Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

A Study on the Construction of a Solar Boat Prototype (솔라보트 프로토타입 제작에 관한 연구)

  • Hong, Sin-Pyo;Lee, Kyoung-Wan;Chun, Ho-Hwan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.44 no.2 s.152
    • /
    • pp.189-197
    • /
    • 2007
  • In this paper a study on the construction of a solar boat prototype is presented. Basic components of solar boats and the construction of a simple solar boat prototype by undergraduate students are described. Main purposes of this study are to examine the feasibility of developing commercial solar boats and to evaluate the effect of solar boat construction on the education of students. A low-cost solar boat prototype is constructed by assembling parts available in the market or laboratory. From the prototype construction experience, students obtained basic knowledge on the design and construction of commercial or racing solar boats. In addition, it is shown that the construction of a solar boat can be au effective educational program to expose students to practical multidisciplinary study involving naval architecture, ocean engineering, mechanical engineering, electrical and electronics engineering.

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

The Estimate of the Urban Development Effects of the Subway Construction using GIS (GIS를 이용한 지하철 건설의 도시개발 효과 분석)

  • Kim, Jae-Ik;Chung, Jae-Heui;Chung, Hyun-Wook
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.3 no.4
    • /
    • pp.22-32
    • /
    • 2000
  • The improvement of transportation condition is known to be a main source of regional development. This paper aims to estimate the development effects of the subway construction on commercial buildings in suburban area. For this purpose, it examines using GIS how many commercial buildings were registered around surface of subway line and stations after the publicity of subway construction plan in Taegu city. The main findings are follows; Firstly, there is a strong development tendency of commercial building which aims at time of starting and completion of subway construction. Secondly, development effects are stronger in front raw of the corridor than in the rear side of the raw. Thirdly, development types are different station by station.

  • PDF

A Study on the Location of Bus & Truck Automobile Maintenance Company (상용자동차 정비업체의 입지선정에 관한 연구)

  • Kim, Ju-Yong;Jo, Eun-Hyeon;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.23-30
    • /
    • 2019
  • Automobiles are largely divided into passenger cars with less than five passengers and commercial vehicles such as construction machines, trucks, mixers, special lorries, and large buses. Automobile maintenance companies are also divided into passenger cars and commercial vehicles. Because commercial vehicles are the livelihood vehicles of individual carriers engaged in cargo transportation, passenger transportation, and construction, fast and accurate maintenance is important. Access to the expressway is also important because the car is large and uses highways. In addition, the time required for troubleshooting is long, so sufficient space must be secured for parking the vehicle, and ease of entry and exit of the vehicle in the maintenance shop should be fully considered. For this reason, commercial vehicle maintenance companies have higher initial investment costs than car maintenance companies, and it is difficult to supply and maintain maintenance personnel. Therefore, it is necessary to carefully examine and analyze various related factors for successful commercial vehicle maintenance company selection. However, most existing commercial vehicle maintenance companies often choose their location based on the empirical judgment of the founder, the customs and the case, without a clear analysis. In this study, we show how to derive the location selection factors to be considered when establishing professional maintenance company for commercial vehicles and to select the optimal location by using AHP (Analytic Hierarchy Process) method.

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.

  • PDF

A Study on the Efficient Construction of Commercial Building and Its Rate of Return : Centered on the Case of Building Construction in Yuseong-gu, Daejeon Metropolitan City (상업용 빌딩의 효율적 신축 및 수익률에 관한 연구 : 대전광역시 유성구 소재 빌딩신축 사례를 중심으로)

  • Min, Chang Ki;Lee, Dong Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.4
    • /
    • pp.219-226
    • /
    • 2012
  • Recently real-estate investment business is standing out as a new plan for creation of source of income. In this paper, we suggested appropriate real-estate investment strategy through the reconstruct case study of existing one-storied building. That is, we showed the efficient process of decision and propel to reconstruct and the key points for lease business and post management after building completion. Also, we analyzed the rate of return of commercial building investment in order to find its optimum dealing time. Therefore the results of this paper are expected to be a help to old ages and persons laying plans for a similar business.

A Study on the Improvement of Human Safety Standards Considering Fire Cases in High-rise Residential Facilities (고층 주거시설 화재사례를 고려한 인명안전기준 개선방안에 관한 연구)

  • Cho, Hwi-Je;Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.106-107
    • /
    • 2021
  • The fire in Ulsan in 2020 was a 33-story residential and commercial complex with about 90 injuries and more than 10 billion won in property damage, and considering the recent increase in high-rise residential and commercial complexes, the risk of similar fires is high. As can be seen through the residential and commercial complex fire case in Ulsan, life-based fire safety standards need to be established to minimize casualties. Therefore, the purpose of this study is to draw improvements for the development of human safety standards for high-rise residential facilities in the future through comparison with the Korean Building Act, Firefighting-rellated Acts and the U.S. NFPA 101.

  • PDF

BIM-based Property Management by Linking Maintenance with Financial Data for Commercial Building Projects

  • Shin, Hyeonju;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.418-425
    • /
    • 2022
  • For a commercial building, property managers play an important role in maximizing the benefit by reducing cost and increasing revenue in the operation and maintenance phase of the building. However, most of property managers are spending their time in monitoring facility managers who have little impact on cost reduction and maximization of operating profit. The industry practitioners have difficutlty in increasing the efficiency of thier work due to this work environment. In addition, both property managers(PMr) and facility managers(FMr) are dependent on the paper drawings and manuals, which can worsen the inefficiency and human errors are inevitable. This study aims to contribute to improvement of the current practice by developing a novel algorithm that autmatically links the facility information with 3D model, which can provide an efficient property management for commercial buildings.

  • PDF

A Study on the Right of Light Impact at Adjacent Residential Area by High-rise Residential Commercial Complex Building (상업지역내 고층건물의 인접주거 지역 일조권 영향에 관한 연구)

  • Lee, Sang-Hwa;Lee, Kyoo-Seock
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.12 no.2
    • /
    • pp.10-18
    • /
    • 2009
  • In order to determine the violation of right of light impact at adjacent residential area by high-rise building, analysis on the right of light for high-rise residential commercial complex building block at Gahngnam-ku, Seoul, Korea was carried out using Google Sketchup Pro. After the analysis th sunshine duration of B apartment decreased from 5 hours 16 minutes 3 hours 48 minutes by I hour 42 minutes after construction. It shows that the total sunshine duration is less than the Seoul City Government Standard which is more than 4 hours a day, or more than 2 consecutive hours. Lowering the heights of apartments by 54m would increase the total sunshine duration which would meet the Seoul City Government Standard by four hours seven minutes. Problems that rna lead to the violation on the right of light in the adjacent area should be discussed in advance and minimized by analyzing the right of light among buildings and structures which are scheduled to be constructed on the site during construction penni! process when high-rise building is proposed.