Kharmanda, G.;Sharabatey, S.;Ibrahim, H.;Makhloufi, A.;Elhami, A.
International Journal of CAD/CAM
/
v.9
no.1
/
pp.1-16
/
2010
When Deterministic Design Optimization (DDO) methods are used, deterministic optimum designs are frequently pushed to the design constraint boundary, leaving little or no room for tolerances (or uncertainties) in design, manufacture, and operating processes. In the Reliability-Based Design Optimization (RBDO) model for robust system design, the mean values of uncertain system variables are usually used as design variables, and the cost is optimized subject to prescribed probabilistic constraints as defined by a nonlinear mathematical programming problem. Therefore, a RBDO solution that reduces the structural weight in uncritical regions does not only provide an improved design but also a higher level of confidence in the design. In this work, we seek to improve the quality of RBDO processes using efficient optimization techniques with object of improving the resulting objective function and satisfying the required constraints. Our recent RBDO developments show its efficiency and applicability in this context. So we present some recent structural engineering applications demonstrate the efficiency of these developed RBDO methods.
Recently, the study in efficient operation, maintenance, and equipment-design have been growing rapidly in military industry to meet the required missions. Through out these studies, the importance of Concurrent Spare Parts(CSP) are emphasized. The CSP, which is critical to the operation and maintenance to enhance the availability, is offered together when a equipment is delivered. Despite its significance, th responsibility for determining the range and depth of CSP are done from administrative decision rather than engineering analysis. The purpose of the paper is to optimize the number of CSP per item using simulation and multiple regression. First, the result, as the change of operational availability, was gained from changing the number of change in simulation model. Second, mathematical regression was computed from the input and output data, and the number of CSP was optimized by multiple regression and linear programming; the constraint condition is the cost for optimization. The advantage of this study is to respond with the transition of constraint condition quickly. The cost per item is consistently altered in the development state of equipment. The speed of analysis, that simulation method is continuously performed whenever constraint condition is repeatedly altered, would be down. Therefore, this study is suitable for real development environment. In the future, the study based on the above concept improves the accuracy of optimization by the technical progress of multiple regression.
Currently, the H purification plant determines the hourly water intake amount based on operator experience and skill. Therefore, inevitably, there are deviations among operators. While meeting time-varying demand and maintaining the proper water level in the clean water reservoir, the methodology for minimizing electricity cost, when dealing with different electricity rate time zones, is a very complicated problem, which is beyond an operator's capability. To solve this problem, a linear programming (LP) model is proposed, which can determine the optimal hourly water intake amount for minimizing the daily electricity cost. It is shown that an inaccurate estimate for the hourly water usage in the demand areas causes the water level constraint to be violated, which is the weak point of the proposed LP method. However, several examples with real-field data show that we can practically and safely solve this problem with safety margins. It is also shown that the safety margin method still works effectively whether the estimate is accurate or not. The operators need not attend the site at all times under the proposed LP method, and we can additionally expect reductions in labor costs.
Journal of Korean Society of Industrial and Systems Engineering
/
v.41
no.4
/
pp.9-21
/
2018
In South Korea, Jeju Island has a role as a test bed for electric vehicles (EVs). All conventional cars on the island are supposed to be replaced with EVs by 2030. Accordingly, how to effectively set up EV charging stations (EVCSs) that can charge EVs is an urgent research issue. In this paper, we present a case study on planning the locations of EVCS for Jeju Island, South Korea. The objective is to determine where EVCSs to be installed so as to balance the load of EVCSs while satisfying demands. For a public service with EVCSs by some government or non-profit organization, load balancing between EVCS locations may be one of major measures to evaluate or publicize the associated service network. Nevertheless, this measure has not been receiving much attention in the related literature. Thus, we consider the measure as a constraint and an objective in a mixed integer programming model. The model also considers the maximum allowed distance that drivers would detour to recharge their EV instead of using the shortest path to their destination. To solve the problem effectively, we develop a heuristic algorithm. With the proposed heuristic algorithm, a variety of numerical analysis is conducted to identify effects of the maximum allowed detour distance and the tightness of budget for installing EVCSs. From the analysis, we discuss the effects and draw practical implications.
Journal of the Korean Society of Propulsion Engineers
/
v.3
no.2
/
pp.1-9
/
1999
Applicability of the pressure gradient method which is formulated based on pressure gradient is verified against turbulent flow analysis. In the pressure gradient method, pressure gradient instead of pressure itself is obtained using continuity constraint. Since correct pressure gradient is found only when mass conservation is satisfied, pressure gradient method can reflect physics of flow field properly The pressure gradient method is formulated with semi-staggered grid system which locates each primitive variables on the same grid point but evaluates pressure gradient in-between. This grid system ensures easy programming and reflection of correct physics in analysis. For verifying applicability of this method, the pressure gradient method is applied to turbulent flow analysis with low Reynolds number $\kappa$-$\varepsilon$ model. Turbulent flows include fully developed channel flow, backward-facing step flow, and conical diffuser flow. Prediction results show that the pressure gradient method can be applied to turbulent flow analysis. However, the pressure gradient method requires somewhat long computation time. Proper way to find optimum under-relaxation factor, $\gamma$, is also need to be developed.
Journal of Korean Society of Industrial and Systems Engineering
/
v.40
no.4
/
pp.105-111
/
2017
Vendor Managed Inventory is a well-known vendor-retailer coordination approach in supply chain management where the vendor manages inventory of the retailer and determines the order interval and order quantity for the retailer. To consider practical situation, the upper limit of inventory for the retailer is set. If the inventory level for the retailer exceeds the upper limit, then the penalty cost is charged to the retailer. Furthermore, maximum allowable inventory level is set for the vendor to prevent the vendor from keeping much inventory. Single-vendor multi-retailer supply chain model with upper limit of inventory for vendor and retailers is studied. All the retailers' are assumed to have the common cycle time, and a vendor manages retailers' inventory and replenishes products. The mathematical formulation is introduced to minimize the total cost including the penalty cost violating the upper limit of inventory for retailers with the constraint of maximum allowable inventory level. The solution procedure based on Karush-Kuhn-Tucker (KKT) conditions is derived. KKT conditions are often applied to find an optimal solution of nonlinear programming problem with constraints. An illustrative example is used to show the application of the proposed solution procedure. Furthermore, sensitivity analysis is done to find out the relationship between maximum allowable inventory level and other values such as order quantity, the number of shipment, vendor's cost, retailer's cost, and total cost. As maximum allowable inventory level decreases, the number of shipment decreases but total cost increases. Order quantity has the trend of decline and is affected by the number of shipment.
The Journal of Korean Institute of Communications and Information Sciences
/
v.23
no.8
/
pp.2032-2041
/
1998
In this work, we propose a novel bit allocation method that is to minimize overall distortions subject ot the bit rate constraint. We partition the original bitallocation problem into 'macroblock level bit allocation' problems that can be solved by conventional Lagrangian mutiplier methods and a 'frame level bit allocation' problem. To tackle the frame level problem, 'two-phase optimization' algorithm is used with iter-frame dependency model. While the existing approaches are almost impossible to find the macroblock-unit result for the moving picture coding system due to high computational complexity, the proposed algorithm can drastically reduce the computational loads by the problem partitioning and can obtain the result close to the optimal solution. Because the optimally allocated results can be used as a benchmark for bit allocation methods, the upper performance limit, or a basis for approximation method development, we expect that the proposed algorithm can be very useful for the bit allocation related works.
KSCE Journal of Civil and Environmental Engineering Research
/
v.13
no.2
/
pp.173-182
/
1993
This paper presents an algorithm to derive the representative unit hydrograph for the real environment of a watershed. For a given watershed, the conventional methods give several different unit hydrographs by storm events. In this study the LP model is somewhat modified based on the previous study by Mays et also as follows: the objective function is designed to minimize the sum of weighted residuals. An additional constraint of moving average is added to prevent the unit hydrograph from the occurence of oscillation which was not active in Mays's paper. Configuration of rainfall matrix was improved to reduce its dimension in accordance with Diskin's review point. In spite of the superiority of LP approach in terms of representativeness, all the methods were very sensitive to the validity of baseflow separation and rainfall-loss. Several methods of the separations for rainfall excesses and direct runoffs were applied and no preferred methods were identified. This is the matter of judgement considering catchment and rainfall characteristics. This algorithm was applied to a real watershed of the Wi stream in the Nak-dong river. Compared with the IHP results by conventional methods, this optimized representative unit hydrograph demonstrated relatively smaller and shorter values in terms of the peak discharge and the basin lag respectively, and the oscillation of its falling limb successfully eliminated owing to the additional constraints of moving averages.
Journal of the Korean Institute of Telematics and Electronics C
/
v.36C
no.11
/
pp.64-74
/
1999
A new clock skew optimization for clock routing using link-edge insertion is proposed in this paper. It satisfies the given skew bound and prevent the total wire length from increasing. As the clock skew is the major constraint for high speed synchronous ICs, it must be minimized in order to obtain high performance. But clock skew minimization can increase total wire length, therefore clock routing is performed within the given skew bound which can not induce the malfunction. Clock routing under the specified skew bound can decrease total wire length Not only total wire length and delay time minimization algorithm using merging point relocation method but also clock skew reduction algorithm using link-edge insertion technique between two nodes whose delay difference is large is proposed. The proposed algorithm construct a new clock routing topology which is generalized graph model while previous methods uses only tree-structured routing topology. A new cost function is designed in order to select two nodes which constitute link-edge. Using this cost function, delay difference or clock skew is reduced by connecting two nodes whose delay difference is large and distance difference is short. Furthermore, routing topology construction and wire sizing algorithm is developed to reduce clock delay. The proposed algorithm is implemented in C programming language. From the experimental results, we can get the delay reduction under the given skew bound.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.