• 제목/요약/키워드: Construction Document

검색결과 341건 처리시간 0.023초

프로젝트 초기 단계에서의 분쟁방지를 위한 분쟁요인 추출에 관한 연구 - 턴키공사 사례 중심으로 - (A Study of Abstracting Dispute Factor to Prevent Dispute in Early Stage for Construction Project - Focusing on Turn-Key Project -)

  • 윤준선;권기범;서춘택;백준홍
    • 한국중재학회지:중재연구
    • /
    • 제14권1호
    • /
    • pp.315-344
    • /
    • 2004
  • Although we try to increase the order of turn key construction for the international competitiveness strengthening, the construction quality advancement and the productivity enhancement of the public sectors, the problems of the domestic turn key systems are causing the hardships of all the participants and many possible disputes. The home turn key constructions have been activated since 1997. A lot of trial and error had been experienced in these days, and the turn key systems have been changed little by little. But the bases are continuously kept because of their reflecting all the participants' opinions. In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of early stage owing to the specialties of the turn key construction. So the dispute factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key construction for the first time and working here now are well acquainted with only these factors, many disputes will be prevented.

  • PDF

MITIGATION AND REMISSION OF CONTRACTOR'S DEFECTS LIABILITY IN KOREAN CONSTRUCTION CONTRACTS

  • Jong-Gwang Lee ;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.447-451
    • /
    • 2005
  • The purpose of this study is to improve regulations such as law and standard contract forms related to defects liability in Korea. Defects liability has been one of the major causes of construction contract disputes in Korea in recent years. It is important to avoid or resolve disputes regarding defects liability through regulations containing clear criteria and to specify the standard regarding the mitigation and remission of the contractor's defects liability. This study was carried out through document research and analysis of judicial precedents. The following are the courses of improvement regarding the mitigation and remission of defects liability in Korea. First, laws and standard contract forms must contain more detailed clauses regarding exemption of a contractor's defects liability, which clearly set out the scope of the defects liability of the contractor. Second, the current system for defects liability favors the owner rather than the contractor - it is necessary to change the defects liability system in order to give the owner and the contractor an equal standing. Third, strict liability is taken on by the contractor even when the term of guarantee for defects lasts longer than the legally set period of liability for defects. Hence, it is necessary to improve the system by alleviating the liability of the contractor through applying negligence liability as opposed to strict liability during the term of guarantee.

  • PDF

KRX건설 주가지수와 기업경기실사지수 간의 선행-후행 관계 (The Lead-Lag Relationship between KRX Construction Index and Business Survey Index)

  • 유한수
    • 토지주택연구
    • /
    • 제14권4호
    • /
    • pp.39-46
    • /
    • 2023
  • 본 연구에서는 'KRX건설 주가지수'와 '건설업 기업경기실사지수' 간의 관계를 분석하였다. 본 연구는 공표된 주가지수를 '추세요소'와 '잡음거래요소'로 분해하여 '주가지수 추세요소'와 '건설업BSI' 간의 관계, '주가지수 잡음거래요소'와 '건설업BSI' 간의 관계에 대해서 분석하였다는 측면에서 기존연구들과 차별을 두었다. Granger 인과관계 검정 결과에서는 '공표된 KRX건설', '추세요소', '잡음거래요소' 모두 '건설업BSI'에 대해 단방향의 Granger 인과관계가 존재함을 보였다. 즉, 추세요소는 건설업BSI를 선행하는 것으로 나타났으며, 주식시장의 일시적 심리적 요소, 과잉 반응 등에 의해 생성되는 '잡음거래요소'도 '건설업BSI'에 대해 선행관계에 있는 것으로 나타났다. 본 연구결과와 같이 건설업 주가지수의 움직임이 건설업 경영자들의 기대심리에 선행한다는 연구결과는 건설업 경영자들의 투자의욕에 주식시장의 움직임이 영향을 준다는 함의를 제시하고 있다.

해양 플랜트 설계/시공에의 AIM/Explorer 적용사례 (A Study Case on Application of Aim/Explorer for Design and Construction of Offshore Plant)

  • 구여운;박찬국;안호준
    • 한국에너지공학회:학술대회논문집
    • /
    • 한국에너지공학회 2002년도 추계 학술발표회 논문집
    • /
    • pp.9-15
    • /
    • 2002
  • PDM(Product Data Management)은 제품정보 및 개발 프로세스를 관리하는데 많은 이점이 있는 도구로써 인식되어 왔으며, 제품 설계, 제작, 건설, 유지, 보수하는데 필요한 많은 양의 데이터 및 정보를 효율적으로 관리할 수 있다. PDM은 일반적으로 EDM(engineering data management), DM(document management), PIM(product information management), TDM(technical data management), TIM(technical information management) 등으로 알려진 기술의 보다 더 일반화된 개념이다.(중략)

  • PDF

대화 코퍼스의 구축 및 주석 정보의 구조적 문서화 (Construction of Dialogue Corpus and Structured Documentation of Annotation Information)

  • 강창규;김영일;김봉완;이용주
    • 한국멀티미디어학회:학술대회논문집
    • /
    • 한국멀티미디어학회 2003년도 추계학술발표대회(상)
    • /
    • pp.269-272
    • /
    • 2003
  • 음성인식의 연구 대상은 낭독음성에서 대화음성으로 발전해가고 있다. 이를 위해서는 대량의 대화코퍼스가 필요하다. 그러나 아직 충분한 양의 대화코퍼스가 구축되어 있지 못하며 코퍼스의 주석 정보 또한 복잡하고 다양하게 표현하고 있어 효율적인 활용이 어렵다. 따라서 본 논문에서는 대화 영역으로 텔래뱅킹 영역을 설정하고 대화코퍼스를 구축하여 구축된 대화코퍼스의 주석 정보를 XML(Extensible Markup Language)로 표준화할 수 있도록 DTD(Document Type Definition)를 정의하여 문서 구조화하였다.

  • PDF

일시적 거주개념을 적용한 1인용 소형주택의 공간구축유형 및 특성 (The Types and Characteristics of Space Construction in Temporary Small-sized Housing for Single-person Household)

  • 김미경;송애희
    • 한국주거학회논문집
    • /
    • 제23권2호
    • /
    • pp.115-124
    • /
    • 2012
  • The purpose of this study was to analyze the types and characteristics of space construction in temporary small-sized housing for single-person household through the understanding and interpretation of the modern flexible lifestyle. A document research method and case studies were used to analyze and classified the spatial characteristics of temporary dwelling spaces since 2000. Findings of the study were as follows: In order to conform the concept of temporary dwelling for small-sized housing units of single-person households, the types and characteristics of space construction were divided into three aspects: (1) 'Transporting' by wheel, rotation and vehicles, (2) 'Transforming' by adapting, assembling disassembling, and folding unfolding, (3) 'Wearing Carrying' by inflatable and tented type. In conclusion, this study found two types of space construction in temporary small-sized housing. The first was 'formal aspect' which was focused on the simplicity of shape, ease of deformation and lightweight of materials. And the second was 'functional aspect' which was focused on the complex space composition, the rapidity of installation and dismantling, ease of movement and transportation. This study shows that the combination of two types of the temporality will be more ideal in temporary small-sized housing planning rather than relying on just one type.

GS건설 해외 Project의 TPMS 적용 현황 (Implementation Status of TPMS in GS E&C's Overseas Projects)

  • 이준복;박찬정;김상철
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.135-139
    • /
    • 2008
  • GS건설은 당사에서 수행하는 모든 Project에 종합건설사업관리시스템인 TPMS (Total Project Management System)를 적용하고 있다. 국내 현장(現場)은 물론 해외에서 수행하는 모든 Project에도 TPMS를 적용하여 공사를 수행하고 있는데, 특히 해외 현장에서는 당사만이 아닌 협력업체부터 자재업체는 물론 발주처까지 함께 TPMS를 사용하여 성공적으로 사업을 수행하고 있다. 이렇게 적용된 당사의 TPMS는 단순 문서 공유 범위를 넘어 각 이해관계자가 원하는 정보를 실시간으로 얻을 수 있고, 모든 정보를 별도의 가공 없이 Project 내 말단 엔지니어의 입력한 결과가 최종적인 현황으로 집결되어 보여지므로, 실무자에게는 업무 효율성의 증대를 가져오고 있으며, 이해 관계자들에게는 당사의 투명한 업무 수행 결과 공유를 통한 신뢰를 구축하는 성과를 거두고 있다. 본 논문에서는 이러한 성공 사례를 문서관리를 중심으로 공유하고 당사의 향후 추진 방향에 대해 설명하고자 한다.

  • PDF

극한지 자원이송망 EPC단계에서 발생되는 데이터 항목에 관한 기초연구 (A Fundamental Study on Data Item occurred in EPC Stage of Pipeline in Extreme Cold Weather)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.18-19
    • /
    • 2014
  • As issued the development of energy resources, EPC work process through the IT technology is essential for efficient business management, and systematic management of data generated in this process is needed. In domestic, the research related to system development for the collection and management of construction data detected in the field has been done continuously, but pipeline business target the long-distance in extreme cold weather, almost no cases have been studied up to now. Therefore, this research is aimed to derive the data item for efficient management in EPC Stage of pipeline business in extreme cold weather. WBS system of EPC work are classified easily at two levels, data items can be divided based on the type of document. In the future I will be expected to be the foundation of the systematic management of data generated in the EPC step-by-step of pipeline business.

  • PDF

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • 제47권3호
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

건설사업정보시스템의 고도화를 위한 공간정보(GIS) 적용방안에 관한 연구 (Research on the Application of GIS-based Measures in the Advancement of the Construction Project Information System)

  • 옥현;김성진
    • 스마트미디어저널
    • /
    • 제4권4호
    • /
    • pp.70-79
    • /
    • 2015
  • 건설사업정보시스템은 국토교통부에서 건설사업정보화(CALS)의 일환으로 구축된 정보시스템으로 건설사업 전 업무단계의 디지털화, 정보 공유 등을 통해 건설사업의 생산성과 효율성 향상 및 투명행정을 실현하는데 목적을 두고 있다. 건설사업정보시스템은 국토부 내부 업무시스템 중 하나로 업무처리 위주의 기능과 데이터 관리에 중점을 두고 구축되어 운영 중에 있다. 하지만 구축된 지 10년 이상 경과된 정보시스템으로 주로 텍스트 및 문서위주의 건설사업정보로 이루어지고, 시각화 된 공간정보(Geographic Information System, 이하 GIS)와 결합되지 못해 정보 공유 및 전달과 전체적인 현황 파악에 한계를 가진다. 본 연구는 기존 건설사업정보시스템의 한계 및 문제점을 해결하고 시스템을 보다 고도화를 위한 방안으로 국내외 GIS 기술동향 및 관련 정보시스템을 살펴보고, 건설사업정보시스템의 현황 및 문제점을 분석하였다. 이를 통해 건설사업정보시스템의 고도화를 위한 전체적인 GIS 적용방안을 제시하였다. 또한 건설사업정보 단위시스템별 세부 활용 및 적용방안을 도출하고 향후 GIS 적용에 따른 고려사항을 분석하여 제시하였다.