• 제목/요약/키워드: Conduit

검색결과 455건 처리시간 0.027초

GoreTex$^{\circledR}$ 인조혈관을 이용한 해리성 하행 흉부대동맥류 성형술 - 수술치험 2례 - (Aortoplasty with Using Gore-Tex Conduit in Dissecting Aneurysms of Descending Thoracic Aorta - Two Cases Report -)

  • 정진용
    • Journal of Chest Surgery
    • /
    • 제22권5호
    • /
    • pp.816-822
    • /
    • 1989
  • Aneurysms of the descending thoracic aorta can be caused by various etiologies. So, its abrupt rupture leads life-threatening state, it must be operated as soon as possible. Surgical treatment of the descending thoracic aortic aneurysm requires temporary cross-clamping of major artery. The obligatory occlusion of the descending thoracic aorta during management causes proximal arterial hypertension and distal arterial hypotension. The former may leads to left ventricular failure, or cerebrovascular accident, whereas the latter may leads to spinal cord ischemia or renal injury. Some have recommended insertion of temporary shunt around the occluded descending aorta to prevent above problems. Still others would favor expeditious operation employing simple aortic occlusion during the repair of the descending aorta. Recently we had experienced two cases of dissecting aneurysms of descending thoracic aorta which performed aortoplasty with Gore-Tex conduit under simple aortic occlusion. The one was 34-year-old female patient with traumatic dissecting aortic aneurysm [5 em X 5 cm] on the descending thoracic aorta distal to the origin of the left subclavian artery and the other was 58-year-old female patient with atherosclerotic dissecting descending thoracic aortic aneurysm [6 cmX7 cm] and diffuse abdominal aortic aneurysms [3X5 cm]. Both patients performed standard left posterolateral thoracotomy. After the aneurysmal sac was mobilized, occluding vascular clamps were placed on the transverse aorta proximal to the origin of the left subclavian artery, and on the distal descending aorta without adjuvant bypass procedures for 31 and 32 minutes, respectively, and the aneurysmal sac was repaired with 18 mm ringed Gore-Tex conduit graft. Both patients postoperative courses were uneventful.

  • PDF

저수지 제체월류 및 내부침식 보호기술 모형실험 연구 (An Experimental Study on Overflow and Internal Erosion Protection Technology of a Reservoir)

  • 김기환;이태호;유전용;임은상;이승주;김용성
    • 한국지반신소재학회논문집
    • /
    • 제18권4호
    • /
    • pp.181-191
    • /
    • 2019
  • 국내 저수지는 대부분 필댐으로 구성되고 있고, 필댐의 붕괴는 월류와 파이핑이 주된 원인으로 분석되고 있다. 본 연구에서는 원심모형실험기를 이용하여 실제 운영 중인 공주시 ◯◯ 저수지 축조 모형에 대하여 수위승강 시 및 월류 시 저수지의 거동 특성을 고찰하였다. 실제 저수지의 침투 및 월류 모사를 위해서 1/50로 축소한 모형에 파손 및 보강된 복통을 설치하고 제정 보강 및 미보강의 조건을 부여한 후 LVDT, 간극수압계를 설치하고 수위승강시험 및 월류시험을 수행하여 보강방법에 따른 제체의 거동 특성을 검토하였다. 원심모형실험 결과, 수위승강 시험에서 파손된 복통이 제체의 안정에 영향을 미칠 수 있는 것으로 나타났고 반전공법과 보강공법을 병행한 경우 제체의 침투 안정성을 확보할 수 있는 것으로 나타났다. 또한, 월류시험에서 월류유도 수로 설치 시 제체의 세굴과 토사의 유출을 방지할 수 있다는 것을 확인하였다. 본 연구를 통해 저수지 월류유도 수로 및 복통 보강공법 적용에 필요한 기초자료를 제공할 수 있을 것으로 판단된다.

변형 Fontan수술의 수술결과 및 장기결과에 미치는 영향에 관한 연구 (Factors influences on early and late results of modified fontan operation)

  • 장병철;박영환;조범구
    • Journal of Chest Surgery
    • /
    • 제19권4호
    • /
    • pp.569-577
    • /
    • 1986
  • Between October 1979 and June 1986, modified Fontan procedures have been performed on 22 patients by the Department of Thoracic and Cardiovascular Surgery, Yonsei University College of Medicine. Twelve patients had tricuspid atresia; one, congenital tricuspid stenosis; five, single ventricle; two, I-transposition of the great vessels; one, double outlet right ventricle, and one, pulmonary atresia with an intact ventricular septum. There were 9 operative deaths [mortality; 40.9%]. The causes of death were right heart failure in six patients and pulmonary venous hypertension in one who misdiagnosed preoperatively. Another two were deceased due to sepsis and cerebrovascular accident at postoperative 35 and 34 days in each. There were 7 patients below 4 years of age at the time of operation and among them 4 patients were deceased. The operative death was not related with patients` age above and below 4[p=0.211]. The relation between operative death of tricuspid anomaly and another cardiac malformations was statistically significant [p=0.048]. The operative procedures with or without valved conduit [woven dacron] was related significantly [p=0.043] in the case of the 21 of the patients, but the modified Fontan operation with a valved conduit was performed early stage in this series. Since 1982, we operated on 4 patients, doing a right atrium-right ventricle anastomosis without a conduit. All survived and remained in functional class I [NYHA]. The right atrial pressure [RAP] was elevated significantly after operation [mean 9.9$\pm$4.8 ~16.9$\pm$3.6 mmHg, p<0.001]. The relation between the postoperative RAP of the survival group [16.5$\pm$4.3 mmHg] and the group who died [17.4$\pm$2.2 mmHg] was statistically significant [p=0.047]. There was no relation between any operative death and any previous palliation. All patients were followed for 4 months to 80 months, except one who was lost to follow up at 2 months following surgery [mean 11.4 months, 238 patient. months]. All were in functional class I with 5 on medications and 7 not. One was reoperated at 70 months following the first operation, due to conduit stenosis. She was moderately impaired in activity, with hepatomegaly after the second operation.

  • PDF

되메움재 특성을 고려한 전력구 열환경 변화 예측 수치해석모델 개발 (Development of numerical model for estimating thermal environment of underground power conduit considering characteristics of backfill materials)

  • 김경훈;박상우;김민주;이대수;최항석
    • 한국터널지하공간학회 논문집
    • /
    • 제19권2호
    • /
    • pp.121-141
    • /
    • 2017
  • 최근 전력구 지중 송전선의 허용 전류용량에 대한 정부규제로 인해 전력구 공사에 현장 되메움재의 열적 거동에 대한 연구가 중요해졌다. 점차 증대되는 고용량 전력공급에 대한 수요와 더불어, 허용 전류용량을 산정하기 위해, 전력 케이블 주변 온도 증가를 유발하는 요인을 예측하고 분석하는 것이 시급하다. 전력구 내부의 과도한 열확산으로 인한 지중 송전선로 주변의 온도 증가는 지중 송전선 자체의 열저항을 증가시켜 절연 파괴 및 열 폭주 현상을 야기한다. 따라서 전력구 설계 및 시공시, 되메움재에 따른 전력구 현장 열거동 메커니즘을 규명하는 것이 매우 중요하다. 본 논문에서는 현장 시험시공을 기반으로, 전력구내부와 주변지반의 온도 변화 및 열저항을 산정하기 위한 수치해석 모델을 개발하였다. 전력구 열거동 파악을 위한 수치해석은 현장시험 시공시 획득한 4개의 다른 종류의 되메움재의 열적 그리고 물리적 물성치를 기반으로 수행되었다. 또한, 실내 시험을 통해 산정한 각 되메움재의 열저항을 수치해석 모델에 입력변수로 적용했다. 전력구 내부에 일정한 열량이 공급될 때, 되메움재의 단위중량, 함수비, 열적 특성 등 여러 변수를 고려한 열거동 메카니즘을 모사할 수 있도록 열거동 수치해석 모델을 구성하고 1년 동안의 수행된 현장계측값과 비교를 통하여 개발된 수치해석 모델을 검증하였다.