• Title/Summary/Keyword: Construction Condition

Search Result 3,668, Processing Time 0.031 seconds

An Experimental Study on the Shrinkage Properties and Resistance for Chloride Attack of Seaside Construction Concrete added Durability Improvement Agent (내구성개선제가 첨가된 해안 구조물용 콘크리트의 수축특성과 내염해성에 관한 실험적 연구)

  • Kim, Do-Su;Kim, Woo-Jae;Kim, Hyun-Bae;Jung, Sang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.151-154
    • /
    • 2006
  • It is generally referred that life cycle of concrete construction is depend on whether durability of concrete is obtained or not. Nevertheless, it has not been yet applied that new material and technology to improve durability of concrete such as seaside concrete construction. In this study, chemical agent which is capable of improving durability added to 2 types seaside concrete mixs and evaluated engineering properties such as slump, air content, setting time and compressive strength. Besides shrinkage crack with an restraint condition and chloride ion penetration tests were executed to measure resistance of concrete added chemical agent and then compared non-added. It was appeared that engineering properties and resistant for chlorides was possible to improved. But resistant for shrinkage crack was not noticeable improvement than non-added. Therefore it is necessary that more consideration and following study to improve durability aspect to shrinkage crack and chlorides resistant.

  • PDF

A Study on the Actual Conditions of Quality Standards Recognition of Rebar Workers (철근작업자의 품질기준 인지 실태 조사)

  • Lee, Byung-Yun;Choi, Oh-Young;Han, Byung-Min;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.243-246
    • /
    • 2009
  • Importance of quality control is gradually increasing in the construction. And the reber work is very important things which influence in safety and durability of the building and accounts for about 9.8% of the total cost. Although reber work is important, quality control of the rebar work is still performed by attitude and experience of worker. Therefore, it is very important to quality achievement effort and quality standards recognition of rebar worker for quality sophistication in the construction. Some papers have dealt with the quality control in construction. But there was no study for actual conditions of quality standards recognition of rebar workers. The purpose of this study is to survey the actual conditions of quality standards recognition of rebar workers and to analyze difference of consciousness of administrator and worker. The result are : there id difference of consciousness of worker and administrator, workers work without knowing quality standard.

  • PDF

Framework of Non-Nuclear Methods Evaluation for Soil QC and QA in Highway Pavement Construction

  • Cho, Yong-K.;Kabassi, Koudous;Wang, Chao
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.45-52
    • /
    • 2012
  • This study introduces a methodology to evaluate different types of non-nuclear technologies to see how they are competitive to the nuclear technology for quality control (QC) and quality assurance (QA) in soil condition measurement for highway pavement construction. The non-nuclear methods including the Electrical Density Gauge (EDG) and the Light Weight Deflectometer (LWD) were tested for their performance against a nuclear gauge, and traditional methods were used as baselines. An innovative way of comparing a deflection gauge to a density gauge was introduced. Results showed that the nuclear gauge generally outperformed the non-nuclear gauge in accuracies of soil density and moisture content measurements. Finally, a framework was developed as a guideline for evaluating various types of non-nuclear soil gauges. From other perspectives rather than accuracy, it was concluded that the non-nuclear gauges would be better alternative to the nuclear gauge when the followings are considered: (1) greater life-cycle cost savings; (2) elimination of intense federal regulations and safety/security concerns; and (3) elimination of licensing and intense training.

An Experimental Study on the Fire Behavior of Two-way Void Slab under Standard Fire with Loading condition (표준화재 재하조건 이방향 중공슬래브의 화재거동에 관한 실험적 연구)

  • Kim, Hyung-Jun;Yeo, In-Hwan;Kim, Heung-Youl;Cho, Kyung-Suk;Kim, Jeong-Hyun
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.10a
    • /
    • pp.17-20
    • /
    • 2010
  • 기존의 무량판 구조와 동일한 이방향 슬래브구조인 TVS(two-way void slab)공법은 구조적 하중지지 성능이 불필요한 슬래브 단면상의 중앙부 콘크리트를 제거하여 슬래브의 자중을 줄이고 무량판 구조의 단점을 보완하여 장점을 극대화시킨 구조형식이다. 그러나 이러한 장점을 보유한 공법을 현장적용하기 위해서는 내화성능평가를 통해 화재안전성을 확보하여야 하므로, 이에 대한 화재 실증실험을 수행하여 현장적용을 위한 최소 요구내화 시간에 따른 내화성능 확보방안의 도출이 제시되어야 한다. 이에 본 연구에서는 TVS공법의 실제 스팬길이로 슬래브 피복두께에 따른 화재거동 영향성 분석을 위하여 화재실험을 수행하였다. 하중조건은 고정하중과 적재하중을 고려하여 실험체에 등분포 조건으로 사전재하하였으며, 표준화재조건으로 재하가열 실험을 수행하였다. 슬래브의 화재가열 노출면으로부터의 깊이별 온도변화와 처짐변형 특성을 측정하였으며, KS F 2257-1 평가기준에 의거하여 슬래브의 내화성능을 평가하였다. 실험결과 피복두께 50 mm를 확보할 경우, EPS중공체로 제작한 실험체의 경우 약 2시간정도의 내화성능을 확보할 수 있는 것으로 나타났다.

  • PDF

A Study on Displacement of Tunnel in the Brittel Fracture Zone under Excavation Construction (굴착시공 중 취약지반구간에서 터널변위 거동 연구)

  • Moon, Changyeul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.2
    • /
    • pp.45-52
    • /
    • 2014
  • The tunnel construction is increasing in order to secure a good driving performance of the car and train. A cases of tunnel collapse and the tunnel excessive displacement are increasing with the increase in tunnel construction. In terms of empirical construction methods using the strength characteristics of soil, it is important for tunnel construction to analyze causes of collapse and displacement. In the paper, it was analyzed the causes of collapse and excessive displacement of tunnel in the fractured ground condition. The results of analysis is that the increase of rainfall and lasting increase of displacement and large scale fractured ground are interconnected.

Design of Supertall Structures with Connected Towers the Structural Solution to the Development of Sky Cities

  • Wenwei, Jiang;Qi, Yu;Lianjin, Bao;Mingguo, Liu;Jun, Ji;Dasui, Wang
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.211-220
    • /
    • 2019
  • Three cases of supertall connected structures are presented and each of them represents a quite style. The first case is a strong-connected structure. The coupling function of towers and connector contributes a lot to the structural stiffness and stability. Its special construction scheme had great impact on the construction quality and the structural safety, and must be accurately considered. For the second case which is a weak-connected structure, the influences of different connecting modes to the structural dynamic characteristic were explained. Then the combined bearings were proposed to achieve the design presume. In the third case which represents the multi-supported structures, the structural distinctive mechanical properties were discussed. For the structural state during construction process is quite different from that in final service condition, two construction procedures were simulated to get an optimal one. Although there are great challenges to designers, the advantages of the supertall connected buildings are obvious. Further work is needed in this area to adapt to the development of future cities.

Algorithm of Level-3 Digital Model Generation for Cable-stayed Bridges and its Applications (Level-3 사장교 디지털 모델 생성을 위한 알고리즘 및 활용)

  • Roh, Gi-Tae;Dang, Ngoc Son;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.41-50
    • /
    • 2019
  • Digital models for a cable-stayed bridge are defined considering data-driven engineering from design to construction. Algorithms for digital object generation of each component of the cable-stayed bridge were developed. Using these algorithms, Level-3 BIM practices can be realized from design stages. Based on previous practices, digital object library can be accumulated. Basic digital models are modified according to given design conditions by a designer. Once design models are planned, various applications using the models are linked the models such as estimation, drawings and mechanical properties. Federated bridge models are delivered to construction stages. In construction stage, the models can be efficiently revised according to the changed situations during construction phases. In this paper, measured coordinates are imported to the model generation algorithms and revised models are obtained. Augmented reality devices and their applications are proposed. AR simulations in construction site and in office condition are tested. From this pilot test of digital models, it can be said that Level-3 BIM practices can be realized by using in-house modeling algorithms according to different purposes.

A Study of Non-Working Days Estimation in the High-rise Construction with Wind Load Data by Radiosonde

  • Kim, Se-Hoon;Kim, Yea-Sang;Shin, Hyuk;Kim, Hye-Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.188-191
    • /
    • 2015
  • This study is based on the data of velocity actually measured at varied the heights in the last 3 years. As mentioned in the World Meteorological Monitoring Plan(World Weather Watch: WWW), using the meteorological data by radiosonde can calculate the probability of velocity greater than 10m/s which is the standard beginning point of non-working condition by wind. The height is divided into sections, with 100m for each section starting from the ocean surface up to 700m high. The data measured at each section could be used for estimating and predicting the probability of non-working days for the construction nearby. For example, the data of Osan region is expected to be applicable for the project located in Seoul which has similar geographical conditions. As comparing the velocity varied with height, non-working days calculated basing on the measured data shows a variation of from -0.3 to +64 days. However, this study use Weibull distribution which considered more reliable, the result is expected to be more useful, as the data was all actually measured in the real conditions.

  • PDF

Database for Construction Materials Management System Based on RFID (RFID 기반의 건축 자재 관리 시스템을 위한 데이터베이스)

  • Mun, Ji-Youb;Hwang, Suk-Seung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.8
    • /
    • pp.793-800
    • /
    • 2016
  • The efficient materials management in construction field is a very important work required for designing and demolishing building. As the waste amount caused by the building demolition is increased, the concern related to the treatment method, recyclability, and effect on the environment have been gradually increased. In general, the conventional databases for the construction materials management does not consider the reuse of the construction materials on steps for the building demolition and reconstruction, but they only consider managing the type and input amount of them. In this paper, we propose the database system for efficiently managing the various construction materials informations including the location and condition of each construction materials for the efficient reuse of them on the building demolition and reconstruction. The considered informations are obtained the RFID(: Radio Frequency IDentification) system with on-board the location estimation module. Using the reuse management of construction materials, based on the proposed database, we expect the reduction of the construction cost and time.

Analysis of Delay Causation by Characteristics of Construction Projects (건설사업 특성에 따른 공기연장사유 분석)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.78-86
    • /
    • 2007
  • Top priority to manage construction projects is given to the planning and scheduling in order to keep the project duration, which is one of the most important factors in construction management. However, recently most of public construction projects especially for civil projects are delays and preventive research, many efforts were made concerning construction delays and preventive management methods. But analysis of delay causation, which is a main key to solve the problems is not done, yet. Therefore, in this research causation delays are analyzed by characteristics of construction projects, which are type of projects, type of contracts, project participants, and general condition. As a result of the analysis, delay causation are proved to be different by characteristics of the projects. The research results will be used for prevention of time extension and dispute resolution.