Journal of the Computational Structural Engineering Institute of Korea
/
v.30
no.3
/
pp.231-238
/
2017
Using 3D based BIM(Building Information Modeling) enables a variety of construction simulations. The is no case to simulate BIM demonstration experiment on deeply immersed virtual reality environment in korea. This paper develops a multi screen based simulation system to enable 3D based immersed environment to diverse decision making and virtual construction simulation. In a developed simulation laboratory, we can carry out BIM drawing review, disaster evacuation simulation, constructability review on wild land and design urban planning using haptic device on 3-side space with 4K resolution . Also, It can review large amount of drawings without data conversion because of compatibility with BIM software.
Proceedings of the Computational Structural Engineering Institute Conference
/
2010.04a
/
pp.369-374
/
2010
최근 건설 산업에서 BIM이 각광 받으면서, BIM 기반의 다양한 엔지니어링 기술 도입 및 프로세스 적용이 시도 되고 있다. 이중 BIM 기반의 프로젝트 운영을 위해서는 BIM의 데이터의 저장, 수정, 배포뿐만 아니라, 관련 주체간의 협업이 가능한 환경이 요구되고 있으며, 이러한 환경 구축을 위해 제조업에서 활용되고 있는 PDM(Project Data Management) 또는 PLM (Product Life-cycle Management) 시스템을 벤치마킹한 CPLM (Construction Project Life-cycle Management)과 같은 BIM 기반 협업 시스템이 등장하고 있다. 하지만 기존의 이러한 협업 시스템의 경우, 건설 프로젝트가 가지는 다양한 계약 방식, 관리 단계, 관련 정보의 체계 등에 대한 종합적 계획 없이 프로젝트의 각 참여 주체들의 기존 관리 방식을 도입함으로써, 당초 BIM 기술을 도입하여 달성하고자 하는 원활한 협업 환경을 구축하는데 한계를 가지고 있다. 따라서 본 연구에서는 최근 BIM 가이드라인의 도입 등에서 시도되고 있는 BIM Planning이라는 개념을 활용하여, BIM 기반 협업 시스템의 구축 이전에 BIM을 관리하기 위한 관리 구조, 방식, 데이터 체계 등을 효과적으로 계획하고, 이를 시스템에 반영시킴으로써 보다 효과적인 BIM 기반 협업 환경이 구축될 수 있는 체계를 제안하였다.
Zabin, Asem;Khalil, Baha;Ali, Tarig;Abdalla, Jamal A.;Elaksher, Ahmed
Advances in Computational Design
/
v.5
no.2
/
pp.127-146
/
2020
Building Information Modeling (BIM) is increasingly used throughout the facility's life cycle for various applications, such as design, construction, facility management, and maintenance. For existing buildings, the geometry of as-built BIM is often constructed using dense, three dimensional (3D) point clouds data obtained with laser scanners. Traditionally, as-built BIM systems do not contain the material and textural information of the buildings' elements. This paper presents a semi-automatic method for generation of material and texture rich as-built BIM. The method captures and integrates material and textural information of building elements into as-built BIM using thermal infrared sensing (TIS). The proposed method uses TIS to capture thermal images of the interior walls of an existing building. These images are then processed to extract the interior walls using a segmentation algorithm. The digital numbers in the resulted images are then transformed into radiance values that represent the emitted thermal infrared radiation. Machine learning techniques are then applied to build a correlation between the radiance values and the material type in each image. The radiance values were used to extract textural information from the images. The extracted textural and material information are then robustly integrated into the as-built BIM providing the data needed for the assessment of building conditions in general including energy efficiency, among others.
Proceedings of the Computational Structural Engineering Institute Conference
/
2011.04a
/
pp.91-94
/
2011
시설물 전생애주기에 걸쳐 정보가 공유되고 피드백 될 수 있는 BIM(Building Information Modeling) 기술의 등장은 유지보수 관리자들에게 가장 필요한 유지관리점검 도구의 의미를 지님과 동시에, 정보모델을 기반으로 주요 기술영역 및 사업주체간 원활한 의사소통이 가능해지도록 한다. 효율적인 지하철 터널의 유지관리를 위해서는 체계적으로 조직된 데이터가 필수적이다. 설계, 시공, 유지관리 단계별로 효과적인 협업을 위한 유기적인 단일 모델이 요구된다. BIM기반의 지하철 터널 구조물의 유지관리를 위해 건설정보분류체계 및 이를 보안한 유지관리점검 표준분류체계를 적용한 정보모델을 개발하였다.
Korean Journal of Computational Design and Engineering
/
v.21
no.3
/
pp.281-295
/
2016
Lately, the management of domestic BIM performance is quite lacking, as the evaluation and management data from successful cases of BIM implementation both on projects and in companies, and related effects (time, cost and other physical gains) are not well kept for future use in BIM development. In order to overcome the above obstacles, a systematic approach to evaluating BIM adoption with focus on particular elements like BIM implementation environment and processes, and the physical factors yielded by BIM, is necessary. In this study, objective and detailed assessment indicators and weights that are appropriate for the domestic situation were derived through research for purposes of developing a web-based BIM maturity measurement program that is tailor-made for the Korean construction atmosphere. Through a company's self-maturity measurement, excellent quality of BIM deliverables and output can be achieved and managed. Furthermore, the domestic BIM capacity can gradually increase since design firms' BIM capability can be judged during procurement basing on measurement indicators.
Proceedings of the Computational Structural Engineering Institute Conference
/
2009.04a
/
pp.344-347
/
2009
건축, 토목 분야의 정보 교환을 위한 표준으로 주목받고 있는 BIM 모델의 국제 표준인 IFC 표준을 위해, 소프트웨어가 IFC 표준에 맞게 유효한 정보를 입출력 하도록 도와주고, IFC 파일이 표준에 맞는지 검증할 수 있는 모듈을 개발했다. 특히, 지역별 및 국가별 상황에 맞게 BIM 모델을 수정하거나 확장해 사용하도록 권고하고 있는 상황에서 다양한 확장 IFC 표준을 효과적으로 지원할 수 있도록 IFC 표준을 정의하는 EXPRESS 언어로부터, 객체 지향 언어를 위한 소프트웨어 개발 라이브러리를 자동으로 생성하고, 해당 SDK를 활용해 IFC 모델을 검증하는 라이브러리를 자동으로 생성하며, IFC 파일을 검증할 수 있는 독립적인 실행 파일도 자동으로 생성할 수 있도록 했다. 또한 객체 지향 라이브러리를 사용함으로써 주어진 IFC 모델을 효과적으로 문서화 할 수 있도록 HTML 생성 도구를 개발하거나 3차원 형상 확인이 가능하도록 VRML 생성 도구를 개발하는 등의 작업이 쉽게 이뤄짐을 확인했다. 이렇게 자동화된 BIM 소프트웨어 개발 도구는 IFC 모델의 수정이나 확장을 고려하는 BIM 소프트웨어 개발 프로젝트의 생산성을 향상시키고, 해당 시스템의 운영에 신뢰도를 높이는 것은 물론이며, 향후 국내 실정에 맞게 운영될 BIM 인증 제도에도 활용하면 기존의 수작업 방식 인증제도에 비해 인증에 걸리는 시간과 비용을 줄이는 것은 물론 인증 자체의 객관성과 정확성, 투명성과 신뢰성을 높일 수 있을 것으로 기대된다.
Korean Journal of Computational Design and Engineering
/
v.21
no.3
/
pp.267-280
/
2016
In the construction industry, adoption of BIM is a global tendency whereas it doesn't seem to be fully activated in domestic market. Thus, the need of BIM ROI measurement is emerging. There has been a few researches which is only focused on evaluating achievement of BIM in constructional stage. However, it's hard to find any studies on the case of measurement of BIM ROI at the design phase. Therefore, this paper analyzes the domestic and external 12 advanced researches in the measurement of BIM ROI and suggests common investment and return facts. Based on this, this paper proposes a measuring method which is applicable in domestic architectural firms. To determine the appropriateness of the measure, there has been an expert survey and interview. According to the expert survey, the measure itself is practical. But in other survey targeting industry employee, actual profit and efficiency appear to be significantly different from previous expectations. In short, in the domestic conditions in the design stage, the introduction of BIM doesn't have a practical effect and this is one of the main reason why BIM can't be fully functional.
In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.
Korean Journal of Computational Design and Engineering
/
v.21
no.3
/
pp.252-266
/
2016
An architectural pre-design, which is conducted prior to the architecture design, supports fundamental configuration during the entire AEC project by predicting the cost, demand, etc., of the building, and is therefore gaining importance. In particular, the massing calculation of the pre-design phase should be prioritized, as it is fundamental to architectural outline. However, most architects depend on only their experience and intuition while conceptualizing an integrated framework of design conditions, including the building code and requirements for the massing calculation of the object. Therefore, many difficulties arise in terms of performing appropriate tasks. Thus, the purpose of this study is to implement a knowledge-based BIM for explicitly representing the design knowledge, which is the basis of decision making for an architect while performing the massing calculation. In particular, the 3D knowledge relevant to a project can be provided and accumulated in the massing calculation by the BIM system; this facilitates an integral understanding. Consequently, the approximate result of massing calculation in 3D BIM environment, through both the knowledge-based BIM template and plug-in, can be swiftly provided to the architect. In addition, the architect can invent various alternatives, estimate resulting costs, and reuse the accumulated knowledge in future BIM design processes.
Korean Journal of Computational Design and Engineering
/
v.19
no.4
/
pp.368-389
/
2014
There are many agendas and discussion subjects for BIM-based Criteria Design phase. At that time, some problems are occurred by software compatibility, simple repetitive tasks, rework caused by missing information etc. In this study, we focus on solving that problems by applying API(Application Programming Interface) method. For effective study, we construct Criteria Design process by using DSM (Dependency Structure Matrix) and study applicability of API. It will be effective for time-consuming task and simply labor-intensive tasks by applying API. we expect improving BIM-based Design Process and Data quality, work productivity without missing information and shapes for using API.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.