• Title/Summary/Keyword: Concrete small dam

Search Result 14, Processing Time 0.025 seconds

Automatic crack detection of dam concrete structures based on deep learning

  • Zongjie Lv;Jinzhang Tian;Yantao Zhu;Yangtao Li
    • Computers and Concrete
    • /
    • v.32 no.6
    • /
    • pp.615-623
    • /
    • 2023
  • Crack detection is an essential method to ensure the safety of dam concrete structures. Low-quality crack images of dam concrete structures limit the application of neural network methods in crack detection. This research proposes a modified attentional mechanism model to reduce the disturbance caused by uneven light, shadow, and water spots in crack images. Also, the focal loss function solves the small ratio of crack information. The dataset collects from the network, laboratory and actual inspection dataset of dam concrete structures. This research proposes a novel method for crack detection of dam concrete structures based on the U-Net neural network, namely AF-UNet. A mutual comparison of OTSU, Canny, region growing, DeepLab V3+, SegFormer, U-Net, and AF-UNet (proposed) verified the detection accuracy. A binocular camera detects cracks in the experimental scene. The smallest measurement width of the system is 0.27 mm. The potential goal is to achieve real-time detection and localization of cracks in dam concrete structures.

A Case Study on the Leakage in Concrete Face Rockfill Dam (콘크리트 표면차수벽형 석괴댐(CFRD)의 누수특성에 관한 사례연구)

  • 방돈석;신창건;이강용;안상로
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.197-202
    • /
    • 2003
  • The leakage quantity through concrete facing of Concrete Face Rockfill Dam(CFRD) is very small due to its low permeability of intact concrete. Even though the concrete facing is well designed and constructed, fine cracks can be generated due to effects of thermal and drying shrinkage. Therefore, it can be said that the leakage from the CFRD is subjected to not permeability of intact concrete but poor joints, cracks and foundation rocks. The Safety of a dam on leakage was evaluated based on the comparison between apparent permeability estimated and leakage quantity measured. The above method can be concluded to give a good direction for the evaluation of safety on CFRD in maintenance aspects as design and construction technology is improved with the accumulation of leakage data.

  • PDF

Analysis of Fluid-Structure Interaction for Development of Korean Inflatable Rubber Dams for Small Hydropower (소수력 발전용 한국형 공기주입식 고무댐 개발을 위한 유체-구조 연성 해석)

  • Hwang, Tae-Gyu;Kim, Jin-Gu
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.8
    • /
    • pp.1221-1230
    • /
    • 2008
  • Inflatable rubber dams are used for controlling flood, impounding water for recreations, preventing beach erosions, diverting water for irrigations, and generating hydropower. They are long, flexible, inflated with air, cylindrical structures on a rigid horizontal foundation such as concrete. The dam is modeled as an elastic shell inflated with air. The mechanical behaviors of the inflated dam model were investigated by using the finite element method. The analysis process such as One Way Coupling Fluid-Structure Interaction consists of two steps. First, the influences of the fluid side were investigated, viz, the shape changes of the inflated rubber dam due to the fluid motions was captured when the height of the dam was 30cm with air pressure 0.01MPa, at which the pressure distributions over the surface of the dam were calculated. And next, the structural deformations were calculated using the pressure distributions. The initial inlet velocity for flow field was set to 0.1m/s. The structural deformation behaviors were investigated. The final research goal is to develop a Korean Inflatable Rubber Dam to be used for generating small hydropower.

Numerical simulation of shaking table test on concrete gravity dam using plastic damage model

  • Phansri, B.;Charoenwongmit, S.;Warnitchai, P.;Shin, D.H.;Park, K.H.
    • Structural Engineering and Mechanics
    • /
    • v.36 no.4
    • /
    • pp.481-497
    • /
    • 2010
  • The shaking table tests were conducted on two small-scale models (Model 1 and Model 2) to examine the earthquake-induced damage of a concrete gravity dam, which has been planned for the construction with the recommendation of the peak ground acceleration of the maximum credible earthquake of 0.42 g. This study deals with the numerical simulation of shaking table tests for two smallscale dam models. The plastic damage constitutive model is used to simulate the crack/damage behavior of the bentonite-concrete mixture material. The numerical results of the maximum failure acceleration and the crack/damage propagation are compared with experimental results. Numerical results of Model 1 showed similar crack/damage propagation pattern with experimental results, while for Model 2 the similar pattern was obtained by considering the modulus of elasticity of the first and second natural frequencies. The crack/damage initiated at the changing point in the downstream side and then propagated toward the upstream side. Crack/damage accumulation occurred in the neck area at acceleration amplitudes of around 0.55 g~0.60 g and 0.65 g~0.675 g for Model 1 and Model 2, respectively.

The design of coffer dam utilized P.R.D. method (P.R.D. 공법을 활용한 가물막이 설계)

  • Park, Chal-Sook;Lee, Kyu-Tak;Yum, Kyung-Taek;Kim, Yoon-Ku;Kang, Bong-Gwon;Lee, Jae-Weon;Lim, Seok-San;Jeong, Ji-Yearl
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.869-887
    • /
    • 2008
  • Coffer dam for tunnel type spillway in inflow section of Dae-am dam was originally planned as 2 lines sheet piles with Water Zet method. But, the result of pilot test was caused of some problems that vibration during installation of pile could pollute water and water leakage could the lower part. So, sheet piles was not satisfactory for faculty of coffer dam. Structural instability of sheet pile system need to reinforcement. Characteristic of Dae-am dam was small reservoir capacity but wide drainage area, of which it was judgment that security of leakage and stability was difficult during excavation of inlet part. So, we consider that water curtain method utilized with in site pouring concrete pile method was designed at weir part of spillway. We were known about basement rock that geological boring was carried out in weir part. After taking a deep consideration, PRD method was accepted as a new method. Concrete pile by PRD was installed to below country rock. CJM method was carried out with PRD. After making concrete wall using Top-down method, earth anchors were installed for supporting it. According to the result of numerical analysis, as water level rises, wall is stable.

  • PDF

Dilemma of a small dam with large basin area under climate change condition

  • Jeong-Hyeok Ma;Chulsang Yoo;Tae-Sup Yun;Dongwhi Jung
    • Computers and Concrete
    • /
    • v.33 no.5
    • /
    • pp.559-572
    • /
    • 2024
  • Problems of under-sized dams (small dams with large basin area) could get worse under the global warming condition. This study evaluates the possible change of these problems with the Namgang Dam, an under-sized dam in Korea. For this purpose, first, this study simulates the dam inflow data using a rainfall-runoff model, which are then used as input for the reservoir operation. As a result, daily dam storage, dam release, and dam water supply are derived and compared for both past observed period (1973~2022) and future simulated period (2006~2099) based on the global warming scenarios. Summarizing the results are as follows. First, the inflow rate in the future is expected to be increased significantly. The maximum inflow could be twice of that observed in the past. As a result, it is also expected that the frequency of the water level reaching the high level is increasing. Also, the amount and frequency of dam release are to be increased in the future period. More seriously, this increase is expected to be concentrated on rather extreme cases with large dam release volume. Simply, the condition for flood protection in the downstream of the Namgang Dam is becoming worse and worse. Ironically, the severity of water shortage problem is also expected to become much worse. As the most extreme case, the frequency of no water supply was zero in the observed period, but in the future period, it becomes once every five years. Both the maximum consecutive shortage days and the total shortage volume are expected to become more than twice in the future period. To prevent or mitigate this coming problem of an under-sized dam, the only countermeasure at this moment seems to be its redevelopment. Simply a bigger dam with larger dam reservoir can handle this adverse effect more easily.

Long-term Performance of Secondary dam Installed for Water Purification of Reservoir (호소의 수질개선을 위하여 설치한 부댐의 장기간 성능평가)

  • Kim, Bong-Kyun;Park, Jun-Seok;Won, Hee-Jae;Kim, Yun-Yung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.668-676
    • /
    • 2018
  • Most reservoirs in Korea have a low water depth and are small in size. Water pollution of the reservoir is serious because of the organic matter flowing from livestock wastewater, domestic sewage, and farmland. In this study, an attempt was made to improve the water purification effect by replacing the secondary dam installed in the depression area of the agricultural reservoir with the riprap dam. To evaluate the long-term performance, a riprap dam was installed in a reservoir in Gyeonggi province and water purification effect for 36 months was measured. The field test results showed that COD was 14.6%, SS 38.6%, T-N 9.5%, and T-P 11.2%. The concentrations in the influent water exhibited a significant change according to season, and the water purification effect increased with increasing concentration of influent water. The pollutant flowing into the lake from the depression area can be blocked effectively if the secondary riprap dam for water purification is installed in the agricultural reservoir.

Threshold Condition for Exclusion of Riprap into Bypass Pipe (저층수 배출관에 유입된 사석의 배제 한계조건)

  • Jeong, Seokil;Lee, Seung Oh
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.1
    • /
    • pp.57-66
    • /
    • 2019
  • One of the most serious problems with concrete small dams or barriers installed in small/median rivers is the deposit of sediments, especially, in Korea. An effective way to discharge such sediments to downstream is to construct a bypass pipe under the river bed. However, efficiency may become lowered if ripraps are entered into the bypass pipe. Therefore, in this study, we derived the threshold condition for the exclusion of ripraps from the bypass pipe using 3D numerical analysis. Upstream flow of the small dam was assumed to be stationary, and the energy concept was applied to the control volume containing the bypass pipe and its periphery. As a result, when the ratio of the water level difference between upstream and downstream to the diameter of the riprap was approximately equal to 1.2, the threshold condition for exclusion of the stones or riprap from the bypass pipe was affirmatively determined. If the characteristics of the adsorptive sediment adversely affecting the river environment in the future would be taken into account, results from this study are expected to put to practical use in the management of concrete small dam with bypass pipe system.

Estimating of water pressure to avoid hydraulic fracturing in water pressure test

  • Amnieh, Hassan Bakhshandeh;Masoudi, Majid
    • Computers and Concrete
    • /
    • v.19 no.2
    • /
    • pp.171-177
    • /
    • 2017
  • Water pressure test operation is used before the grouting to determine the rate of penetrability, the necessity and estimations related to grouting, by the penetration of water into the borehole. One of the parameters which have the highest effect is pressure of water penetration since the application of excessive pressure causes the hydraulic fracture to occur in the rock mass, and on the other hand, it must not be so small that prevents from seeing mechanical weaknesses and the rate of permeability. Mathematical modeling is used for the first time in this study to determine the optimum pressure. Thus, the joints that exist in the rock mass are simulated using cylindrical shell model. The joint surroundings are also modeled through Pasternak environment. To obtain equations governing the joints and the surroundings, energy method is used accompanied by Hamilton principle and an analytical solution method is used to obtain the maximum pressure. In order to validate the modeling, the pressure values obtained by the model were used in the sites of Seymareh and Aghbolagh dams and the relative error rates were measured considering the differences between calculated and actual pressures. Modeling in the sections of Seymareh dam showed 4.75, 3.93, 4.8 percent error rates and in the sections of Aghbolagh dam it rendered the values of 22.43, 5.22, 2.6 percent. The results indicate that this modeling can be used to estimate the amount of pressure for hydraulic fracture in water pressure test, to predict it and to prevent it.

Experimental Study of Collapse Delay Effect of Riprap on Dam Slope (사력댐 사석 보호공의 붕괴 지연 효과에 대한 실험 연구)

  • Jeong, Seokil;Kim, Seung Wook;Kim, Hong Taek;Lee, Seung Oh
    • Journal of Korean Society of Disaster and Security
    • /
    • v.11 no.1
    • /
    • pp.31-38
    • /
    • 2018
  • The 99.1% of small dam and most of the levees in Korea are soil dam which can be constructed with lower cost and less effort compared with ones made of concrete. However, they are so vulnerable to overflow. Sudden collapses of these strucrues lead to increase flow rate rapidly, which may cause catastrophic problems in downstream regions. In this study, the experimental study on the collapse delay effect of riprap that was laid on slope of soil levee was carried out. A prismatic rectangular open channel was used and three different sizes of the riprap were installed on slope of a scaled earth dam. A new formula for the collapse time of the levee with the installation of riprap was presented, using the previous researches and the dimensional analysis. In this process, an unsteady flow condition was considered to derive the deviation time of the riprap. And additional experiments were conducted to understand the effect of reinforcement of riprap, and it was found that the reinforcement of riprap was more effective than twice sizing of intial riprap. If the collapse time is delayed, EAP (Emergency Action Plan) and forecasting can greatly reduce the degree of flood damage. Also, it will be meaningful that the results of this study are used for river design.