A Method for the Analysis of Train/Slab-Track Interaction on Settled Roadbed (슬래브궤도 노반침하구간 차량/궤도 상호작용 해석기법 개발)

  • Yang, Sin-Chu;Hong, Chul-Kee
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.296-305
    • /
    • 2007
  • A numerical method for the analysis of train/slab-track interaction on the settled roadbed is developed based on the already developed analysis method of train/ballast-track interaction. The concrete slabs composed of the upper track concrete layer and the lower hydraulic bonded layer are modelled by a equivalent beam. The supporting stiffness of roadbed is evaluated with the modified boussinesq method suggested by Eisenmann. The track irregularity and the gap between slab and roadbed induced by settlement of roadbed are calculated by the effective method newly presented in this study. The validation of the developed method is investigated by a numerical example. The effects of train speed on train and slab track on the settled roadbed with sinusoidal shape of wave length 20m and amplitude 20mm are reviewed.

Experimental Investigation on Fatigue Behavior of Concrete Slab Tracks under Railway Loads (철도하중에 대한 콘크리트 슬래브궤도의 피로거동에 관한 실험적 연구)

  • 강보순
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.639-642
    • /
    • 2003
  • In this paper, fatigue behavior of concrete slab tracks under railway loads by experimental method is discussed. The addition of steel fibers to concrete mix has been receiving more attention as a way of improving the crack behavior of concrete beams an slabs tacks. This study two objectives: 1) to observe the fatigue behavior of fiber reinforced concrete slab in labor, and 2) to present crack propagation and deflection of fiber reinforced concrete slab track under railway loads in the Waghauser test line. Nine beams, two slabs and one test track were experimentally tested.

  • PDF

Analysis of the Relationship between Concrete Slab Track Life and Secondary Compression Characteristics in Soft Clay (점토의 2차 압축특성과 콘크리트궤도 수명과의 상관성 분석)

  • Lee, Sang-Cheol;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.195-203
    • /
    • 2016
  • Concrete slab track was applied to the Gyeoungbu High Speed Railroad step 2 and the Honam High Speed Railroad. Concrete slab track incurs higher construction cost and lower maintenance cost than existing gravel track. For these reasons, the use of concrete slab track has increased in Korea. The biggest problem in the use of concrete slab track is repairing damage from settlement that can occur while trains are in service. High speed railroad design standards require allowable residual settlement of concrete slab track of less than 25mm. In order to satisfy the requirement of long term stability of concrete slab track, it is necessary to manage the secondary compression settlement within the allowable residual settlement. This study is to evaluate the secondary compression settlement with the variation of the secondary compression index, thickness of soft ground, and concrete slab track life. Statistical analysis is performed to determine the probability of distribution of areas where serious problems will be caused after the concrete slab track is constructed.

A Study on the Optimum Stiffness of Concrete Slab Track (콘크리트 궤도의 최적 탄성에 관한 연구)

  • Kong, Sun-Yong;Kim, Sang-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1085-1090
    • /
    • 2007
  • In recent railway construction, the concrete slab track is getting highlighted as main stream in track type. However, it is the fact that there are different opinions in selection of the optimized spring coefficient of elastic pad. In this study, the performance of vibration reduction in different stiffness of rail pad for ballasted track was compared, and the changes in characteristics, such as static/dynamic deflection of components, vibration acceleration, insertion loss etc., were analysed by using ISI Program for various types of rail fastening system used in concrete slab track. It was concluded that the fastening system with softer pads has shown the better performance of vibration reduction in concrete slab track and the optimized static stiffness has been calculated to 21.1kN/mm for conventional railways, 17.6kN/mm for high-speed railways and 17.8kN/mm for subways.

  • PDF

A study on surface resistivity of GFRP reinforced precast slab track (유리섬유보강 슬래브의 표면저항특성 고찰)

  • Moon, Do-Young;Zi, Goang-Seup;Lee, Seung-Jung;Kim, Yoo-Bong;Baek, In-Hyuk
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2435-2438
    • /
    • 2011
  • Steel bar is used for as a reinforcing material in a concrete slab track. Bacuase the steel re-bar could provide passes for current transition, all the cross points of steel re-bars should be insulated by using plastic materials. This is due to the loss of signal intensity of track-circuit. In this study, GFRP bars are adopted in place of the traditional steel reinforcing bars for a concrete slab track to minimize the loss of the signal intensity. In order to evaluate the replacing effect on eletrical characteristic of slab track, measurements of surface resistivity are conducted on steel and GFRP reinforced precast slab tracks. In the results, the GFRP reinforced slab strack shows the higher resistivity than the steel reinforced slab track.

  • PDF

Evaluation of Vibration and Noise character on the Floating Slab Track (부유궤도의 진동$\cdot$소음 특성 평가)

  • Hun Young;Lee sang jin;Kim gi hun;Lee in se
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.343-348
    • /
    • 2003
  • As one of countermeasures for vibration and noise source which come from train operation in subway system, the heavy-weighted tunnel structure and the low-vibration track design have been adopted. In recent the low-vibration concrete track have been constructed to enhance the maintenance effectiveness as well as the reduction of vibration. This paper is explaining and evaluating of the characteristics of vibration and its effects comparing to tile ballast track, concrete track, and full surface supported floating slab track installed on Express bus terminal in Seoul subway No. 7 line.

  • PDF

Analysis of Behavior of Train and Track at Transition Zone between Floating Slab Track and Conventional Concrete Slab Track (플로팅 슬래브궤도와 일반 콘크리트궤도 접속부에서의 열차 및 궤도의 거동 분석)

  • Jang, Seung-Yup;Yang, Sin-Chu;Park, Man-Ho;Joh, Su-Ik
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.379-384
    • /
    • 2009
  • It is of great importance to assure the running safety and ride comfort in designing the floating slab track for the mitigation of train-induced vibration. In this paper, for this, analyzed are the system requirements for the running safety and ride comfort, and then, the behavior of train and track at the transition zone between the floating slab track and the conventional concrete slab track according to several main design variables such as spring constant, damping coefficient, spacing and arrangement of isolators and slab length, using the dynamic analysis technique considering the train-track interaction. The results of numerical analysis demonstrate that the discontinuity of the support stiffness at the transition results in a drastic increase of the vertical vibration acceleration of the train body, wheel-rail interaction force, rail bending stress and uplift force. The increase becomes higher with the decrease of the spring constant of isolators and the increase of the isolator spacing, but the damping ratio does not significantly affect the behavior of train and track at the transition. Therefore, to assure the running safety and ride comfort, simultaneously increasing the effectiveness of vibration isolation, it is effective to minimize the relative vertical offset between the floating slab and the conventional track slab by adjusting the spring constant and spacing of isolators at the transition.

  • PDF

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Kwon, Jae-Wook;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1169-1177
    • /
    • 2008
  • The system of the railway signaling using the track transmits the approved speed to the location of a train and it. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

  • PDF

The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track (콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구)

  • Sung, Deok-Yong;Kim, Young-Ha;Park, Yong-Gul;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF

A Study to select the optimum size for the panel of the precast slab track system (프리캐스트 슬래브궤도 패널의 최적규격 선정을 위한 연구)

  • Kim, Yoo-Bong;Moon, Do-Young;Beak, In-Hyuk
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.740-744
    • /
    • 2011
  • Precast slab track system(PSTS) is a concrete track laying system where the slab panels are pre-manufactured in factories and assembled and installed on-site. PSTS has been developed for the past 30 years in countries where railway technologies are advanced such as Japan and Germany to improve the various drawbacks of the in-situ concrete slab track. However, the usefulness of PSTS is being continuously approved by many other countries such as China, Taiwan, Austria, Italy, Spain, etc,. Lately, not only Japan and Germany, but also Austria, Italy and China have developed their own PSTS by collaboration between their Governments and private enterprises and are now attempting to expand their businesse soverseas. In accordance to such movement, in 2006, the Korean Railroad Research Institution and Sampyo E&C have developed a Korean PSTS by joint research. PSTS consists of concrete panel, under pouring layer and concrete base layer. Amongst these components, the panel is the main component of PSTS which supports the train load and has a great effect on the track quality, workability and economics. Therefore, a study is to be conducted to select the optimum size for the Panel of the precast slab track system panel by analyzing the various standards & forms, interpretation of finite elements of the selected model and economical analysis.