• Title/Summary/Keyword: Construction Enterprise

Search Result 307, Processing Time 0.027 seconds

DEVELOPMENT OF ERP INTEGRATION SYSTEM FOR SPORTS INDUSTRY IN TAIWAN

  • Yan-Chyuan Shiau;Yu-Min Hsu;Shu-Jen Sung;Chih-Kun Chu;Hsiang-Lun Cheng;Tsung-Pin Tsai
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1028-1035
    • /
    • 2005
  • Traditional Industries were planning the major role for Taiwan's economy. However, we need to face the competition from developing countries. Moving manufacturing department to other low salary countries, such as China, can only temporarily release some limited pressure. The final and complete solutions are to equip on R&D, refine techniques, improve management capabilities, upgrade business, and reform physique. Currently there are some ERP systems on the market; however, they are designed for common purpose and difficult to introduce into industry. The expensive price is another factor to make them be popular. In this research we will Object Oriented, Visual Modeling, ER Model and Windows Environment to develop an Integrated Management System for Sports Requisites Industries (IMSSRI). We will integrate all information from all departments such as development, business, material administration, manufacture, shipping, and financial. When development people construct the all modules, components, cutting molds, materials and accessories, IMSSRI will calculate all needed materials and cost for each product. This cost will be used for quotation to report to our customers. When customers confirm the order, system will transfer all necessary materials into Material Administration System. IMSSRI can generate manufacturing forms and material raw lists for manufacture department. All related information such as stocking, returning goods, material requesting, and material returning can be integrated so we can control all details of the whole enterprise. Through the help of this system, we hope we can save man-power, reduce human mistakes, raise management capabilities for tradition manufacturing industries and create another possibility of eternal operating for Taiwan's Industries.

  • PDF

Developing Strategies of Construction Firms through u-City Construction Project Scenarios (u-City 건설사업 시나리오에 따른 건설기업의 대응전략 수립에 관한 연구)

  • Kwon, Yong-Ho;Ha, Hee-Yoon;Yoo, Byeong-Gi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.146-154
    • /
    • 2007
  • The u-City construction project has become a hot topic In the construction market because it seems economic value-added field for construction firms. However, construction firms don't willingly participate in the u-City construction market because the future business environments for the u-City are very uncertain. Scenario planning is a very powerful method in managing this complex planning situation and is based on scenarios that help each enterprise appropriately adapt itself to its own business environments. Therefore it Is based on the main principles of systems thinking and multiple futures. For the purpose of dealing with such uncertainties, this paper attempts to develop the possible market scenarios of the u-City construction market through a scenario planning approach. From this perspective, we considered various aspects of the u-City construction such as market demands, technology development, policy level and management environment. After considering the relevant issues, we identified the main trends and key uncertainties. Then, we developed three coherent u-City construction market scenarios. On the basis of the proposed scenarios, the business strategies of potential construction firms in the u-City construction market has been formulated. Therefore, construction firms can use these scenarios as a basic data for market analysis and business strategy. Therefore, this paper is able to enhance the participation of construction firms in the u-City construction market.

Analysis of Construction Policy System for Quality Assurance of Construction Used Steels (건설용 강재의 품질확보를 위한 건설제도 분석 연구)

  • Yoon, Jongsik;Yu, Ilhan;Kim, Kyungrai;Jung, Daewoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.3-13
    • /
    • 2019
  • Recently, quality problems of steel used for construction have been raised as a cause of building collapse and safety accidents. Accordingly, it becomes more important to secure quality through material management, procurement management, and construction management for construction used steels. However, the quality management for construction used steels is confined to technical production and process control. So, it does not provide a solution of various non-conforming steel products issues. Therefore, this study suggests improvements of the construction system to secure quality of the construction used steels. Through expert interviews, we identify the items for system improvement and derive the top priority items by considering utility through a structured Analytic Hierarchy Process (AHP). It also divided the respondents into enterprise and research groups to analyze differences, implications and future improvement issues and suggest a road map. It is expected that the priority items derived in this study could be useful as a basic data for making policy decisions to assure the quality of construction used steel.

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

Effective Management of Construction Information Using a XML Based Project Deliverable Management System (XML 데이터베이스를 활용한 성과물 관리 프로세스의 효과)

  • Moon, Sungwoo;Yang, Byungsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.481-489
    • /
    • 2006
  • These days construction management is executed in an information technology environment, which creates a large volume of digital data. At the completion of a project, the contractor is required to transfer to the owner the digital data as project deliverables usually in a form of CD's. From an enterprise-wide view point, this traditional way makes the management of project deliverables ineffective as the data accumulated from different projects could be enormous. The objective of this paper is to propose a structured way to utilize a XML database for better management of project deliverables. The XML database provides an environment which users can access through a project deliverable management system (PDMS). A pilot of the PDMS has been developed to test the effectiveness of document control. The result of the test demonstrates that the effectiveness of project deliverable management can be increased by providing a high transportability and usability of data in the construction life cycle.

Construction of Kobe′s World Cup Venue and the Development of an Urban Resort

  • Tanaka, Mitsru;Hayashi, Mayumi
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.230-236
    • /
    • 2001
  • The usual definition of and urban resort was a place vastly different from places of daily life such as a theme park or other tourist destination. At the same time, revival of the combination of usual and unusual spaces, in a way like the mixed "Hare"(Special occasion of public event) and "Ke"(Daily life) spaces of communities of old Japan, is part of the idea of urban resorts. And they are places, which start by making a comfortable urban environment for citizens, providing a daily life full of culture and promoting a city′s identity to visitors. if we think about the kinds of structural elements of urban resorts, the usual elements include community, local culture and industry, while the unusual elements include symbols, festivities and interaction. Kobe Wing Stadium is a venue for the 2002 FIFA World Cup hosted by Korea and Japan. The city will build the stadium, but after construction management will be given over to private enterprise, hoping to utilize that sector′s business know how. A competition was held to determine the private executor who would be entrusted with the planning, design, construction and management of the project, considering the conditions of the area, the stadium′s relationship to it and local revitalization. The competition was won by a private enterprise (Kobe Steel Obayashi Group). The them of "Creation of a Sports Community Park" grapples with the large issue of the facility′s relationship with the community. American geographer Yi-fu Tuan coined the word "topophilia" to indicate love of a place. No other word could better describe the desired urban resort nature of the stadium. From this historical perspective it seems that stadiums have great potential as urban resorts. The factor that will determine their success is the attitude of citizens toward them, in short whether they develop topophilia for them or not. We examined the urban resort nature of Kobe Wing Stadium. Regarding daily life, we saw the attempts to revive the local community, the possibility of deepening the local culture and the weakened state of local industry. As a place that is for more than daily life, we saw the certainty of the stadium′s symbolism, its potential as a place for festivities and the test it will face as a space for interaction. Even though several issues are left for future resolution, evaluating Kobe Wing Stadium through these elements of an urban resort, it is clearly founded in the daily life of the community while providing a venue for "Hare"occasions. Fulfilling the roles of an urban resort, it provides many opportunities for local residents to enjoy their and gives visitors a reason to come repeatedly.

  • PDF

Predicting Default of Construction Companies Using Bayesian Probabilistic Approach (베이지안 확률적 접근법을 이용한 건설업체 부도 예측에 관한 연구)

  • Hong, Sungmoon;Hwang, Jaeyeon;Kwon, Taewhan;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.13-21
    • /
    • 2016
  • Insolvency of construction companies that play the role of main contractors can lead to clients' losses due to non-fulfillment of construction contracts, and it can have negative effects on the financial soundness of construction companies and suppliers. The construction industry has the cash flow financial characteristic of receiving a project and getting payment based on the progress of the construction. As such, insolvency during project progress can lead to financial losses, which is why the prediction of construction companies is so important. The prediction of insolvency of Korean construction companies are often made through the KMV model from the KMV (Kealhofer McQuown and Vasicek) Company developed in the U.S. during the early 90s, but this model is insufficient in predicting construction companies because it was developed based on credit risk assessment of general companies and banks. In addition, the predictive performance of KMV value's insolvency probability is continuously being questioned due to lack of number of analyzed companies and data. Therefore, in order to resolve such issues, the Bayesian Probabilistic Approach is to be combined with the existing insolvency predictive probability model. This is because if the Prior Probability of Bayesian statistics can be appropriately predicted, reliable Posterior Probability can be predicted through ensured conditionality on the evidence despite the lack of data. Thus, this study is to measure the Expected Default Frequency (EDF) by utilizing the Bayesian Probabilistic Approach with the existing insolvency predictive probability model and predict the accuracy by comparing the result with the EDF of the existing model.

A Study of the Situation in the Feasibility Analysis for Public Rental Housing (공공임대주택 개발사업의 사업성분석 현황 연구)

  • Lee Sang-Gon;Lee Jae-Young;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.222-225
    • /
    • 2003
  • The development project of a public rental housing require the accurate and systemical feasibility analysis for the successful performance owing to the long project duration. But, the item and procedure of the existing feasibility analysis are not standardized and the correlation among each of items is not clear. Therefore, analysis has much difficulty. The purpose of this study is to present the basic data for the modeling of the feasibility analysis system, through the domestic public enterprise-oriented survey and interview and collection of the report about the feasibility analysis.

  • PDF

A Consideration of the Application of RFID on the Ubiquitous Construction;In View of Establishment (유비쿼터스 건설에의 RFID 활용에 대한 고찰;창업관점에서)

  • Shin, Ho-Sang;Hwang, Chan-Kou
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.1 no.1
    • /
    • pp.91-104
    • /
    • 2006
  • Telematics is spotlighted as the future industry and anticipated the rapid growth. But it is not showing the expected development because of technical and economical blocks. So that there would happen a setback in setting the u-Transportation strategy which is the advanced national transportation system by the year 2020. In this paper, the stat of arts about related technology are introduced, which could give a solution in the technical and economical demerits and design the revitalization in ITS based on Telematics. And also the present application condition in RFID (Radio Frequency Identification) which would be the Blue Ocean in the Ubiquitous construction industry is researched and the commercialization scheme is studied.

  • PDF

The railway line planning pass through the center of Seoul in the railway line of Incheon International Airport Railway (인천국제공항철도 노선에서 서울도심통과 구간의 노선 선형계획)

  • Shin Tae-Gyun;Kim In-Yong;Jung Chan-Mun;Kim Yong-Man
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1138-1143
    • /
    • 2004
  • We as a civil investment enterprise have been constructing In-cheon International Airport Railway which is a transportation means to approach In-cheon International Airport. In this alignment. a section between the Seoul station and Ka-joa follows the existing Yong-san line at the center of Seoul city and traverses Seoul subway 2,5,6 lines. So we planned that the alignment would have the shallowest depth to lie under Kyung-eui line and above the airport railroad. The alignment is planned to construct an open-box structure only 3.6m apart from the subway line 5 tunnel structure and construct the open-box structure 0.7m apart from the subway line 2 box structure. In the line planning, we investigated both the security of the existing subway structures during and after construction and the stability and workability between newly structured tunnel structures with three dimensions numerical analysis methods. Also we raised the reliability of design verification which was achieved by specialty society's review on the planned construction method.

  • PDF