• Title/Summary/Keyword: Construction Enterprise

Search Result 307, Processing Time 0.026 seconds

A Study on Mountain Eco-Village Revitalization through Social Economic Promotion (사회적 경제 지원을 통한 산촌생태마을 활성화 방안에 관한 연구)

  • Kim, Seong-Hak;Seo, Jeong-Weon
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.3
    • /
    • pp.21-31
    • /
    • 2014
  • The purpose of this study is to develop promotion strategies for revitalizing mountain eco-villages through social economic support. In order to fulfill this purpose, this study analyzed operation conditions, income creation structures of 240 mountain eco-villages formed by Korea Forest Service, and reviewed systems for social economic support. As summarized in research outputs, this study confirmed that the activities of organizations for joint projects had not been properly implemented due to the absence of supporting systems following the construction of mountain eco-villages. In addition, 159 villages formed as experience villages could not be qualified for enterprise systems due to aging population and absence of network systems. As for income creation, as indicated by comparing net incomes for joint projects calculated based on the classification of village management evaluation, the average net income of 51 highly-rated villages was 22 million Won and that of 128 moderately-rated villages was 3.5 million Won. Experience-based projects and the sales of processed forestry products made by young adult associations or women's societies were major sources of income, and the absence of inner economic bases or villages' jobs caused young adults and returned farmers to focus on working for outside economic activities. Finally, this study developed strategies for mountain eco-village's social economic promotion and suggested four stages of social economic revitalization provisions.

Using an Evaluative Criteria Software of Optimal Solutions for Enterprise Products' Sale

  • Liao, Shih Chung;Lin, Bing Yi
    • Journal of Distribution Science
    • /
    • v.13 no.4
    • /
    • pp.9-19
    • /
    • 2015
  • Purpose - This study focuses on the use of evaluative criteria software for imprecise market information, and product mapping relationships between design parameters and customer requirements. Research design, data, and methodology - This study involved using the product predicted value method, synthesizing design alternatives through a morphological analysis and plan, realizing the synthesis in multi-criteria decision-making (MCDM), and using its searching software capacity to obtain optimal solutions. Results - The establishment of product designs conforms to the customer demand, and promotes the optimization of several designs. In this study, the construction level analytic method and the simple multi attribute comment, or the quantity analytic method are used. Conclusions - This study provides a solution for enterprise products' multi-goals decision-making, because the product design lacks determinism, complexity, risk, conflict, and so on. In addition, the changeable factor renders the entire decision-making process more difficult. It uses Fuzzy deduction and the correlation technology for appraising the feasible method and multi-goals decision-making, to solve situations of the products' multi-goals and limited resources, and assigns resources for the best product design.

A Study on the Data Mining Preprocessing Tool For Efficient Database Marketing (효율적인 데이터베이스 마케팅을 위한 데이터마이닝 전처리도구에 관한 연구)

  • Lee, Jun-Seok
    • Journal of Digital Convergence
    • /
    • v.12 no.11
    • /
    • pp.257-264
    • /
    • 2014
  • This paper is to construction of the data mining preprocessing tool for efficient database marketing. We compare and evaluate the often used data mining tools based on the access method to local and remote databases, and on the exchange of information resources between different computers. The evaluated preprocessing of data mining tools are Answer Tree, Climentine, Enterprise Miner, Kensington, and Weka. We propose a design principle for an efficient system for data preprocessing for data mining on the distributed networks. This system is based on Java technology including EJB(Enterprise Java Beans) and XML(eXtensible Markup Language).

A Study on SCM System Construction Strategy Using a Statistical Method (통계기법을 이용한 SCM 시스템 구축 전략에 관한 연구)

  • 서장훈;김용범;김우열
    • Journal of the military operations research society of Korea
    • /
    • v.28 no.1
    • /
    • pp.17-28
    • /
    • 2002
  • Recently, To define an enterprise's survival strategy is a difficult task, because the competition of a business is a complexity. The reason is the original research uses a statistical survey method. On a conceptual point of SCM, - as an order of development, physical distribution, logistics management, basic supply chain management and advanced supply chain management etc - a supervisor is magnifying gradually as well as confusing with information and analysis techniques which seems possible. On executing this, however, it has many problems since it is hard and wide; therefore, The Manager don't aware a total executable solution even though the enterprise knows necessity of SCM. On this paper focus on a proposal of alternatives with reasonableness of manufacturing and making a profit of sales department like most of enterprises are willing to overcome such as carelessness and unready strategy of investment additionally, the thesis should effort to find an element through an analysis of cases, a statistical method of effective SCM, and actual survey to propose an alternative; moreover, this paper proved the facts that it could be a guiding company, which has an ability of cooperation with entities through the founding of supply chain. As a conclusion, this essay showed the variation that influences the capacity entities and alternative to define an element which basically influence for a cause and effect.

Construction Project Performance Management Using BSC and Data Warehouse (BSC를 활용한 Data Warehouse 기반의 건설 프로젝트 성과관리)

  • Park, Moon-Seo;Kim, Nam-Ho;Lee, Hyun-Soo;Ahn, Chang-Bum;Lee, Kyu-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.14-25
    • /
    • 2009
  • Many companies have managed their business performance in order to achieve their enterprise purpose. Performance management which applied concept of BSC (Balanced Scorecard) is widely used all over the world. In the construction industry, BSC-based performance management is currently introduced with needs of balanced performance evaluation. However, most companies actually have intermediate level of adapting BSC. It is important to understand its process or and structure. Therefore, this paper is focused on making performance management process and defining each phase of it. In addition, the model and system are established with putting them together. With developing performance process in construction, the construction companies are supposed to detect the deficiencies of the current performance management systems and take some opportunity to be helped for supporting their decision-making. In conclusion, this paper will provide the construction industry with the opportunities to enhance the values of performance management system and construction application.

The Improvement Plan of Quality and Organization Management through the Survey of Actual Condition in Construction Work (건설공사 실태분석을 통한 품질 및 조직관리 개선방안)

  • Choi, Byung-Ju;Choi, Seok-Woo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.213-218
    • /
    • 2007
  • Domestic by opening of world construction market with recent FTA should be achieved systematic action that of exoteric surrounding construction environment to inculcate this because consciousness structure unpreparedness of legation fields about quality is expose for hindrance factor for QI in construction spot by quality and organization management official important thing for building company's QI because conquest is possible through QI of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of change and good quality rapidly, organization's CEO determination must become side improvement the formation government official enemy, and when inspect by each process, responsible persons participate cooperation enterprise space-time. To improve this because complete charge department for quality control appears that organization management need complete charge department being expose by greatly unprepared misgovernment in heavy hydrogen building company, expense that CEO under direct control histiocyte modeling air with AHP analysis is economical will be cost, but is construed can bring excellent effect in operation management side of quality and organization such as cost-cutting effect in maintenance side and I should do so that can occupy competitive power high position with tissue at active quality complete charge deputy.

  • PDF

A Development of the Customer based On-premise ERP Implementation Process Framework

  • Oh, Deok-Soo;Kim, Hyeong-Soo;Kim, Seung-Hee
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.257-278
    • /
    • 2021
  • As the definition of the vendor-oriented implementation method, which was utilized in adopting an ERP system, has been centered around the project construction business, it was difficult for the EPR adopting organization to systematically prepare ERP projects and have enough deliberative opportunities to change-related policies. Furthermore, this method does not have a fully standardized construction process. Accordingly, by defining an organization that wants to adopt an ERP system as a customer, this paper develops the customer-based ERP construction process framework that assists both customers and developers who construct the system. For this purpose, this paper reviews the previous research and collects the construction processes of the commercial ERP SW vendor and ERP construction cases while proposing the three-layer process framework to construct ERP through the KJ method. The ERP process framework consists of 7 processes, 32 activities, 141 tasks while providing definitions for concepts of each component. Furthermore, the proposed processes and phases were set in order of the recommended execution, while the activities were suggested as an open-ended type so that the application and usability can be increased and polished by reflecting experts' opinions. The contribution of this study is to standardize the ERP project process by transforming the previous supplier-based ERP construction method into the customer-based one while providing important procedure and activity frameworks that apply to diverse ERP solutions per vendor. At the same time, this study provides an theoretical foundation to develop the construction process for the customer -based Cloud ERP. In practice, At the beginning of the ERP system construction project, it provides communication or process tailoring tools for the stakeholder.

Implementation of Customer Relationship Management in Construction (건설에서의 고객관계관리(CRM)의 적용방안에 관한 연구)

  • Park Sang-Hyuk;Chin Sang-Yoon;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.82-90
    • /
    • 2003
  • An enterprise has evolved to meet social changes and customers' requirements. The construction industry has also evolved according to the changes and requirements, therefore it comes to manage the relationships with customers. However, the customer management in the construction industry has not been quite genuine, since it has been mainly oriented for public relations and advertisements of companies. The genuine customer management should not only systemize customer data but also provide strategy to utilize it through managing relationships with customers as well as customers themselves. In order to apply customer relationship management (CRM), which is a more aggressive and structured business strategy, this paper tries to redefine customers in the construction industry; identifies differences from the existing CRM business strategy; and suggests a desired CRM business strategy and it roles in the construction industry.

Establishment Construction Enterprise Resource Planning(ERP) & Construction Information Sttategy (건설정보화 전략과 ERP구축)

  • Lee Min-Nam;Oh Dong-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.164-170
    • /
    • 2003
  • This paper is to evaluate the informational direction, current situations and ERP establishment concerning constructing industry, to present the right directions, implemented cases for implementing constructional ERP, also to suggest the effect, influence, problems and shootings in constructional ERP arena. The constructing industries in korea are facing great turning point because of the huge corruptions currently happened and forcing to open the market in 1997. Attempting to establish Computer Integrated construction system (ERP) by breaking down constructing cost, improving quality, operating rapid and effective construction to enhance productivity, it is hard to achieve the goal with only inter-contractor's establishment. Constructing industries are integrated ones, consisted of many organizations for instance ordering agencies, contractors, subcontractors, material vendors, etc. and use various information formats such as texts, graphics, drawings. I dare suggest that implementation of constructional CALS including EDI/EC, GIS is tile only solution to control the information systematically generated in whole stages from planing, designing, constructing through maintenance, and to supply or switch the information.

  • PDF

Study on the Field Construction of Semi-Integral Bridge with PSC Girder Integrating End-Diaphragm (단부격벽 일체형 PSC거더를 갖는 반일체식 교량의 시공성 연구)

  • Park, Jong-Myen;Kim, Jin-Bae;Jun, Sung-Yong;Kim, Chung-Sik;You, Sung-Kun;Park, Joong-Bai;Lim, Jung-Hoon
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.5 no.2
    • /
    • pp.21-26
    • /
    • 2014
  • This paper introduces general concepts of jointless bridges and field construction case of semi-integral bridge with psc girder integrating end-diaphragm. The expansion joints need to satisfy thermal and safety conditions of bridges. General bridges with joints have some problems, which are frequently replacement cycle time from mechanical damage or unstable movement, maintenance cost and more. To solve these problems, Integral Abutment Bridges(IAB) have been applied overseas in the 1930s. In Korea, first IAB was constructed in the early 2000s and precast IAB systems was invented and applied lately. Kyungshin overpass bridge in Incheon is the Semi-IAB constructed, the span length is 2@35=70m and the width is 13.9m. The original plan was to use general joint bridge but design field changed with expectations for advanced economic estimation and maintenance. This changed method of B.I.B bridge construction provided not only workability, construction cost but also safety improvement at the same time.