• 제목/요약/키워드: Compensation plan

검색결과 155건 처리시간 0.023초

공익사업시행(公益事業施行)으로 인한 어업(漁業)의 간접피해(間接被害) 보상액(補償額) 산출방법(算出方法)에 관(關)한 연구(硏究) (A Study on Calculation Method of Compensation for Indirect Damage of Fishery by Undertaking Public Project)

  • 김기대;김병호
    • 수산경영론집
    • /
    • 제37권1호
    • /
    • pp.25-44
    • /
    • 2006
  • Under the provision of Article 63 of the Enforcement Regulation of the Act on Acquisition and Compensation of Land and Others for Public Project that is recently enacted and implemented (hereinafter referred to as the 'Lend Compensation Act') the compensation is required to make 'When the Actual Damage Amount' is confirmed for the damage in fishery affairs that is outside of the public project area. The compensation for fishery business on the indirect damage area has been excluded from the advance compensation subject to conflict with the existing laws on fishery business compensation with the controversy in method, procedure, time and others to confirm the actual damage amount, and it lacks the standard of calculation for detailed compensation on partial damages outside of business implementation area, which caused the ceaseless conflicts and straggles between the project implementation party and the victimized fishermen regarding the calculation method of damages, standard, compensation period and others. In particular, from the numerous problems in damage compensation in fishery on the indirect damage area, the most recent problem emerged is the issue on application method of damage period in calculating the damage compensation amount that the struggle has been deepened with the differences between the project implementation party and the victimized fishermen without the stipulation on the compensation, that caused the difficulties in carrying out the public project and other serious social problems. In this study, the reasonable application method for the damage period and the calculation plan of the damage amount for calculating the damages on fishery industry outside of the public project implementation zone that is not fully specified under the Land Compensation Act, and the indirect damage area is not influenced for the notification of project recognition, and the compensation to undertake with the damage in the fishery industry in project implementation area to have the nature of damage compensation, the right to engage in fishery industry has the perpetual nature of rights, the fishery damage compensation system of Japan also recognizes the perpetual right on fishery industry to calculate the compensation amount, and the compensation for damage amount has been exercised for the period of actual damage occurrence period regardless of remaining effective period for most of fishery permit and license for fishery compensation outside of the project implementation area following the recent various public projects as well as the development process of theory on fishery loss compensation that the calculation of damage amount on the fishery industry outside of the project implementation zone would be prudent to compensate by calculating the applicable damages during the period of actual damages, and by doing so, the 'just compensation' guaranteed under the Constitution may be materialized. Therefore, the calculation of the damages from the implementation of the public project shall consider the actual period of damages and the degree of damage from the public project to calculate by the income capitalization method, however, considering the equitable consideration with the compensation following the cancellation, it shall not exceed the compensation following the termination of the applicable fishery businesses. Furthermore, the calculation method of partial damage amount on the fishery business following the project implementation shall apply, depending on the period of damage occurrence, by (1) the case of calculating the future damage amount at the present time, and (2) calculating the damage from the past to the present time as well as the damage to be incurred later, by selecting the calculation method for damages following the damage occurrence type.

  • PDF

지하공간 활용의 권리보완을 위한 제도적 개선에 관한 연구 - 한계심도 초과 토지를 중심으로 - (A study on system improvement to utilization of underground space for the right complementary - Focused on land of exceeding the depth limit -)

  • 서용수;최승영
    • 지적과 국토정보
    • /
    • 제44권1호
    • /
    • pp.97-111
    • /
    • 2014
  • 도시화 및 산업화가 발달하면서 한정된 토지를 입체적으로 이용하고자 하는 필요성이 점점 대두되고 있다. 특히 수도권의 교통난을 해소하기 위하여 경기도가 GTX(Great Train Express, 광역급행철도) 건설계획을 발표하면서 이에 따른 지하공간 활용논의가 활발해지고 있다. 현행 지하공간 보상은 "도시철도 건설을 위한 지하부분 토지의 사용에 따른 보상기준에 관한 조례"에 의한 보상기준에 의거하여 산정하고 있으나, 입체적 권리에 대하여 완전한 권리보호가 어려운 점이 있다. 이에 본 연구에서는 토지소유권이 미치는 지하공간의 효력범위를 설정하는 구분지상권 및 사용재결 이용 현황을 검토하고 지하공간 활용에 따른 보상기준에 관한 쟁점을 분석하여 지하공간 활용의 권리보완을 위한 개선방안을 제시하였다.

선보상-후시공 제도의 공공건설사업 파급효과 분석 (Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects)

  • 김상범;최정원
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.245-254
    • /
    • 2004
  • '선보상-후시공 제도화' 대책은 1999년 「공공건설사업 효율화 종합대책」의 세부 대책으로서 공공건설 사업비용 $90\%$ 절감을 목표로 수행되었다. 이에 본 연구에서는 대책의 성과를 측정하고 분석하여 향후의 개선 사항 및 제안을 위해, 종합대책 이전과 이후로 구분하여 관련 자료를 분석함으로써 대책에 대한 성과 분석 연구를 수행하였다. 이러한 성과의 분석은 사업비와 사업기간의 관점에서 정량적인 성과 측정을 중심으로 이루어 졌으며, 선보상-후시공 제도화 대책의 성과로 인한 종합대책의 전체성과에 대한 기여도와 향후 제안 사항 등을 기술하였다. 연구 결과 본 대책은 약 $4.83\%$의 공공건설 예산 절감효과가 있는 것으로 분석되었으며, 공기 절감 면에서도 긍정적 파급효과가 있는 것으로 나타났다.

항공용 카메라 전방운동 보상기능의 실험실 입증방안 (Laboratory Test Method for the Forward Motion Compensation of Airborne Camera)

  • 송대범;윤용은
    • 한국군사과학기술학회지
    • /
    • 제15권4호
    • /
    • pp.507-512
    • /
    • 2012
  • Image blurring in airborne camera can be prevented through timely actuation of LOS(Line of Sight) into the opposite direction to the aircraft advancement, i.e. FMC(Forward motion compensation). Performance verification of FMC requires installation of camera to the aircraft. However, in many ways the verification process has little choice but to be implemented in the laboratory. In this paper verification method of FMC performance in the laboratory is introduced. With collimator target installed in the known reference position image obtained by actual mission plan naturally displays image blurring as well as LOS displacement by FMC effect. Through comparison of the amount of those image blurring and LOS displacement to the equivalent image distortion expected by the application of the FMC reference command can the performance be verified. In this paper we propose a new verification method of FMC performance in laboratory along with generalized solution of FMC reference command, and assess the validity of our proposition.

고조파 전류원에 의한 콘덴서 임피던스 특성 해석 (Analysis of Impedance Performance for Condenser by Harmonic Current Source)

  • 김종겸;박영진
    • 조명전기설비학회논문지
    • /
    • 제25권4호
    • /
    • pp.57-64
    • /
    • 2011
  • Most of the user has been used linear load and non-linear load. The former is usually inductive load which is needed power factor compensation, the latter is power conversion system device. Actually two kinds of load is used together in the customer application. Generally capacitor is used for power-factor compensation of inductive load and reduction harmonics of non linear load with reactor. Non-linear load generates harmonic current for its energy conversion process. If harmonic current pass along the low impedance side of distribution system, the magnification of voltage and current is appeared by the series and parallel resonance. As a result, condenser has received a bitter electrical stress by the harmonic component. In this paper, we analyzed that how resonance is changed by the 5-th harmonic current pattern and proposed an alternative plan for non-magnification.

전력보상설비의 상호 협조제어에 따른 운영여유용량의 확보 (Securing Operation Margin Capacity as Coordination Control among the Power Compensation Equipments)

  • 이상덕;백영식
    • 전기학회논문지
    • /
    • 제59권6호
    • /
    • pp.1011-1016
    • /
    • 2010
  • It is an important issue to electric power system operations that it can reliably supply large-capacity power to consumption area as due to increasing power demand growth. For this purpose, The FACTS equipment based on Power IT technology with the existing mechanical compensators has been applied to power system. Therefore we suggest on this paper that a plan for coordination control of multiple power compensation equipment in order to increase the utilization of each facility and secure operation margin capacity. As the result of simulation, it is possible to cope actively with a suddenly changed power system. This helps greatly for the voltage stability and supply reliability in a suddenly changed power system.

Mitigation of gap formation resulting from saw blade in single-cut osteotomy

  • Mu-Young Kim;Stanley Eunwoo Kim
    • Journal of Veterinary Science
    • /
    • 제25권2호
    • /
    • pp.26.1-26.6
    • /
    • 2024
  • Bone loss from the kerf of the sawblade may influence the final outcomes when employing three-dimensional-printed surgical guides. However, no studies have systematically addressed saw blade-induced bone loss. This study aims to quantify bone loss and propose a reduction guide to minimize the fracture gap. The postoperative gap tended to decrease as the amount of gap compensation increased. Osteotomy gaps can be attributed to the thickness of the saw blade, and the proposed methodology addresses this surgical error. Surgeons can proactively plan and design reduction guides with applied compensation using the method described in this study.

방위산업 R&D 지체상금 제도 개선방안 연구 (A Study on the Improvement of Delay Compensation System in Defense Industry R&D)

  • 김선영
    • 산업진흥연구
    • /
    • 제5권3호
    • /
    • pp.37-44
    • /
    • 2020
  • 현재 방위산업 R&D 특성이 반영되지 못한 지체상금 제도를 적용하고 있어 방산업체의 경영악화 및 전력화 지연 등 문제가 되고 있다. 본 연구의 목적은 방위산업 R&D 특성이 반영된 지체상금 제도 개선방안을 연구하여 방위 산업 발전과 효율적으로 전투력 증강을 추진하는데 기여하기 위한 것이다. 연구는 방위산업 R&D 특성, 국가 R&D, 지체상금율, 감면 및 면제 절차와 기존연구를 분석하였다. 그리고 지체상금 부과 실태 및 지체 원인분석 등을 기초로 델파이 기법을 적용하여 개선방안을 연구하였다. 최신 기술이 적용되어 성공여부가 불투명한 방위산업 R&D에 상용품 '제조·구매' 기준을 적용하는 것은 적절하지 않은 것으로 연구되었다. 연구결과 지체 발생 방지 방안으로 우수 기술 보유 업체 선정 등 4개의 방안과 지체가 발생 시 합리적 처리를 위해 지체상금 경감 및 차등 적용 등 3개의 방안이 도출되었다. 방위산업 R&D의 특성으로 인해 방위사업법에 의해서 업무가 진행되는 것처럼 마찬가지로 지체상금 제도도 방위산업 R&D 특성이 반영된 제도로 개선한다면 방위산업은 발전하게 될 것이고, 효율적이고 경제적인 무기체계 획득에도 기여할 것으로 사료된다.

분산제어국 강우감쇠 보상을 위한 송신전력 제어방안 (Transmission Power Control for Compensation of Rainfall Attenuation at Mini-Hub)

  • 홍성택;신강욱
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 D
    • /
    • pp.2292-2294
    • /
    • 2004
  • At satellite communication system for flood forecasting and warning, VSAT system needs to good performance for aquisition of rainfall and water-level data. But, it has difficult for obtaining good performance because of the rainfall attenuation. Thus, in this paper, we introduced the efficiency plan of the transmission power control for Mini-Hub Station.

  • PDF

경영진 보수에 대한 주주 투표권(Say on pay)의 효과를 중심으로 (Focusing on the effect of shareholder voting rights (Say on pay) on CEO compensation)

  • 차정화;이은주
    • 디지털융복합연구
    • /
    • 제20권1호
    • /
    • pp.119-127
    • /
    • 2022
  • 본 연구는 2018년 금융위원회의 금융회사 지배구조 개선 방안 중 고액 연봉자 보수공시 강화 효과를 분석하기 위하여 2015년부터 2020년까지 우리나라 금융회사를 대상으로 보상체계와 경영성과, 그리고 지배구조 개선에 관한 실증분석을 수행하였다. 실증분석 결과, 2018년 이후의 금융회사가 임직원보상괴리도와 대주주지분율은 감소하고, 주식성과 및 외국인지분율은 증가하는 것으로 나타났다. 본 연구는 경영진 보수에 대해 공개하고, 그 적정성에 관하여 주주들이 투표를 통해 확인할 수 있도록 하는, 이른바 Say on pay의 적용 효과를 검증한 첫 번째 국내연구라는 점에 가장 큰 공헌점이 있다. 외국의 Say on pay 제도는 기업 보상 체계를 더욱 엄격하게 조정하도록 하면서 기존 대기업의 보수지급 관행을 변화시켰다. 따라서 보수 공시제도의 긍정적인 효과를 반영한 금융위원회의 금융회사 지배구조 개선방안이 실효성을 거두었는지 실증 분석하였다는 점에서 의의가 있다. 또한 경영진의 과도한 보상을 통제하기 위한 수단으로서의 Say on pay의 효과에 집중한 점에서 최근 ESG경영과 지배구조 개선방안에 관한 학술적 공헌점도 제공한다.