• Title/Summary/Keyword: Construction Cases

Search Result 2,204, Processing Time 0.034 seconds

Impact of Bridge Construction on County Population in Georgia

  • Jeong, M. Myung;Kang, Mingon;Jung, Younghan E.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1017-1023
    • /
    • 2022
  • Past research shows that the construction of new infrastructure accelerates economic growth in the region by attracting more people and commodities. However, the previous studies only considered large-scale infrastructures such as sea-cross bridges and channel tunnels. There is a paucity of literature on regional infrastructure and its impact on socio-economic indicators. This paper explores the impact of new bridge construction on the human population, particularly focusing on regional bridges constructed during the 2000s in the state of Georgia. The human population at a county level was selected as a single socio-economic factor to be evaluated. A total of 124 cases were investigated as to whether the emergence of a new bridge affected the population change. The interrupted time series analysis was used to statistically examine the significance of population change due to the construction by treating each new bridge as an intervention event. The results show that, out of the 124 cases, the population of 67 cases significantly increased after the bridge construction, while the population of 57 cases was not affected by the construction at a significance level of 0.05. The 124 cases were also analyzed by route type, functional class, and traffic volume, but the results revealed, unlike large-scale infrastructure, that no clear evidence was found that a new bridge would bring an increase in the human population at a county level.

  • PDF

Dispute Mediation Cases and Suggestions for Calculating Compensation for Dust Damage (먼지 피해의 환경분쟁조정 사례 분석과 배상액 산정안 제언)

  • Jeong-Ho Park
    • Journal of Environmental Science International
    • /
    • v.32 no.10
    • /
    • pp.693-701
    • /
    • 2023
  • In this study, we analyzed 82 dust damage dispute mediation cases over the past 5 years and evaluated cases where the probability of damage was verified through dust concentration measurement, modeling prediction, and chemical composition analysis. The cause of dust damage was a construction site, which accounted for most of the damage (97%), and was closely related to the distance from the construction site, total floor area of the construction site, and construction duration. Compensation was decided in only 33% of dust damage cases, and in only 6% (five cases) were damages determined using scientific techniques such as dust measurement, and forecasting. The main criteria for determining compensation were whether administrative measures were taken and evidence of damage in the form of videos and photos. In the future, measuring or model for the amount of dust damage is necessary to determine whether the limit has been exceeded and to revise the standard for calculating compensation through various lines of evidence of dust damage.

Analysis of Dispute Cases According to the Construction Project Phases -Focused on Cases of the Supreme Court and Korean Commercial Arbitration Board- (건설프로젝트 단계별 분쟁사례 분석에 관한 연구 - 대법원 및 대한 상사 중재원 사례를 중심으로 -)

  • Lee, Yi-Do;Park, Jeong-Ro;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.185-189
    • /
    • 2010
  • As recent construction project has specialization and high-level of the engineering, Although, It has always uncertainty of agreement and contract enforcement, factors of difficult to predict etc. in each phase. In this process, Various interest groups involved are continuously generated dispute of interest each others. So this paper analyzed the dispute cases in construction projects from the Supreme Court and Korean Commercial Arbitration Board in Korea, and then identified the dispute types and causes that occur during all of the construction project phases with their influence analysis. At the result, It will be contributed to the basic data for pre-dispute prevention in the construction projects.

  • PDF

The Current Situation of Construction Arbitration and Suggestions to Increase its Use in Korea (우리나라의 건설중재 현황과 활성화 방안)

  • Chae Wan-Byung
    • Journal of Arbitration Studies
    • /
    • v.14 no.2
    • /
    • pp.243-279
    • /
    • 2004
  • The construction arbitration field has developed considerably since the latter half of the 1990s. Through analysis of construction arbitration cases taken up by KCAB, this paper intends to show the present condition and the improvement direction of construction arbitration in Korea. The number of construction arbitration cases filed at KCAB has been increasing rapidly after 1997, but recently the rate of increase has tended to decline. From 2000 to 2003 the number of arbitration cases increased 23% each year, on average, but in 2003 the increase was only 7.6%. In the very beginning, public construction claims made up the majority of all construction cases, however, civil construction claims are increasing gradually. The arbitration amount in the construction field is very high, owing to public construction claims. For example, the arbitration amount per case was 5 billion won, on average,. in the public construction field. It is shown that the claimants of arbitration are mostly constructors and the main reasons for making claims are to demand payment for construction and payment for additional work. KCAB investigated the performance status of arbitration awards. The voluntary performance rate for awards in construction arbitration is nearly 80% and in 11%, a suit was filed to appeal the arbitration award. In spite of the development of construction arbitration, some improvements are requested. There have been arguments about the effectiveness of selective arbitration agreement in the General Terms of Construction Contract. This has caused a decrease in arbitration cases, so improvements in this dispute settlement clause need to be made. Enforcement of arbitration awards is granted by the judgment of a court. Resulting from this, appeals for arbitration awards are not allowed, however, up to three appeals for the enforcement of awards are allowed in court. As such, the enforcement system for arbitration awards needs to be improved and simplified.

  • PDF

Comparative Analysis of the Environmental Management Cost in Building Construction Sites (건축공사 환경관리비 운영체계 비교 분석)

  • Koo, Jakon
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.111-116
    • /
    • 2010
  • The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.

Analysis of Construction Cases for Sequential PC Stairway Method (RC 계단실 연속화 시공을 위한 PC 계단 공법 현장사례 분석)

  • Lee, Suk-Yong;Rhim, Hong-Chul;Kim, Ook-Jong;Cho, Hong-Duk;Jeong, Mee-Ra
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.15-19
    • /
    • 2008
  • The use of Precast Concrete (PC) stairways is increasing to replace existing Reinforced Concrete (RC) stairways for the faster construction and the better quality control. Among several already developed PC stairway construction methods, RC Core Sequential Construction Method by Using PC Stairways (COSEC) has advantages of 1) allowing core of a building to be built prior to PC stairways so that two different procedures will not interfere with each other, and 2) having a newly developed joint connection with the core so that the RC core and PC stairways can be easily put together. In this paper, cases of several construction sites with the PC stairways method are analyzed. The elements of the developed method are described for further application and improvement.

  • PDF

Development of a Quantified Risk Prediction Process for Workers in Construction Projects ConsideringSite Conditions and Accident Cases (현장조건과 사고사례를 반영한 건설사업 근로자의 정량화된 위험도 예측 프로세스 개발)

  • Jung, Changhoon;Jang, Jiyoung;Park, Sangwon;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.94-95
    • /
    • 2019
  • Recently, the importance of prevention has emerged for the management of construction safety accidents.. Accordingly, this study collects and quantifies various risk factors at the construction site to represent them as direct risks and to create a predictive process for prevention in advance. These risk figures can be used as comprehensive safety figures to reflect current site conditions and past accidentt cases. The prevention of industrial accidents is managed in advance through the development of applications thatt quantify and predict the risks of individuals working at construction sites. The purpose of the project is to reduce industrial accidents in the construction industry by supporting safety management of site managers and workers.

  • PDF

Construction of the Slide Cases with Presentation Tool (프리젠테이션 도구를 활용한 슬라이드 사례개발)

  • Park Yong-Soo
    • Management & Information Systems Review
    • /
    • v.4
    • /
    • pp.595-610
    • /
    • 2000
  • This paper presents a study regarding a construction of the slide cases through the useful and practical design using presentation tool-Microsoft Powerpoint, which can offer to the person in charge with more useful and practical information for the construction of the slide cases. In this study, Presentation program is used to construct case in the slides. The results of this study may be summarized as follows : First, it is possible to construct useful and practical case in the slides with presentation program. Second, this study proposes directions for the construction of slides with presentation program.

  • PDF

A METHOD OF REVISING RETRIEVED SIMILAR CASES IN GA-CBR COST MODELS

  • Sooyoung Kim;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Joseph Ahn
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.182-186
    • /
    • 2011
  • Early cost estimates are important to decision-making for a construction project. Moreover, the possibility of reducing the project cost is getting less as the project is progressed. Case-based reasoning (CBR), which can be viewed as an effective method for early cost estimating, is widely utilized recently. Early cost estimates using CBR have advantages over the traditional ones as they produce reasonable outputs and self-studying is possible by simply adding new cases. Case-based reasoning is composed of a cycle of retrieve, reuse, revise, and retain process. However, in the majority of research cases, they are focused on how to retrieve the similar cases, instead of revising the cases which is expected to increase accuracy results of cost estimation. This research suggests a method of revising retrieved similar cases in a GA-CBR cost model which is widely studied and utilized for early cost estimating recently. To validate the proposed method, case study is conducted based on Korean public apartment projects.

  • PDF

A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work (중대재해사례와 직업강도를 고려한 건축공사 위험성 평가)

  • Lee, Jong-Bin;Go, Seong-Seok;Jang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).