• Title/Summary/Keyword: Construction Cost Estimation

Search Result 495, Processing Time 0.037 seconds

Estimation of Optimum Pile length Using Various Prediction (다양한 예측기법을 이용한 현장타설말뚝의 최적길이 산정)

  • Choi, Young-Seok;Iim, Hyung-Joon;Song, Myung-Jun;Jang, Hak-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.700-707
    • /
    • 2008
  • As plan connecting island to island or island to land is needed, a lot of long-span bridge is being designed lately in Southern part of Korea. With development of pile equipment, overhanging large-scaled concrete pile are adopted to foundation type of main tower or pylon. About the number of 15~30 group piles per tower foundation is designed to resist long-spaning super-structure load, but by restricted condition of site investigation cost, a few boring-hole tests are performed to identify sub-ground layers. Up to now, direct-curved method connecting two or three known boring logs and representative interval method are usually used to evaluate unknown depth and rock properties at locations where piles are constructed. Because this approach is not logical and so rough, much difference occurs between designed length of piles and real length of it. In this paper, using a lot of various prediction method(reciprocal distance method, inverse square distance method and kriging method etc.), we suggest optimum length of group piles.

  • PDF

Establishment of the Service Life of the Education Fcilities - Focused on the Roof water-proof and Floor finishings - (교육시설 내용년한 산정 연구 - 옥상방수와 바닥마감재를 대상으로 -)

  • Lee, Kang-Hee;Chae, Chang-U
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.6
    • /
    • pp.27-36
    • /
    • 2017
  • Educational facilities have an affect to make a decently learning environment. After constructed, it needs a maintenance plan to keep the performance or function which provide the repair time, repair scope and ratio. But the fundamental data are so insufficient that the field worker can't provide the maintenance plan and has no choice use the other data which concerned with apartment or office building. Above all, the service life is indispensible to make a repair plan because the repair time and scope would be provided within the service life. This study aimed at providing the method to make a service life of component in educational facilities and applying the method into the roof proof and floor finishing. Results are shown that first, it is important to set the $1^{st}$ repair time after constructed. when it proposes the three ways with the probability approach, choice probability model and cumulative cost function. Second, the service life of roof proof is provided with about 35 years. In addition, the service life of the floor finishing is about 40 years. These result would be utilized to conduct the repair plan under the service life.

Economic-based approach for predicting optimal water pipe renewal period based on risk and failure rate

  • Kim, Kibum;Seo, Jeewon;Hyung, Jinseok;Kim, Taehyeon;Kim, Jaehag;Koo, Jayong
    • Environmental Engineering Research
    • /
    • v.24 no.1
    • /
    • pp.63-73
    • /
    • 2019
  • This study suggests a method for calculating the benefits of water pipe renewal based on an estimate of the water supply suspension risk. The proposed method based on five benefit items is more direct and specific than other benefit estimation methods. In addition, a methodology evaluating the economics of pipe renewal based on pipe failure rate is proposed for estimating the optimal renewal point from an economic perspective. By estimating the optimal renewal period based on a yearly benefit cost ratio per pipe in a case study area, it was possible to draft an optimal renewal plan for the subject region from an economic perspective. Compared with other methodologies, a reasonable optimal renewal period was derived from an economic point of view. The result of this study may be used to develop future water pipe renewal plans. Moreover, the proposed methodologies and results derived from this study can be applied to asset management plans.

Maximum Terminal Interconnection by a Given Length using Rectilinear Edge

  • Kim, Minkwon;Kim, Yeonsoo;Kim, Hanna;Hwang, Byungyeon
    • Journal of information and communication convergence engineering
    • /
    • v.19 no.2
    • /
    • pp.114-119
    • /
    • 2021
  • This paper proposes a method to find an optimal T' with the most terminal of the subset of T' trees that can be connected by a given length by improving a memetic genetic algorithm within several constraints, when the set of terminal T is given to the Euclidean plane R2. Constraint (1) is that a given length cannot connect all terminals of T, and (2) considers only the rectilinear layout of the edge connecting each terminal. The construction of interconnections has been used in various design-related areas, from network to architecture. Among these areas, there are cases where only the rectilinear layout is considered, such as wiring paths in the computer network and VLSI design, network design, and circuit connection length estimation in standard cell deployment. Therefore, the heuristics proposed in this paper are expected to provide various cost savings in the rectilinear layout.

Analysis on the effect of the opening of high speed rail way on the change in the air passenger's demand - Focused on Seoul and Jeju line - (고속철도 개통이 항공여객 수요변화에 미치는 영향 분석 - 서울-제주간 노선을 중심으로 -)

  • Lee, Joon-Kyu;Yoo, Kwang-Eui;Kim, Duck-Nyung
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.1
    • /
    • pp.26-33
    • /
    • 2012
  • Competition between air transportation and railways has grown fiercer in major countries around the world with the rise of high-speed railways. In South Korea, air passenger travel has been rapidly decreasing since the initial launch of the Seoul-Pusan KTX line in 2004 and second opening that followed in 2010. Further expansion of the high-speed railway is expected. At present, research efforts to verify the validity of constructing an underwater express railway tunnel between Ho-nam and Jeju Island are taking place. Considering the possible high speed railway connection between Seoul and Jeju Island, this thesis has analyzed the choice behavior of existing passengers of the major and low-cost carriers. For this, Stated Preference (SP) research has been performed for three variables, including fare, travel time and the number of runs, to estimate the substitution rate of each of the three variables. Binomial Logit Model has been estimated with the obtained data. The estimation of the model has found that airline passengers of major and low-cost carriers are willing to pay approximately 7,200 KRW and 5,000 KRW, respectively, to reduce travel time by one hour. If the number of runs in one day increases, it has been estimated that the passengers are willing to pay additional fares of about 390 KRW and 30 KRW, respectively. On the other hand, the substitution rate between the number of runs and the travel time was found to be somewhat insignificant. If the construction of the Seoul-Jeju line progresses in the future, this study could be used as preliminary data for determining fares, travel time and the number of runs.

Enhancement of UAV-based Spatial Positioning Using the Triangular Center Method with Multiple GPS

  • Joo, Yongjin;Ahn, Yushin
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.37 no.5
    • /
    • pp.379-388
    • /
    • 2019
  • Recently, a technique for acquiring spatial information data using UAV (Unmanned Aerial Vehicle) has been greatly developed. It is a very crucial issue of the GIS (Geographic Information System) mapping system that passes way point in the unmanned airframe and finally measures the accurate image and stable localization to the desired destination. Though positioning using DGPS (Differential Global Navigation System) or RTK-GPS (Real Time Kinematic-GPS) guarantee highly accurate, they are more expensive than the construction of a single positioning system using a single GPS. In the case of a low-priced single GPS system, the stability of the positioning data deteriorates. Therefore, it is necessary to supplement the uncertainty of the absolute position data of the UAV and to improve the accuracy of the current position data economically in the operating state of the UAV. The aim of this study was to present an algorithm enhancing the stability of position data in a single GPS mode of UAV with multiple GPS. First, the arrangement of multiple GPS receivers through the center of gravity of the UAV were examined. Next, MD (Mahalanobis Distance) is applied to detect instantaneous errors of GPS data in advance and eliminate outliers to increase the accuracy of previously collected multiple GPS data. Processing procedure for multiple GPS reception data by applying the center of the triangular method were presented to improve the position accuracy. Second, UAV navigation systems integrated multiple GPS through configuration of the UAV specifications were implemented. Using the unmanned airframe equipped with multiple GPS receivers, GPS data is measured with the TCM (Triangular Center Method). In addition, UAV equipped with multiple GPS were operated in study area and locational accuracy of multiple GPS of UAV with VRS (Virtual Reference Station) GNSS surveying were compared. The result showed that the error factors are compensated, and the error range are reduced, resulting in the reliability of the corrected value. In conclusion, the result in this paper is expected to realize high-precision position estimation at low cost in UAV using multiple low-cost GPS receivers.

A Study on Behavior Analysis of Large-diameter Drilled Shaft by Design Methods in Deep Water Depth Composite Foundation (대수심 대형 복합기초에서 설계기법에 따른 대구경 현장타설말뚝의 거동 분석 연구)

  • Han, Yushik;Choi, Yongkyu
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.1
    • /
    • pp.5-16
    • /
    • 2015
  • In the long span bridge construction, construction cost portion of large scale marine foundation is about 40% (KICTEP, 2007). In this study, designs for deep water depth large composite foundation of a super long span cable-stayed girder bridge of prototype were performed by three design methods (ASD, LRFD, Eurocode) and the behaviors of a large diameter drilled shaft were analyzed and the 3D numerical analysis was performed. As a result, the soft rock socket lengths in allowable stress design estimation method were the longest. The soft rock socket lengths estimated by the design approach 2 among Eurocode and the LRFD were similar. The longer the socket length socketed in the soft rock was, the smaller the axial force acting on a large-diameter drilled shaft head was and the smaller the settlement of drilled shaft was.

Estimation of Demand for and Proper Capacity of Ro-Ro Berths in Korea-Japan Trade (한일간 Ro-Ro 부두 수요 및 적정 규모 추정)

  • Kim, Yul-Seong;Lee, Kyung-Nam;Kang, Dal-Won
    • Journal of Korea Port Economic Association
    • /
    • v.31 no.3
    • /
    • pp.107-120
    • /
    • 2015
  • International logistics systems for cross-border trading aim not only to reduce costs and time, but also to maximize added value. For accuracy of shipping time, cost reduction, rapidity, and safety improvement, demand for Ro-Ro shipping as a global supply chain operating system has increased. To anticipate these demands, this study estimates the optimal demand and scale of Ro-Ro berth construction by analyzing shipping volumes between Korea and Japan. Based on Ro-Ro shipping speeds and distances between Korea and Japan, the shipping volume (container and general cargo) of Busan port is sorted into two separate zones. After analyzing the ratio of items that have great potential benefits from using Ro-Ro shipping, we estimate possible shipping volumes using Ro-Ro berth provision. The results reveal that two berths for 20,000t vessels are additionally required to accommodate the estimated volume. Results suggest the construction of an exclusive Ro-Ro berth in Busan port. This would not only accommodate the demand between Korea and Japan, but also provide a way to avoid the lean-to-one-side port policy.

A Study on Differences of Economic Benefits by Volume Calibration in Road Construction Projects (도로시설 규모산정에 있어서 교통량 정산과정에 따른 경제적 편익 차이에 관한 연구)

  • Kim, Sang-Gu;Kim, Geun-Deok
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.5
    • /
    • pp.7-16
    • /
    • 2009
  • This paper proposes a plan which can raise the accuracy of economic benefit estimation in road construction projects. The point of existing economic appraisals may be that the speeds forecasted by models are different from the field speeds because only volumes are calibrated in the road network. The result of such a calibration has an influence on estimating wrong economic benefits in terms of vehicle operating cost savings, travel time savings, and air pollution savings. Then this study performs a calibration when volumes are at the same amount but the calibration between the field speeds and model speeds is different from each other with two different volume-delay functions; the differences of benefits are confirmed according to two different speed calibrations. Three improvement schemes, including the development of a new volume-delay function, are proposed in this study in order to solve the problem of current benefit calculations. The outcome of this study will help practitioners perform more accurate benefit calculations and reasonable economic appraisals.

A Study on the Estimation of the Behaviors by Compression Method of Rock Pillar between Close Parallel Tunnels (근접 병설터널에서 필라 압축방법에 따른 필라부 강도특성 변화에 관한 연구)

  • Kim, Jae-Kyoung;Lee, Song
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.12
    • /
    • pp.87-94
    • /
    • 2013
  • In recent years, tunnel construction is being increased in order to resolve traffic congestion around urban area, however there are a lot of difficulties due to restrictions such as interference with existing alignment, adjacent structures and cost increase of land acquisition as well as public complaints for negative environmental impacts near the expected tunnel construction site. Therefore, applications of close parallel tunnel have been increasing greatly. But close parallel tunnels cannot guarantee the stability compared with normal parallel tunnel which has enough distance between tunnels. So various methods to strengthen the pillar have been introduced recently, however there is few methods which consider the pillar behaviour in the state of compression. In this paper, the reinforcement methods which reflect the behavior of pillar were reviewed with comparision and analysis by numerical method.