Development of XML-based Document Model and Its Applications for Integrated Management of Bridge Design Documents (교량설계문서의 통합관리를 위한 XML 기반의 문서모델 개발과 응용)

  • 이상호;김붕근;정동균;강형택
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.10a
    • /
    • pp.179-184
    • /
    • 2004
  • This paper presents a prototype of document schema to guarantee the consistency of the bridge design information during the life-cycle of bridge. The main component of document schema for bridge design information is derived from the Document Type Definition (DTD) Pool which is the Construction CALS/EC standard in Korea and the document schema is implemented by using the XML Schema. The ifcXML are adopted for representing product data of bridge. A pilot system adopting the document schema and its application to existing bridge show that the suggested document schema can be efficiently used to develop software modules supporting the integrated design documents for bridges.

  • PDF

A study on Safety Keywords that Construction Project Managers Should Know (건설사업관리기술자가 알아야 할 안전키워드에 관한 연구)

  • Kim, Sang-Won;Choi, Yu-Jin;Hong, Seong-Wook;Ahn, Tae-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.95-96
    • /
    • 2017
  • A total of eleven keywords for construction project management engineers to know about safety are as follows. Before the construction, there are two keywords as the safety organization plan and safety management plan, safety compliance, document beach, safety check, safety management fee, hazardous risk prevention plan, safety education, safety accident, seven keywords, There are two keywords of safety inspection comprehensive report, safety management document. It is necessary to understand the keywords well in accordance with the relevant time and to do the best in safety work, and it should be recognized that safety inspection is carried out every month and the safety work should be done faithfully.

  • PDF

A Study on the Maintenance and Management of Geochanghyanggyo Local Confucian School during the Latter part of Joseon Dynasty (조선후기 거창향교의 유지와 관리)

  • Song, Hye-Young
    • Journal of architectural history
    • /
    • v.30 no.2
    • /
    • pp.45-54
    • /
    • 2021
  • During the latter part of Joseon Dynasty, Local Confucian School(Geochanghyanggyo) had served as a government school and left many official documents on the educational construction. The construction of Local Confucian School(Geochanghyanggyo), which was recorded in official documents, was diverse, and most of them were reconstructed. Construction-works recorded in an official document was drafted in two ways. One was in the same format as the accounting records and the other was written in the diary format by date. The construction cost was mainly financed by selling the land owned. Of course, with the help of the government, they could receive some of the essential timber and expenses for the construction. The management and maintenance of educational construction was entrusted by a manager called 'Chaji(次知)'. Then there were employees called 'Jeonjik(殿直)' and 'Gojik(庫直)' and they were paid for their work.

A methodology for the standardization of structural design document structure using XML schema matching technique (XML 스키마 매칭 기법을 이용한 구조설계 문서구조 표준화 방법론)

  • Kim Bong-Geun;Jeong Yeon-Suk;Kim Dong-Hyun;Lee Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.200-207
    • /
    • 2006
  • A new formal standardization methodology of the structural design document information is proposed in this paper. The standardization process is divided into three steps: pre-process of the collected sample document (CSD), construction of the document structure, and definition of the occurrence of each element in the document. During the pre-process, the detail document contents in the CSD are indexed with templates defined in this study, and the indexed CSD is translated into XML Schema (XSD) formal Afterwards the degree of confidences of all elements between the temporary standard document (TSD) and the translated CSD are calculated by using the XML schema matching algorithm; the TSD is then updated. This second step is repeated until all of the CSD are compared. In the final step, the common elements and unbounded elements are extracted by determining the occurrence of the temporary document elements, and the standardized document schema is exported in the XSD format. The case study dealing with the structural calculation documents show that the ,proposed methodology can be effectively used to build a XML -based information model of structural design documents.

  • PDF

Automatic Construction of Korean Unknown Word Dictionary using Occurrence Frequency in Web Documents (웹문서에서의 출현빈도를 이용한 한국어 미등록어 사전 자동 구축)

  • Park, So-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.3
    • /
    • pp.27-33
    • /
    • 2008
  • In this paper, we propose a method of automatically constructing a dictionary by extracting unknown words from given eojeols in order to improve the performance of a Korean morphological analyzer. The proposed method is composed of a dictionary construction phase based on full text analysis and a dictionary construction phase based on web document frequency. The first phase recognizes unknown words from strings repeatedly occurred in a given full text while the second phase recognizes unknown words based on frequency of retrieving each string, once occurred in the text, from web documents. Experimental results show that the proposed method improves 32.39% recall by utilizing web document frequency compared with a previous method.

  • PDF

A STUDY ON THE PROCESS OF LARGE-SCALE REPAIR OF A CONDOMINIUM

  • Seki, Eiji;Akiyama, Tetukazu
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.295-300
    • /
    • 2002
  • Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.

  • PDF

An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014 (공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 -)

  • Jung, Wooyoung;Lee, Taewon;Rhee, Pung-wook;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.89-97
    • /
    • 2015
  • This paper analyzes the duration of the construction document (CD) phase of 42 large public building projects delivered by the total solution service of Public Procurement Services in Korea from 2009 to 2014. The quality of construction documents significantly affects the quality of construction and facility management. Thus, securing appropriate time for the CD phase during project planning is important for the quality of a project. Currently, the duration of the CD phase is planned based on the construction costs of a project following a notice of the Ministry of Land, Infrastructure and Transport. However, our analysis results showed that the correlation between the actual duration of the CD phase and construction costs is very weak. The actual CD phase takes 1.33-1.79 times longer than the planned duration. The practitioners who were interviewed, were already aware that the correlation between the duration of the CD phase and the construction costs is weak. They identified the complexity of the project, the extent of the design changes, project type, client characteristics, and others as more influential factors on the CD phase than the construction costs. To improve the quality of CDs, a new guideline for determining an adequate CD phase duration should be studied and developed.

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume (BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용)

  • Jung, Guk-Young;Woo, Jeong-Won;Kang, Kyeong-Don;Shin, Jae-Choul
    • Journal of KIBIM
    • /
    • v.3 no.3
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

Procedural Model of XML Schema Framework for Digitalizing Disaster Information Management for Construction Facility (시설물 재해정보관리 전자화를 위한 XML스키마 구축 방법의 절차적 모형 구성)

  • Kang, Leen-Seok;Park, Seo-Young;Moon, Hyoun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.56-64
    • /
    • 2006
  • The current disaster management manual is being utilized as a book or document-based type. It causes a low applicability and interoperability in practical business because each information has a different document format and it is difficult to recycle those information as common disaster information. The information reading by text type without electronic data and visual object also has a limitations in guaranteeing a quickness of disaster management business. Accordingly, the electronic document management system with visual information is necessary and the system needs to tie framed by XML schema because the electronic document standard will be changed from DTD to XML schema. This study attempts to develop a procedural methodology of an electronic document management system based on XML for disaster management. The applicability of the proposed results is verified by the simulated scenario.

Building Topic Hierarchy of e-Documents using Text Mining Technology

  • Kim, Han-Joon
    • Proceedings of the CALSEC Conference
    • /
    • 2004.02a
    • /
    • pp.294-301
    • /
    • 2004
  • ·Text-mining approach to e-documents organization based on topic hierarchy - Machine-Learning & information Theory-based ㆍ 'Category(topic) discovery' problem → document bundle-based user-constraint document clustering ㆍ 'Automatic categorization' problem → Accelerated EM with CU-based active learning → 'Hierarchy Construction' problem → Unsupervised learning of category subsumption relation