• 제목/요약/키워드: Common cost

검색결과 1,059건 처리시간 0.025초

비용편익 분석에 기초한 공동구의 경제적 타당성 평가 (Economic Feasibility of Common Utility Tunnel based on Cost-Benefit Analysis)

  • 강영구;최익창
    • 한국안전학회지
    • /
    • 제30권5호
    • /
    • pp.29-36
    • /
    • 2015
  • Common utility tunnel is essential to the daily lives of people underground utilities (electricity, gas and supply facilities such as water, communication facilities, sewer facilities, etc.) to improve the appearance by co-acceptance and disaster prevention, important for the conservation of the city's population was concentrated road construction the city-based facilities. There is recognition of the importance of the various supply treatment facilities in common utility tunnel as infrastructure to accommodate joint according to the city expanded, the demand for infrastructure. In this paper, a cost-benefit analysis using a one-time occurrence, without simply relying on cost or current cost, project manager for the city-dimensional feasibility study conducted, the user level of the maintenance costs and user costs, including social costs items from various angles can be investigated and proposed a mechanism of economic feasibility common utility tunnel. Evaluation of the proposed technique is cost-benefit and cost caused by installing common utility tunnel the existing pipeline area - was investigated by the benefit analysis, extended and repeated common utility tunnel installation depends much affected by the excavation, so users of reducing the number of repeat excavation convenience can be seen that this occurs.

Reducing Common-Mode Voltage of Three-Phase VSIs using the Predictive Current Control Method based on Reference Voltage

  • Mun, Sung-ki;Kwak, Sangshin
    • Journal of Power Electronics
    • /
    • 제15권3호
    • /
    • pp.712-720
    • /
    • 2015
  • A model predictive current control (MPCC) method that does not employ a cost function is proposed. The MPCC method can decrease common-mode voltages in loads fed by three-phase voltage-source inverters. Only non-zero-voltage vectors are considered as finite control elements to regulate load currents and decrease common-mode voltages. Furthermore, the three-phase future reference voltage vector is calculated on the basis of an inverse dynamics model, and the location of the one-step future voltage vector is determined at every sampling period. Given this location, a non-zero optimal future voltage vector is directly determined without repeatedly calculating the cost values obtained by each voltage vector through a cost function. Without utilizing the zero-voltage vectors, the proposed MPCC method can restrict the common-mode voltage within ± Vdc/6, whereas the common-mode voltages of the conventional MPCC method vary within ± Vdc/2. The performance of the proposed method with the reduced common-mode voltage and no cost function is evaluated in terms of the total harmonic distortions and current errors of the load currents. Simulation and experimental results are presented to verify the effectiveness of the proposed method operated without a cost function, which can reduce the common-mode voltage.

다수(多数) 기계(機械)의 총비용(總費用)을 최소화(最小化)하는 최적작업순서, 공통납기일 및 작업완료일 결정을 위한 일정계획(日程計劃) (Optimum Scheduling Algorithm for Job Sequence, Common Due Date Assignment and Makespan to Minimize Total Costs for Multijob in Multimachine Systems)

  • 노인규;김상철
    • 대한산업공학회지
    • /
    • 제12권1호
    • /
    • pp.1-11
    • /
    • 1986
  • This research is concerned with n jobs, m parallel identical machines scheduling problem in which all jobs have a common due date. The objective of the research is to develop an optimum scheduling algorithm for determining an optimal job sequence, the optimal value of the common due date and the minimum makespan to minimize total cost. The total cost is based on the common due date cost, the earliness cost, the tardiness cost and the flow time cost of each job in the selected sequence. The optimum scheduling algorithm is developed. A numerical example is given to illustrate the scheduling algorithm.

  • PDF

활동기준원가시스템을 이용한 분만실 간호활동 및 원가 분석 (Cost Analysis of Nursing Services in the Delivery Room Using Activity-Based Costing)

  • 김인숙;강경화;이해종;김미정;강수진;주영미
    • 간호행정학회지
    • /
    • 제8권1호
    • /
    • pp.17-29
    • /
    • 2002
  • The purpose of this study was to examine the application of the Activity-based Costing(ABC) system to analyze the cost of nursing services in the delivery room in a major medical center.The results of this study are as follows;1. In order to calculate the cost of nursing activities, 67 activities of staff nurses on a delivery room were identified and classified as direct nursing activities(45.2%), the indirect activities(32.1%), general management activities(13.9%) and others(8.8%).2. Nursing cost in the delivery room was classified into activity cost(29.9%) and common cost(70.1%). Activity cost involved direct activity cost of staff nurses. The common costs were categorized into indirect activity & general management cost of staff nurses, management cost of the head nurse and activity cost of assistants.3. The final cost objects of nursing services in the delivery room were nursing service for women who had normal vaginal deliveries and nursing service for women who had preterm labor.The total cost of nursing service for a woman who had a normal vaginal delivery was 165,710 won (100.0%). The cost incurred through direct activity cost of staff nurses(58,242 won, 35.1%), indirect activity & general management cost of staff nurses (55,643 won, 33.6%), management cost of head nurse (16,211 won, 9.8%), activity cost of assistants (35,614 won, 21.5%).If the number of days of hospitalization was presumed to be 14 days, the total cost of nursing service for woman who had preterm labor would be 1,845,901 won (100.0%). The cost incurred by direct activity cost of staff nurses in the activity cost (341,349 won, 18.5%), indirect activity & general management cost of staff nurses in the common cost(779,002 won, 42.2%), management cost of head nurse(226,954won, 12.3%), activity cost of assistants in the common cost(498,596 won, 27.0%).In this study, the cost of the nursing services in the delivery room was calculated based on the ABC system. The results of this study showed that resources are assigned to the nursing activities in the delivery room and the mechanisms for assigning the cost of activities for nursing services.

  • PDF

열병합발전에서 비용배분 방법론의 고찰 (Consideration of Cost Allocation Methodology on Cogeneration)

  • 김덕진
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.1197-1202
    • /
    • 2009
  • Cost allocation on cogeneration is a methodology dividing the input of common cost to electricity cost and heat cost. In the cost allocation methodology of the electricity and heat on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, reversible work method, various exergetic methods, and so on. In previous study, various cost allocation methodologies have been applied and analyzed on a gas-turbine cogeneration producing the 33.1 MW of electricity and the 32.2 Gcal/h of heat, a steam-turbine cogeneration producing the 22.2 MW of electricity and the 44.3 Gcal/h of heat, and combined-cycle cogeneration producing the 314.1 MW of electricity and the 279.4 Gcal/h of heat. In this study, we integrately analyze the results of previous studies and examine the generality and rationality each methodology. Additionally, a new point of view on the values of alternative electricity efficiency and alternative heat efficiency in the previous methodologies was proposed. As the integrated result, we conclude that reversible work method of various common cost allocation methodologies is most rational.

  • PDF

조기완료 및 납기지연 벌과금을 고려한 흐름작업 시스템의 일정계획 (A Study on Flow Shop Scheduling with Early & Tardy Penalty Cost)

  • 이정환
    • 산업경영시스템학회지
    • /
    • 제16권27호
    • /
    • pp.91-104
    • /
    • 1993
  • This paper is concerned with flow shop scheduling problems having the common due date. V-shape property is used for algorithms with early and tardy penalty cost. The objective of this paper is developing efficient heuristic scheduling algorithms for minimizing total penalty cost function and determining the optimal common due date. The between job delay and the work in process are considered for developing algorithms as penalty cost. Algorithms is simulated to analyze interrelated factors. A numerical example is given for illustrating the proposed algorithms.

  • PDF

어장이용의 기회비용접근법에 의한 공동소유 어업권의 손실보상금 분배연구 - A어촌계의 미역양식어업권의 취소보상액 분배사례를 중심으로 - (A Study on the Distribution of Compensation for Damages of Common Property Fisheries by Alternative Cost Approach of Utilizing Fishing Ground)

  • 김기수;강용주
    • 수산경영론집
    • /
    • 제34권1호
    • /
    • pp.9-30
    • /
    • 2003
  • This paper tries to suggest a rational proposal for the distribution of compensation of common property fisheries damages caused by a large scale coastal reclamation. For the purpose the paper introduces the approach of alternative cost of the use of fishing ground. The background of the paper is the legal conflict between tenants and non-tenants, both of whom are common owners of seaweed cultivation ground, in the distribution of compensation for damages. In principal, so far as the seaweed cultivation right is a common property of the fishing association, the compensation is also a common property of it. Therefore the distribution method of the compensation entirely depends on the decision of the association. But in case that the numbers of non-tenants is larger than those of tenants, the distribution of the compensation is usually unfavorable to the tenants even though the latter is the key contributor to the realization of present value of the common property. The paper aims to show an appropriate distribution method based on the economic principle of optimal distribution. In others words, the value added to the economic value of alternative use of the fishing ground should be distributed to the tenants. the value amount of alternative use of the fishing ground should be equally distributed to the members of the association.

  • PDF

증기터빈 열병합발전에서 열과 전기의 비용배분 (Cost Allocation of Heat and Electricity on a Steam-Turbine Cogeneration)

  • 김덕진
    • 설비공학논문집
    • /
    • 제20권9호
    • /
    • pp.624-630
    • /
    • 2008
  • When various kinds of outputs are produced from a single energy system, the methodology which allocates the common cost to each output cost is very important because it is directly related with the profit and loss of producers and purchasers. In the cost allocation methodology of the heat and the electricity on a cogeneration, there are energy method, work method, proportional method, benefit distribution method, exergetic methods, and so on. On the other hand, we have proposed a worth method which can be applied to any system. The definition of this methodology is that the unit cost of a product is proportion to the worth. Where, worth is a certain evaluating basis that can equalize the worth of products. In this study, we applied worth method to a steam-turbine cogeneration which produces 22.2 MW of electricity and 44.4 Gcal/h of heat, and then we allocated 2,578 $/h of common cost to electricity cost and heat cost. Also, we compared with various cost allocation methods. As the result, we conclude that exergy of various kinds of worth basis evaluates the worth of heat and electricity most reasonably on this system.

공통선 신호망의 토폴로지 설계 알고리즘에 관한 연구 (A Study on the Topology Design Algorithm for Common Channel Signalling Network)

  • 이준호;김중규;이상배;박민용
    • 전자공학회논문지B
    • /
    • 제28B권5호
    • /
    • pp.369-381
    • /
    • 1991
  • In this paper, design algorithms for SMP(Single Mated Pair) and MMP (Multipli Mated Pair) structure of CCS (Common Channel Signaling) network are proposed through the study of the structure of CCS network. High reliability and fast messagy transfer time are the most important requirements for the CCS network. Based on it, three parameters such as monotraffic, reliability (maximum isolated SP(Signalling Point) number when any two STP(Signalling Transfer Points) fail and total network cost are defined. And the proposed algorithms different from preexisted algorithm that minimizes total network cost, maximize monotraffic with two constraints, reliability and total network cost. Comparing the experimental results of the proposed algorithms with those of the preexisted algorithm that minimizes total network cost, shows that the proposed algorithms produce a more reliable topology that has more monotraffic and a little higher total network cost. Additionaly, with the results of the proposed algorithms, SMP and MMP structures are compared.

  • PDF

실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발 (The Common Temporary Work Management System Using Historical Database)

  • 박경호;이훈구;백종건;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.367-370
    • /
    • 2002
  • 건설 프로젝트의 초기단계에 타당성을 검토함에 있어서 공통가설공사의 경우 설계도서상에 표시가 되지 않거나, 시방서상에 간략하게 서술되어 있기 때문에 담당자의 경험 의존율이 다른 공종에 비해 높다. 이런 초기단계의 결전은 프로젝트의 진행과 더불어 많은 문제점들을 야기 시킬 가능성이 있다. 따라서 최근 활발히 논의가 되고 있는 기존 공사정보에 대한 실적 데이터베이스와 공통가설공사의 분류체계를 포함한 시스템을 개발하여 자료들을 분석, 활용함으로써 시공전(Pre-Construction) 단계의 공통가설공사에 대한 작업 및 원가 예측을 용이하게 하고, 후에 Feed Back 됨으로써 정확한 건설 프로젝트 타당성 분석을 가능케 하고자 한다.

  • PDF