
  • In this study, the pile filling materials of the pile in drilled piling was studied. cement milk is mostly used as the filling materials of bored pile. The use of filling material based on cement milk is inefficient at field construction because it needs a lot of the charging mass. thickening agent was added to the cement milk to perform settlement estimation experiment on a circular cylinder, and as a result of examining the compressive strength of the day, it was found that the settlement estimation was significantly reduced. However, the strength was relatively low, it was confirmed that there was no problem with the regulation because the main surface fixative required relatively low strength.

  • PDF

일본의 제도·정책 벤치마킹을 통한 국내 건설 ICT 시공 방안에 관한 연구-토공사를 중심으로 (A Study on the ICT Construction in Korea through Benchmarking Japanese Systems and Policies - Focused on Earthwork)

  • 박수현;김정환;서종원;심호
    • 대한토목학회논문집
    • /
    • 제41권4호
    • /
    • pp.429-439
    • /
    • 2021
  • 고령화로 인한 건설인력 감소에 대응하고 건설현장의 생산성 향상을 위해 일본에서는 2016년부터 정보통신기술을 활용한 자동화시공을 추진하고 있다. 일본 국토교통성은 ICT를 활용한 토공 자동화 시공을 뒷받침 할 새로운 비용 산정기준, 발주제도, 정부지원 정책을 마련하여 시행하고 있고 현장에서 활용할 수 있는 자동화 시공의 종류를 확대하고 있다. 우리나라도 ICT를 건설 현장에 원활하게 적용하기 위해서는 일본에서와 같이 우선적으로 ICT를 활용한 자동화 시공 관련 법과 제도, 정책 등을 정비해야 한다. 본 논문은 일본과 한국의 ICT를 활용한 자동화시공 관련 제도 및 정책을 비교·분석하여 벤치마킹하는 방법으로 연구하고 이로부터 시사점을 찾고자 했다. 연구 결과, 국내 건설현장에서 ICT기술을 활용하기 위해서는 한국 정부가 선도적으로 ICT기술 관련 비용 산정기준, 발주체계, 경제지원 정책 등을 마련해야 한다는 결론에 이르게 되었다.

건설폐기물 자원순환체계 구축을 위한 발생원단위 적용에 관한 연구 (The Investigation on Application of Construction Waste Unit to Establish Resource Recycling System through Case Study)

  • 손병훈;홍원화
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.181-186
    • /
    • 2010
  • Research on construction waste unit was in progress in the 1995 when 'Proper Disposal and Recycling Measures for Construction Waste' was made by the Seoul Development Institute. Such an effort has been made in order to cope with the lack of natural resources in Korea and to utilize the reusable resources. Furthermore, these efforts have also increased due to the improved standing of Korea in the international community. A large number of residential buildings were built in the response to the government's policy by increasing the supply of houses between the 1970's and 1980's. In 2000, more reconstruction and redevelopment was done because of the aged buildings and change of use for those buildings. And the project has been actively promoted until now, which caused a sharp increase in the generation volume of construction waste. In Korea, 8 kinds of construction waste unit, including the standard construction manpower and materials estimation, are introduced. Currently, they provide standards to different building categories and waste properties while for construction sites different standards are applied. This study aims to measure the actual amount of construction waste after sample buildings are dismantled and analyzes the estimation of the waste quantity by using various standard units. Through comparison, this study will figure out the differences among the standard units in order to find out how to apply the standard units properly. Moreover, this research will provide practical measures to apply such units to construction sites.

실적공사비 적산제도 표준화를 위한 예정가격 산정 -학교공사를 중심으로- (The Predetermined Amount Estimation for the Standardization of Construction Cost Estimating System Focusing on the School Work)

  • 박금순;정성관;박경훈;유주한
    • Current Research on Agriculture and Life Sciences
    • /
    • 제26권
    • /
    • pp.31-43
    • /
    • 2008
  • Introduction of construction cost estimating system is necessary to promote appropriate reflection of construction cost and simplified and efficient amount work. The results of this study are as follows. In the results of considering the basic concept and composition of a construction type estimating system, an example orders are concentrated on an apartment house in the country. The building appurtenant work of extension work is high(1.52) as compared with others. In regression analysis for a construction cost, the models are as follows. In a new construction work, (construction cost)=$12,004.8+4.09{\times}$(building area), and in extension work, (construction cost)=$-121.9+4.50{\times}$(building area). Accordingly, this study wishes to compare and analyzes main contents of original cost method and results cost method, and propose predetermined amount estimation device through existent literature study investigation for accumulation of the construction cost.

  • PDF