• Title/Summary/Keyword: Concrete Railway Bridge

Search Result 210, Processing Time 0.028 seconds

Paris Rive Gauche Project: (Re)developping the City on the City

  • Ernek, Benoit
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.123-129
    • /
    • 2014
  • Paris hasn't experienced such excitement since the huge changes brought about by Baron Haussmann in the 19th century. Paris Rive Gauche project, started in 1991, is the largest urban project in city ever since, it represents about 1% of Paris territory. It takes place on a workshops, factories and warehouses area that prospered along the Seine river and the railways in the 19th century. Originally planned as a business quarter, Paris Rive Gauche, developed by SEMAPA for the City of Paris, fosters urban diversity through housing, offices, public facilities, shops, creating a stimulating neighbourhood where 18,000 residents, 30,000 students as well as 60,000 employees will soon croth paths. This project's main principles are urban and social diversity, deployment of public facilites, the development of new university campus inside the city, promotion of industrial patrimony and connecting the old 13th distict to the river and the opposite side. Half of the project is going to be built on a concrete slab that covers the railway tracks which is one of the major performances of this long-term project. This concrete slab represents the new level of the City, about 6 to 8 meters above the railway tracks. We distinguish three families of buildings on the cover : Classic buildings; Bridges buildings and Connection buildings, these last guarantee the linkage between old and new level of the City.

Safety Assessment of RC Pier Coping According to Modification of Rebar Arrangement (RC교각 코핑부 배근방법에 따른 안전성 평가)

  • Park, Bong-Sik;Park, Sung-Hyun;Shin, Wang-Su;Cho, Jae-Yeol
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1519-1525
    • /
    • 2011
  • Construction of the coping of reinforced concrete piers is very complicated due to heavy density of rebars and usually exposed to negligent accident. To correct these problems, coping is pre-assembled at the ground in pier coping pre-assembly method and recently a new method of rebar assembling has proposed in this study. For safety assessment of proposed method, small scale model test of railway bridge(PSC U-GIRDER T-shaped pier) was carried out and it was verified that crack pattern, failure mechanism and load resistance capacity are similar between existing method and proposed method. And using analytical approach, linear and non-linear finite element analysis was performed. As a result, it was checked that proposed method has an acceptable structural safety.

  • PDF

A Study on the Anti-Vibration Characteristics of the Under Sleeper Pad (방진침목패드의 방진특성에 관한 연구)

  • 황선근;엄기영;고태훈;오상덕
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.369-374
    • /
    • 2001
  • It was estimated that the anti-vibration measures at the source location of railroad are the most active and effective ones. Among CWR(Continuously Welded Rail), elastic rail fastener, floating slab, ballast mat, under sleeper pad, etc. like these various kinds of measures in the source, under sleeper pad as an anti-vibration measure was constructed at the railroad track supporting structures in the Jeon-la Line. In this study, through the field measurement of vibration at the railroad track supporting structures and nearby the ground, the vibration reduction effect of under sleeper pad were evaluated by insertion loss. As a result, vibration reduction effects were 5.0∼12.5㏈ on the concrete slab of the bridge, 3.9∼7.5㏈ on the ground nearby the bridge respectively.

  • PDF

Seismic Risk Analysis of Track-on-Steel Plate Girder Railway Bridges (무도상 강판형 철도교의 지진 위험도 해석)

  • Park, Joo Nam;Choi, Eun Soo;Kim, Sung Il;Cho, Sung Cheol
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.1
    • /
    • pp.45-53
    • /
    • 2009
  • More than 40% of railway bridges on the conventional lines in Korea consist of track-on-steel plate girder (TOSPG) bridges. This type of bridge is typically designed without considering seismic loadings, as most of them were built before 1970. The seismic performance of this particular type of bridge could be upgraded through various seismic retrofit schemes, and seismic risk assessment could play a key role in decision-making on the level of the seismic retrofit. This study performed a seismic risk assessment of TOSPG bridges in Korea. The seismic damage of several crucial components of TOSPG bridges--fixed bearings, free bearings, and piers--were probabilistically estimated, and their seismic fragility curves were developed. The probability that the components would exceed their predefined limit states was also calculated by combining the fragility curves and the seismic hazard function. The analysis showed that the piers of TOSPG bridges, which are made of plain concrete without rebars, have relatively low risk against seismic loadings in Korea. This is because the mass of the superstructures of TOSPG bridges is relatively small, and hence, the seismic loading being transferred to the piers is minimal. The line-type bearings typically used for TOSPG bridges, however, are exposed to a degree of seismic risk. Among the bearings, the probability of the free-end bearings and the fixed-end bearings exceeding the slight damage state in 50 years was found to be 12.78% and 4.23%, respectively. The gap between these probability values lessened towards more serious damage states. This study could effectively provide an engineering background for decision-making activities on the seismic retrofit of railway bridges.

An Experimental Study on the Longitudinal Resistance Behavior of an Existing Ballastless Steel Plate Girder Bridge (기존 무도상 판형교 궤도의 종저항거동에 대한 실험)

  • Kim, Kyoungho;Hwang, Inyoung;Baek, Inchul;Choi, Sanghyun
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.327-337
    • /
    • 2018
  • Since the track of the ballastless steel plate girder bridge is connected to a main girder without a deck and a ballast, the impact generated by train passage is transferred directly to bridge main members, and it can cause frequent damage of the bridge as well as higher noise and vibration level. Applying the CWR (Continuously Welded Rail) technology can reduce this structural problems, and, to this end, it is necessary to understand the characteristics of factors influencing vehicle-track or track-bridge interaction. In this paper, experimental study results are presented for examining the longitudinal resistance characteristics of the track, including a rail fastener, a sleeper fastener, and a track skeleton, installed on a ballastless steel plate girder bridge. The experiment is conducted using a disposed bridge from service, which is transported to a laboratory. The experimental results show that the rail fastener satisfies the performance criteria of the longitudinal resistance presented in KRS TR 0014-15, and the longitudinal resistance of old and new type sleeper fasteners is higher than the values provided in the existing research. Also, the unloaded longitudinal resistance of the ballastless track is between the ballast and the concrete tracks.

Precast Concrete Guideway of Automated Guideway Transit with Rubber Tire. (경량전철 고무차륜용 PC슬레브 궤도)

  • 조능호;정원기;이규정;윤태양;이안호
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.295-302
    • /
    • 2000
  • Slab guideway, surface treatment, heat line installation, and joint connection for Automated Guideway Transit with rubber tire are researched. While the AGT with rubber tire is constructed in city, the precast slab guideway must be considered a reduction of the construction period and the noise under construction. which related with environment. To do that, a basic design and the structural analysis for the precast slab guideway with rubber tire are studied. The surface treatment and the heat line installation of that are also compared with currently used methods. Tining method is applied to the surface treatment adopted from the concrete pavement application currently in use. The connection method between the slab of bridge and precast guideway are suggested with a bolt type and a bond type. To minimize noise and vibration of the connection while the AGT is in driving, the slop connection method can be enhanced the serviceability.

  • PDF

Elastic Buckling Characteristics of Plate Girder Web Panel (경량전철 2주형 판형교 복부판의 탄성좌굴 특성)

  • 황민오;성택룡;윤태양;이안호
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.344-351
    • /
    • 2000
  • In the design of plate girder web panels, it is required to evaluate accurately the elastic buckling strength under pure shear, pure bending and combined bending and shear. Currently, elastic buckling coefficients of web panels stiffened by transverse intermediate stiffeners are determined by assuming conservatively that web panels are simply supported at the juncture between the flange and web. However, depending upon the geometry and the properties of the plate girder bridge, upper juncture between the flange and web can be assumed as fixed because concrete deck prevents the rotational displacement of upper flange. In the present study, a series of numerical analyses based on finite element modeling is carried out to investigate the effects of the concrete deck, and the resulting data are quantified in simple equations.

  • PDF

Analytical Studies on Shape of Shear Pocket of Full-Depth Precast Slab (프리캐스트 바닥판의 전단포켓 형상에 관한 해석 연구)

  • Han Sang-Yun;Lee Man-Sup;Lee Seong-Rok;Song Jae-Joon;Kang Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1119-1124
    • /
    • 2004
  • Full depth precast concrete bridge deck system can be advantageously to reduce construction time, hence lowering the cost. This system has several significant design and construction component. To connect between the concrete slab and steel girder, precast deck has shear pocket. Post-tensioning tightens the joints and prevents any leakage though the joint. When post-tensioning is applied, stress concentration occurs in the edge of shear pocket. In this study, precast decks using four types of shear pocket is analyzed by F.E.M.

  • PDF

Durability Evaluation and Defect Pattern Analysis in Railway Bridge Through Field Investigation (현장조사를 통한 철도 고가교 구조물의 내구성 평가 및 결함 패턴 분석)

  • Kwon, Seung Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.1
    • /
    • pp.10-20
    • /
    • 2013
  • Because of the defect in design, damage in using period, and deterioration in long term exposure to severe environmental condition, degradation of performance in RC (Reinforced Concrete) structures has occurred. This paper contains durability performance evaluation in railway bridges which covers eight districts through field investigation. For the target structures, durability performance is evaluated and the critical problems in use are derived. Additionally, service lifes for the deteriorated structures are evaluated through Durability-Environment index method based on the results from field investigation, and the results are compared with those from the condition assuming the structures without defect, damage, and deterioration. The target structures which consist of RC T girder, PSC girder, RC box, and Rahmen are investigated and the critical damage patterns are derived. They are evaluated to be cracks in PSC girder end, flexural cracks in PSC girder, crack around EPT anchor, and flexural cracks in RC T girder and RC box. The reasons for the critical patterns are also investigated. This study can be utilized for the repair planning considering the different district and the structure types.

Verified 20-car Model of High-speed Train for Dynamic Response Analysis of Railway Bridges (검증된 고속철도 차량의 20량편성 정밀모형에 의한 철도교량의 동적응답 분석)

  • 최성락;이용선;김상효;김병석
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.15 no.4
    • /
    • pp.693-702
    • /
    • 2002
  • The aim of this study is to develop a 3-dimensional dynamic analysis model, capable of considering the interaction between vehicles and bridges more accurately. The dynamic analysis model is developed with the high-speed train (KTX) and a 2-span continuous prestressed concrete box girder bridge with a double track. The 20-car model is developed using the moving vehicle model for the regular trainset. Three-dimensional frame elements are used for the bridge model. Using the developed models, a dynamic behavior analysis program is coded. The analytical results are compared with the dynamic field test results and found to be valid to yield quite accurate dynamic responses. Based on the results of this study, the hybrid model, made up of the moving vehicle model for the heaviest power car and the moving force model for the other cars, is quite simple and effective without loosing the accuracy that much. Under the coincidence condition of two trains traveling with resonance velocity in the opposite directions, it is necessary to check not only the dynamic responses of the bridge with one-way traffic but those with two- way coincidence.