A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

Document Flow for the Research Reactor Project in ANSIM Document Control System (ANSIM 문서관리시스템에서 연구로사업 문서흐름)

  • Park, Kook-Nam;Kim, Kwon-Ho;Kim, Jun-Yeon;Wu, Sang-Ik;Oh, Soo-Youl
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.18-24
    • /
    • 2013
  • A document control system (DCS), ANSIM (KAERI Advanced Nuclear Safety Information Management) was designed for the purpose of documents preparation, review, and approvement for JRTR (Jordan Research and Training Reactor) project. The ANSIM system consists of a document management, document container, project management, organization management, and EPC (Engineering, Procurement and Construction) document folder. The document container folder run after specific contents, a revision history of the design documents and drawings are issued in KAERI. The EPC document work-scope is a registry for incoming documents in ANSIM, the assignment of a manager or charger, document review, preparing and outgoing PM memorandum as attached the reviewed paper. On the other hand, KAERI is aiming another extra network server for the NRR (New Research Reactor) by the end of this year. In conclusion, it is the first, computation system of DCS that provides document form, document number, and approval line. Second, ANSIM increases the productivity of performance that can be recognized the document work-flow of oneself and all participants. Finally, a plenty of experience and knowledge of nuclear technology can be transmitted to next generation for the design, manufacturing, testing, installation, and commissioning. Though this, ANSIM is expected to allow the export of a knowledge and information system as well as a research reactor.

Nexus based Quality Inspection Support Model for Defect Prevention of Architectural Finishing Works (하자예방정보 넥서스 기반 건축마감공사 품질점검 지원 모델)

  • Lee, Hye-Rin;Cho, Dong-Hyun;Park, Sang-Hun;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.59-67
    • /
    • 2017
  • At the completion of the construction, various finishing processes are concentrated. This imposes a burden on the on-site manager and imposes on experience based quality control, thereby causing deviations in the quality of construction depending on supervisor or worker's individual competence. In addition, the information related to quality control is frequently scattered in various types of documents such as specifications and drawings, and checkpoints are frequently omitted. It is necessary to provide a tool that can effectively provide the practitioner before or during the inspection work by systematically storing the information related to the defect prevention and linking them in a mutually referential state. This paper proposes an quality inspection support model that can systematically store necessary information on activity or room basis for the quality check of the apartment house finishing work. Establish a defect prevention information base and a information nexus by linking specifications, design standards, checklists, regulations, defect cases, and drawings to the finishing process and the rooms. Based on this, information registration and search interface are presented. It can contribute to securing a certain level of construction quality or more by suggesting a frame that can be utilized by linking various defects prevention information with the focus on closing activity and room.

A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

Comparison of the quantity estimations from the design phase and the settlement quantities of construction field to improve the extra rates of bar splice (철근 이음조정률의 개선을 위한 설계견적 수량과 현장시공 정산 수량의 비교분석 연구)

  • Kim, Sang-Yeon;Choi, Bo-Mi
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.257-266
    • /
    • 2017
  • LH has been using ultra high strength reinforcing bars (SD500 and SD600), since 2011. Such a change requires an adjustment of the old extra rates of bar splice to reflect use of ultra high strength reinforcing bars, as these rates had been set based on SD400 bars. It is particularly difficult to calculate precisely rebar lap-splice locations for large areas, such as those in apartment buildings. This research aims to adjust the extra rates of bar splice to reflect a reasonable rate; the rebar lap-splice length is not an exact estimation, but instead, an extra rates of bar splice is set and the rebar lap-splice length is increased by 2% (D 10) - 7% (025) depending on the bar size. The subjects of this study are LH apartments undergoing frame construction. We studied the quantity estimations from the design drawings, and analyzed the settlement quantities of construction field. The results of the study revealed that, when each of the quantities are analyzed, consider adjusting the extra rates of bar splice of some rebar to 1% - 3.5%. This was caused by an overuse of reinforcing bars in onsite construction and the use of supporting bars that have not been reflected in the documents, among other reasons. Based on the results of our study, an improvement plan for the current extra rates of bar splice seems to be necessary, cutting or raising the rate depending on the analysis of the data. Through this study, we expect to contribute to the calculation of reasonable construction costs, improvements in the quality of rebar work, and improvements in the capacity of design techniques for apartment buildings.

A Study on Object Recognition Technique based on Artificial Intelligence (인공지능 기반 객체인식 기법에 관한 연구)

  • Yang Hwan Seok
    • Convergence Security Journal
    • /
    • v.22 no.5
    • /
    • pp.3-9
    • /
    • 2022
  • Recently, in order to build a cyber physical system(CPS) that is a technology related to the 4th industry, the construction of the virtual control system for physical model and control circuit simulation is increasingly required in various industries. It takes a lot of time and money to convert documents that are not electronically documented through direct input. For this, it is very important to digitize a large number of drawings that have already been printed through object recognition using artificial intelligence. In this paper, in order to accurately recognize objects in drawings and to utilize them in various applications, a recognition technique using artificial intelligence by analyzing the characteristics of objects in drawing was proposed. In order to improve the performance of object recognition, each object was recognized and then an intermediate file storing the information was created. And the recognition rate of the next recognition target was improved by deleting the recognition result from the drawing. In addition, the recognition result was stored as a standardized format document so that it could be utilized in various fields of the control system. The excellent performance of the technique proposed in this paper was confirmed through the experiments.

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF

Development of AAB (Algorithm-Aided BIM) Based 3D Design Bases Management System in Nuclear Power Plant (Algorithm-Aided BIM 기반 원전 3차원 설계기준 관리시스템 개발)

  • Shin, Jaeseop
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.28-36
    • /
    • 2019
  • The APR1400 (Advanced Power Reactor 1400MW) nuclear power plant is a large-scale national infrastructure facility with a total project cost of 8.6 trillion won and a project period of 10 years or more. The total project area is about 2.17 million square meters and consists of more than 20 buildings and structures. And the total number of drawings required for construction is about 65,000. In order to design such a large facility, it is important to establish a design standard that reflects the design intent and can increase conformity between documents (drawings). To this end, a design bases document (DBD) reflecting the design bases that extracted in regulatory requirements (e.g. 10CFR50, Korean Law, etc.) is created. However, although the design bases are important concepts that are a big framework for the whole design of the nuclear power plant, they are managed in 2-dimensional by the experts in each field fragmentarily. Therefore, in order to improve the usability of building information, we developed BIM(Building Information Model) based 3-dimensional design bases management system. For this purpose, the concept of design bases information layer (DBIL) was introduced. Through the simulation of developed system, design bases attribute and element data extraction for each DBIL was confirmed, and walls, floors, doors, and penetrations with DBIL were successfully extracted.

Improving Constructability Analysis Tasks by Applying BIM Technology (시공성 분석업무 개선을 위한 BIM 기술의 적용방안)

  • Park, Chan-Sik;Park, Hee-Teak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.

The Collective Types of Architecture in Temple Gowoon (고운사(孤雲寺) 건축(建築)의 집합유형(集合類型) 연구(硏究))

  • Kim, Bong-Ryol
    • Journal of architectural history
    • /
    • v.3 no.2 s.6
    • /
    • pp.9-28
    • /
    • 1994
  • A collective theory is tried in analysis on the architectural history of Temple Gowoon in Gyongbook Province. For this purpose, firstly, the chronicle of construction was composed based on the critical study of the old documents. Secondly, the drawings of existing facilities were made after the field survey. And lastly, the collective theory was be able to extracted from the relation between chronicle and physical composion of the Temple Gowoon. The whole temple is composed of two territories, northern one and southern, which are divided by the central ravine. Northern territory was enlarged from Gukrakgeon's cluster through Myongboogeon's to Yeonsoogeon's. On the other hand, southern territory was reduced its position and its size from Daewoongeon's cluster, which was one of the main cluster, to Monigeon's, sub one. These processes were the results of the architectural adjustment, that is say, the dogmatic principles adapted in the topographical environments. The collective forms of clusters are different from each other. Gukrakgeon's cluster is composed of four buildings which enclose the empty inner court. Monigeon's is similar to the small temple type, Myongboogeon's selects the straggling form, and Yoensoogeon's has the type of Confucian shrine. The various types of clusters were the physical settings to symbolize the religious heirarchy of their buildigs. In the front of temple area, Gawoonloo, which located on the ravine and has a big volume, integrates straggling clusters.

  • PDF