• Title/Summary/Keyword: Client Control

Search Result 629, Processing Time 0.027 seconds

Extending VNC for Effective Collaboration (효과적인 협업을 위한 VNC 확장)

  • Lee, Tae-Ho;Lee, Hong-Chang;Park, Yang-Su;Lee, Myung-Joon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.6
    • /
    • pp.181-193
    • /
    • 2008
  • VNC is one of popular thin client computing systems, which supports cross-platform remote control using the RFB protocol. Unfortunately, since VNC does not provide functions specially designed for collaboration, it is difficult to collaborate effectively through the remote control function of VNC. In this paper, we present the extension of the UltraVNC server and the JavaViewer client which are one of open-source VNC systems. For effective real-time collaboration, the extended VNC provides three kinds of access authorities to control the collaboration server: administrator, worker, and spectator. The administrator can control the access authorities of the users through the access control tool, newly provided in the extended JavaViewer. The workers can access the resources of the remote server, whereas the spectator cannot handle those remote resources, only monitoring the remote server. In addition, the extended VNC provides the one-click connection facility for easy connection to the collaboration server from many collaboration participants.

  • PDF

Implementation of Client Authentication System on Transparency Cache (투명 캐시에서의 사용자 인증 시스템 구현)

  • Kim, Seong-Rak;Gu, Yong-Wan
    • The KIPS Transactions:PartC
    • /
    • v.9C no.2
    • /
    • pp.181-188
    • /
    • 2002
  • There are recently a lot of inconvenience because every client should be set to the proxy server on the browser in order to control the access by means of the client authentication in the proxy server. The client authentication technology using the transparency cache in this paper will be transparently used for every user in the internet which option of the authentication function is simply set in the cache server. In addition, the administrator will get the benefit since he can control the traffic of each client and strengthen the security. And also, this system is expected to use in the eCRM deeply rotated to the tendency of the client in the field of the e-commerce like shopping mall in the internet since the administrator can monitor the pattern of the client using the internet. This technique can be applied to the company affiliated research center, the EC website, and the military where it is essential for the tight security even though there are no additional security devices.

Implementation of a Remote Controlling System between Server/Client based Mobile (모바일 기반의 서버/클라이언트간 원격제어시스템의 구현)

  • Kim, Jae-Saeng;Lee, Jeong-Sik
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.6
    • /
    • pp.106-114
    • /
    • 2010
  • Recently, with the development of network technology, the web-based remote control systems and the real time remote control systems that do not have any restrictions at any time and space are many developed in the several industry FA field. In this paper, we developed the graphic editor screen of the client PC (PDA) with wireless network and the real time remote control system that can access the industry's server and can control the transmission of data for the FA of iron and steel industry field. Implementation of this system brought on the several effects of the decrease of the worker's movement, the control of quick equipments, a step-up in production efficiency, and the decrease of maintenance expense and so on in administration side of industry field.

Design md Implementation for the Remote Real Time Process Monitoring and Control System based on the JMF (JMF 기반의 실시간 원격 공정 감시 및 제어 시스템 설계 및 구현)

  • Kim, Sam-Ryong;Lim, In-Taek;Lee, Jeong-Bae
    • The KIPS Transactions:PartD
    • /
    • v.11D no.2
    • /
    • pp.453-460
    • /
    • 2004
  • In this thesis, remote conveyor control and monitoring system is designed and Implemented for shoes production process based on Lego prototyping mechanism by using the I/O interface control board for the ISA Interface control board. A conveyor server for real time profess control is implemented based on RTLinux(Real-Time Linux) so that users deride priority of work. And device driver is implemented bated on the RTLinux. Through this system, real-time Client/server monitoring environments Is implemented and tested. And the JMF(Java Media Framework) based monitoring system was implemented and the total processing status war monitored.

Mobile Client System Design & Implementation of J2ME Base for Location Information (위치정보를 위한 J2ME기반의 모바일 클라이언트 시스템 설계 및 구현)

  • 이창희;전형준;나극환
    • Journal of the Korea Computer Industry Society
    • /
    • v.4 no.10
    • /
    • pp.547-558
    • /
    • 2003
  • This paper is a parking management system which uses mobile terminal equipment by the client. From the Web server, the client will be served about the information concerned with the location o( parking lot, parking time, and payment after accessing the parking management web site. After the sensor which is set in the parking lot perceives the information about the client's car, it will inform the client of the parking place. This system is designed to control the large and complex parking lot and serves a very convenient interface to the user.

  • PDF

ActiveX Based Framework For Efficient Generation of OPC Client (효율적인 OPC Client 생성을 위한 ActiveX 기반 프레임워크)

  • Yoo, Dae-Sung;Kim, Jong-Hwan;Park, Jae-Hee;Yi, Myeong-Jae
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.621-623
    • /
    • 2005
  • OPC has made it to improve the development of control and monitoring software. But it is difficult to understand COM/DCOM model that is a base technology of OPC and complex communication setting between OPC Server and OPC Client. Therefore, in this paper, we design and implement ActiveX based components that are enable to solve these problems. Implemented components provide a method for simple communication between OPC Server and OPC Client and a GUI environment for easy and fast setting of communication information. Also, they provide the architecture for efficient management of OPC Server's data. By using implemented component, easy development and efficient maintenance of OPC Client can be supported.

  • PDF

Development of a Greenhouse Monitoring System Using Network (네트워크를 이용한 온실 감시 시스템의 개발)

  • 임정호;류관희;진제용
    • Journal of Biosystems Engineering
    • /
    • v.28 no.1
    • /
    • pp.53-58
    • /
    • 2003
  • This study was carried out to design, construct, and test a greenhouse monitoring system fur the environment and status of control devices in a greenhouse from a remote site using internet. The measuring items selected out of many environmental factors were temperature, humidity, solar radiation, CO$_2$, SOx, NOx concentration, EC, pH of nutrient solution, the state of control devices, and the image of greenhouse. The developed greenhouse monitoring system was composed of the network system and the measuring module. The network system consists of the three kinds of monitors named the Croup Monitor. the Client Monitor and the Server Monitor. The results of the study are summarized as follows. 1. The measuring module named the House Monitor. which is used to watch the state of the control device and the environment of the greenhouse, was developed to a embedded monitoring module using one chip microprocessor 2. For all measuring items. the House Monitor showed a satisfactory accuracy within the range of ${\pm}$0.3%FS. The House Monitors were connected to the Croup Monitor by communication method of RS-485 type and could operate under power and communication fault condition within 10 hours. The Croup Monitor was developed to receive and display measurement data received from the House Monitors and to control the greenhouse environmental devices. 3. The images of the plants inside greenhouse were captured by PC camera and sent to the Group Monitor. The greenhouse manager was able to monitor the growth state of plants inside greenhouse without visiting individual greenhouses. 4. Remote monitoring the greenhouse environment and status of control devices was implemented in a client/server environment. The client monitor of the greenhouse manager at a remote site or other greenhouse manager was able to monitor the greenhouse environment and the state of control devices from the Server Monitor using internet.

Design and Construction of SCADA System using Ajax (Ajax를 이용한 감시제어시스템 설계구축)

  • Lee, Jong-Gu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.1502-1505
    • /
    • 2007
  • 인터넷 및 네트워크 환경의 비약적인 발전으로 기업체의 모든 기반 Application은 사용의 편리함과 시스템 및 데이터관리의 용이성 때문에 웹 기반모델로 변경되어 사용되고 있다. 그러나, 산업현장설비를 실시간 원격제어 감시하는 시스템인 SCADA(Supervisory Control and Data Acquisition)는 웹의 여러 한계성 때문에 아직까지 기존 Client-Server 모델로 대부분 활용되고 있다. 본 논문에서는 이러한 웹의 한계성 중 Client 시스템의 실시간 통신 방식 및 속도, 부하 등을 기존 Client-Server 방식과 동일한 성능을 갖도록 설계 구현하여 적용하고 성능을 평가 하였다.

  • PDF

Development of Optimal Control System for Air Separation Unit

  • Ji, Dae-Hyun;Lee, Sang-Moon;Kim, Sang-Un;Kim, Sun-Jang;Won, Sang-Chul
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.524-529
    • /
    • 2004
  • In this paper, We described the method which developed the optimal control system for air separation unit to change production rates frequently and rapidly. Control models of the process were developed from actual plant data using subspace identification method which is developed by many researchers in resent years. The model consist of a series connection of linear dynamic block and static nonlinear block (Wiener model). The model is controlled by model based predictive controller. In MPC the input is calculated by on-line optimization of a performance index based on predictions by the model, subject to possible constraints. To calculate the optimal the performance index, conditions are expressed by LMI(Linear Matrix Inequalities).In order to access at the Bailey DCS system, we applied the OPC server and developed the Client program. The OPC sever is a device which can access Bailey DCS system.The Client program is developed based on the Matlab language for easy calculation,data simulation and data logging. Using this program, we can apply the optimal input to the DCS system at real time.

  • PDF

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.