• Title/Summary/Keyword: Connection Management)

Search Result 1,438, Processing Time 0.026 seconds

Global Optimization for Energy Efficient Resource Management by Game Based Distributed Learning in Internet of Things

  • Ju, ChunHua;Shao, Qi
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.10
    • /
    • pp.3771-3788
    • /
    • 2015
  • This paper studies the distributed energy efficient resource management in the Internet of Things (IoT). Wireless communication networks support the IoT without limitation of distance and location, which significantly impels its development. We study the communication channel and energy management in the wireless communication network supported IoT to improve the ability of connection, communication, share and collaboration, by using the game theory and distributed learning algorithm. First, we formulate an energy efficient neighbor collaborative game model and prove that the proposed game is an exact potential game. Second, we design a distributed energy efficient channel selection learning algorithm to obtain the global optimum in a distributed manner. We prove that the proposed algorithm will asymptotically converge to the global optimum with geometric speed. Finally, we make the simulations to verify the theoretic analysis and the performance of proposed algorithm.

Agent-Based Load Balancing Method for Web GIS Services; Web-Based Forest Fire Management System

  • Jo, Yun-Won;Jo, Myung-Hee;Oh, Jeong-Soo
    • Korean Journal of Remote Sensing
    • /
    • v.17 no.4
    • /
    • pp.359-368
    • /
    • 2001
  • The prototype of forest fire management system on Web was studied. In the architecture of this system, one of the most important concerns is to handle load upcoming to Web Server so that it provides Web service without any delay or failure. In order to solve this problem, the agent is designed on dispatcher in a Web server cluster and implemented to distribute load dynamically by considering the information related to load coming to the Web Server such as the number of connection to the Map Server. The proposed forest fire management system has user-friendly interface with the GIS mapping functionality by selecting Map Objects Internet Map Server (MO IMS) as Map Server and is implemented using Java as programming language.

RELEVANT CODES AND REGULATIONS: EFFECTS ON THE DESIGN OF INDUSTRIAL CONSTRUCTION

  • Ahmed Abdallah
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.409-416
    • /
    • 2005
  • This paper presents the possible effects and restrictions that may arise in the field of industrial construction due to compliance with relevant construction codes and regulations, as well as the ways they can be favorably handled in the design of industrial buildings. Designs should be based primarily on human design factors, while considering the human as the centre of the work environment. Design parameters should be described as a function of both the physical and psychosocial attributes of a person as well as the technical and economical aspects on the design of industrial construction. This paper is an examination of the connection that exists between design law (codes and regulations) and industrial construction. The relevant construction laws and regulations are described, including standards and codes of practice that designing and supervising engineers are obliged to observe. Possible solutions and consequences of development in the production, constructional, and ergonomic field of design are also discussed.

  • PDF

INTERPRETATION OF THE RELEVANT CONSTRUCTION CODES AND REGULATIONS, AND THEIR IMPLEMENTATION ON AN ERGONOMICAL AND SAFE WORK ENVIRONMENT

  • Ahmed Abdallah
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.429-436
    • /
    • 2005
  • This paper reflects on the ergonomical criteria for a humane working atmosphere in industrial buildings while respecting and paying close attention to the physical, mental, and stressful demands of the work environment. It describes effective construction codes and standards of practice and their importance in ensuring a safe environment for working people. Also addressed are the objectives for a productive work environment and its organization. The paper considers the significance of a proper working environment, the use of dangerous working materials, the use of proper ventilation, climate, and lighting to ensure that the productivity of the enterprise is met with common goals shared between employer and employee. The connection between the legal foundation and the design of industrial construction is the focus of this paper. It shows that the planning and executive persons are obliged to observe the relevant construction laws and regulations including standards and codes of practice. Additionally discussed are the possible solutions and consequences for development in the productional, constructional, and ergonomical fields of design.

  • PDF

Development of job stress measurement system for construction field managers (건설공사 현장소장 직무스트레스 측정 시스템 개발)

  • Lee, Tae -Shin;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.121-122
    • /
    • 2022
  • Recently, the scale of construction project is getting bigger compared to previous projects. Therefore, the job stress of the field manager responsible for the construction project is getting more and more intense. Therefore, construction companies should establish a job stress management plan for stable human resource management of the field managers. From this perspective, in this study was developed a job stress measurement system in connection with MBTI personality types. The developed system allows the job stress of the field manager to be judged on a scale from 1 to 9 points. Accordingly, it is expected that construction companies will contribute to the effective management of field managers in the future.

  • PDF

Project Learning Enablers within Fragmented Construction Projects

  • Alashwal, Ali Mohammed
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.588-592
    • /
    • 2015
  • Many studies have affirmed a negative influence of fragmentation on learning and knowledge sharing in construction projects. However, the literature overlooked enablers of learning within this context. The purpose of this paper is to explore the factors that facilitate project learning and ways to negate any unbecoming effects of fragmentation. Qualitative study used to explore the enablers through interviews administered to 11 top management individuals working in different construction projects in Malaysia. The findings revealed the following factors: participation, relationships, togetherness, and roles of project leader and coordinator. The role of boundary objects was also highlighted including information technology (IT), contract and procedures, drawings, specifications, and reports. The outcome of this paper initiates the development of a model for better knowledge creation and sharing in construction projects. The significance of this model stems from its ability to connection both the characteristics of construction project and project learning theories using the enablers. It is envisaged that future work will be to confirm the model in a quantitative study.

  • PDF

Use of Cardiac Computed Tomography and Magnetic Resonance Imaging in Case Management of Atrial Fibrillation with Catheter Ablation

  • Hee-Gone Lee;Jaemin Shim;Jong-il Choi;Young-Hoon Kim;Yu-Whan Oh;Sung Ho Hwang
    • Korean Journal of Radiology
    • /
    • v.20 no.5
    • /
    • pp.695-708
    • /
    • 2019
  • Atrial fibrillation (AF) is the most common arrhythmia associated with the risk of morbidity and mortality in clinical patients. AF is considered as an arrhythmia type that develops and progresses through close connection with cardiac structural arrhythmogenic substrates. Since the introduction of catheter ablation-mediated electrical isolation of arrhythmogenic substrates, cardiac imaging indicates improved treatment outcome and prognosis with appropriate candidate selection, ablation catheter guidance, and post-ablation follow-up. Currently, cardiac computed tomography (CCT) and cardiovascular magnetic resonance (CMR) imaging are essential in the case management of AF at both pre-and post-procedural stages of catheter ablation. In this review, we discuss the roles and technical considerations of CCT and CMR imaging in the management of patients with AF undergoing catheter ablation.

A Study on the Method for Promoting Acceptance on Performance Management : Focusing on the Public Enterprises Practices (성과관리의 수용성 제고 방안 : 공기업사례를 중심으로)

  • Kim, Youn Sung;Yoo, Hong Sung;Kim, Sun Cheol
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.40 no.1
    • /
    • pp.185-198
    • /
    • 2015
  • This study drew performance management factors analyzed a causal link between acceptance and satisfaction of performance management to present the method for promoting acceptance on the performance management system that most of the public enterprises, government-affiliated organizations are implementing. To achieve this, qualitative analysis and quantitative analysis were conducted in parallel through in-depth case studies and surveys. The results of this study are as follows. First, the analysis of the performance management factors with preceding studies shows that performance management indicators, performance management operations and performance management communications. Second, from the causal relationship of performance management factors affecting performance management acceptance reveals that performance management operation has statistical significance. Third, the analysis of the effect of performance management factors on the management satisfaction shows that operation and indicator of the performance management have statistical significance and reflecting the performance indicators to business, adequacy of target level, training, system support and CEO's Leadership have been revealed as important variables to the management satisfaction. Fourth, the result of the analysis on casual connection between acceptance and satisfaction of the performance management shows that improving management acceptance has a direct impact on satisfaction because performance management receptiveness were deemed statistically significant. Fifth, the result of the in-depth case studies on improving performance management acceptance shows that public enterprises have been putting in an effort to design indicators and try to encourage internal member's involvement during the monitoring and evaluation. The quantitative analysis based on survey has turned out that performance management operation and performance management indicators have statistical significance. The qualitative analysis by in-depth analysis shows that public enterprises put a lot of effort to performance management indicators and communication between internal members. As a result, commitment to performance management operation is required to improve the performance management acceptance. In other words, a detailed implementation plan for training, information system support, and CEO's leadership has to be established and ought to be pushed.

A Study on the successful model of the e-business for management renovation (경영혁신을 이한 e-비즈니스의 성공모델에 대한 연구)

  • Jo, Jae-Wan
    • Journal of Digital Convergence
    • /
    • v.4 no.2
    • /
    • pp.109-126
    • /
    • 2006
  • The United States Intel company and these enterprises which Andy Grove President talks exception are without coming out at the Internet enterprise and the hereafter 5 year back side separately it means the necessity which will write the word which is a Internet enterprise will lose. When that time about, it puts upper volume from the Internet territory which is will open the competition where the relation enterprises are keen the winner will be undertaken the existing enterprises and the place where it receives the footlights where the e-business is many in this recent times which it talks, the reason the whole world becomes connection with the Internet, the frame of the social whole changes and the arrival result completeness sincerity pursuit of information comes to be possible simultaneously, it is changing as the product army which is complicatedly diversified from the product army where the craving of the customer becomes simplification. The consequently quick doctor decision and efficient manufacturing environment construction are demanded and Product Life cycle becomes shortening, the e-Business from the digital management environment which changes suddenly the necessity is plentifully raising its head with plan of competitive power security of the enterprise and management renovation. Successful of the e-business model and failure instances there is a depth from the research which it sees and after trying to investigate, it originated to the advancement of digital environment the strategies and to sleep against the successful model of the e-business for a new management renovation presentation it tries it does.

  • PDF

Development of KMS system Prototype for Increasing Plant Construction Competitiveness (플랜트 건설의 경쟁력 향상을 위한 KMS 시스템 프로트타입 개발)

  • Koh, Sung-Won;Jun, Young-Joon;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.725-728
    • /
    • 2008
  • According to this plant construction trends, the future plant construction will be very complex, specialization and oversize, so it is expected that future plant construction will create high-profits and require the connection between high-technology and construction method. To catch this advance, more detail business management plan and knowledge sharing technology are needed as basic element. Consequently, this study will analyze the status of current plant industry and develop the educational curriculum for plant business participants, and based on study outcome, this study will propose that web-based portal system by Knowledge Management System(KMS) prototype to fit each company's characteristics.

  • PDF