• Title/Summary/Keyword: Claim Management

Search Result 339, Processing Time 0.027 seconds

Comparative Analysis on Repairing Cost of Lawsuit on Concrete Crack Defect in Apartment Building (공동주택 하자소송의 균열하자보수비 비교.분석 연구)

  • Kim, Beop-Su;Park, Jun-Mo;Choi, Jeong-Hyun;Seo, Deok-Seok;Kim, Ok-Kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.142-150
    • /
    • 2011
  • Defect dispute has been increasing to claim by condominium, in increasing to demand and concern in value, quality, and management of apartment building since 2000s. In this study, for checking property of cost in crack issue with precedure of lawsuit on defect, it is analyzing details about repairing cost of concrete crack defect that formed 77 percent of repairing cost. Futhermore, it is studying of composition of repairing cost and difference of repairing cost by repairing method. This is checking details that cost growth has a difference whether court accept a acceptable range of crack width, and repairing method and reinforcement work has to choose between a surface treatment method, a filling method and a injecting method. Meanwhile, it is considerable that disparity of repairing cost whether is a method of painting work.

Developing methodology of 3D Cadaster Feature Model using Cadastre Process Analysis (지적 업무 분석을 기반으로 한 3차원 지적 항목 모델 개발 방법)

  • You, Hee Min;Jeong, Dong Hoon;Lee, Ji Yeong
    • Spatial Information Research
    • /
    • v.21 no.3
    • /
    • pp.55-69
    • /
    • 2013
  • In the modern society, as the city grows and constructive technology gradually develops, land usage has been sophisticated and three-dimensionalized. Consequently, issues such as property ownership and legal claim over ground and underground space have been triggered, which disclose the problems of using two-dimensional cadastral management system. Numerous researches on building three-dimensional cadastral are ongoing such as defining the right relationship of land space and providing the registration and management scheme so as to solve the imminent matter. It is the chief aim of this study to increase efficiency by analyzing the vocational practices through adding on necessary sections and properties for current registration to original research work. If three-dimensional cadastral management system is once constructed, highly qualified services for citizens will be available by providing accurate land related information swiftly, which can result in inevitable improvement of efficiency at work. Hence, this thesis will suggest the internationally suitable feature model development method in terms of standardization by probing into the factual profession to derive each attributes and properties that are related to three-dimensional cadastral and affix them to the classified item requisites of initial research studies.

A study on the present status and improving management of the non-eligible people in Korean long-term care insurance system (노인장기요양보험 등급외 판정자의 관리현황과 개선방안)

  • Kwon, Jin-Hee;Han, Eun-Jeong;Lee, Jung-Suk;Park, Chong-Yon
    • Health Policy and Management
    • /
    • v.20 no.2
    • /
    • pp.104-127
    • /
    • 2010
  • To vitalize the link program of Korean long-term care insurance system to community-based services for non-eligible people, we analysed the claim data from the Korean National Health Insurance Corporation (NHIC), and conducted a questionnaire survey to charging employees of elderly service department at local governments. The subjects were all 81,377 people, 57,454 of them were arranged to community-based services. The link program was more necessary among the missed subjects rather than the arranged people due to the need for physical or psychological assistance. By the result of the survey to the local government employees, 59.5% of subjects responded their proportion of link service was over 10% and under 20%, and 54.3% of them responded their job boundary are not clear. Major type of linking was notification the subject list to local government, 91.4%; proportion of periodical notification on the status of their service link were 57.1%, only 7.1% were followed to manage after the link. Difficult factors at the link process were pointed out the overload by other side work, deficiency of resources, rigidity of priority of link, and so on. Considering these results, to vitalize the community-based services to the non-eligible people, it may be essential the active participation of the subjects, construction of parts working in coordination among the institutions including NHIC, local governments, and service providers; development of various services for maintenance or promotion of the non-eligible peoples' health and functional status; and active participation of institutions from the third sector, and so on.

A Study on the Decreasing the Claim Incidence by Offering Appropriate Information at Subscription Phase (청약단계에서의 적정분양정보 제공을 통한 공동주택 민원성 하자발생 감소방안에 대한 연구)

  • Yoo, Seung-Yeun;Yi, June-Seong;Go, Jong-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.718-721
    • /
    • 2006
  • The purpose of this study is to propose the way of decreasing frequently-occurred complaint by offering proper sale information at subscription phase based-on post-occupancy satisfaction survey. For this purpose, questionnaire surveys of residents were conducted to analyze their cognition of apartment sale information at subscription phase. and deduce appropriate sale information. The results can be summarized as followings: 1) It provides well-managed apartment sale information as utilizing checklists which is based on important items that effects on apartment inhabitants' satisfaction in apartment sale marketing. 2) It establishes a specific management standard of proper items of apartment sale information. 3) It manages and provides apartment sale information by making checklists of apartment sale information which consumers needs in their actual necessities.

  • PDF

THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석방법)

  • Ji, Kun-Chang;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.131-136
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity. and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay. Moreover, the analysis method did not consider the trait, which cause the schedule delay, in constructing projects. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

  • PDF

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

A Simulation Analysis of R.O.K Navy's Inventory Management Model for Repairable Parts (시뮬레이션을 통한 해군의 복구성 수리부속 재고관리 모형 개발에 관한 연구)

  • Kim, Sungpil;Park, Sunju;Chung, Yerim
    • Journal of the Korea Society for Simulation
    • /
    • v.22 no.1
    • /
    • pp.31-40
    • /
    • 2013
  • Recent development in science and technology has modernized the weapon systems of ROKN (Republic Of Korea Navy). Although the cost of purchasing, operating, and maintaining the cutting-edge weapon systems has been increased significantly, the national defense expenditure is under a tight budget constraint. In order to maintain the availability of ships with low cost, we need an efficient and scientific method for managing repairable parts. In this study, we propose a simulation model that computes the availability of ship's repairable parts. Our model is based on the METRIC (Multi Echelon Technique Repairable Item Control) model and extends to five sub-models to reflect the realistic situations that arise in the navy, such as planned maintenance, condemnation, lateral transshipment, and cannibalization. We have performed simulations to compute the availability of repairable parts while setting the part-level consistent throughout the five models and carried out two sensitivity analyses. The simulation results show the differences in the part availability in different models. The experiments confirm our claim that ROKN needs an inventory management system that captures the operational characteristics of the navy.

A Study on the Applicability of the Population-Based Health Care Model: Focusing on Social Cooperative-type Medical Clinics in a Local Area (인구집단 기반 건강관리모형의 적용가능성 검토: 한 지역의 의료복지사회적협동조합형 의료기관을 중심으로)

  • Lee, Keun-Jung;Oh, Ju-Yeon;Lee, Da-Hee;Hahm, Myung-Il;Lee, Jin-Yong
    • Quality Improvement in Health Care
    • /
    • v.26 no.2
    • /
    • pp.95-103
    • /
    • 2020
  • Purpose: This study was to examine whether a health care model that provides comprehensive medical services based on population groups to members of the medical cooperative is applicable as a policy alternative in terms of medical use and cost. Methods: Data were derived from National Health Insurance claim data in 2019. We compared the medical volume and expenses of patients who visited social cooperative-type medical clinics with other patients, control group who visited other clinics in a local area. Results: The average number of visit days was 25.3 days in social cooperative-type medical clinics, more than 24.2 days in the control group (p=.004). However, the average medical cost per visit was KRW 46 thousand in social cooperative-type medical clinics, which was significantly lower than KRW 51 thousand in the control group (p<.001), and the total medical cost was also KRW 16.1 billion in social cooperative-type medical clinics and KRW 16.9 billion in the control group. Conclusion: We identified that a population-based health care model might change patients' behaviors to health care services and decrease total medical cost. Further population based experiment is needed to develop alternative healthcare model.

A study of factors affecting citation of patents: Focusing on US automotive patents (특허의 피인용에 영향을 끼치는 요인에 대한 연구: 미국 자동차 특허를 중심으로)

  • Ryu, Wonrim;Kim, Youngjun
    • Journal of Digital Convergence
    • /
    • v.20 no.3
    • /
    • pp.283-295
    • /
    • 2022
  • The number of citations in a patent is one of the indicators of the qualitative value of a patent. In this study, negative binomial regression model analysis was performed focusing on 47,354 US patents of 14 global top automotive makers in order to examine the major factors affecting the number of patent citations. As a result of the review, it was found that, elapsed years since filing, the number of patent claims, the number of claim letters, the number of inventors, the number of patent family countries, and the number of patent families, as well as IPC diversity, had a positive and significant effect on the number of citations. The results of this study are expected to provide a basic basis for considering the IPC diversity index together in analyzing and evaluating future patents and establishing strategies for creating excellent patents.

A Study on the Recent Labor-Management Dispute Cases at Medical Institutions (의료기관 노사분규 사례분석연구)

  • Shin, Gang-Wook;Yu, Seung-Hum;Kim, Young-Hoon;Kim, Tae-Woong
    • Korea Journal of Hospital Management
    • /
    • v.14 no.1
    • /
    • pp.123-144
    • /
    • 2009
  • Recently, a long strike by hospital labor union emerged as a serious social issue. During the Worldcup Games in June, 2002, labor strikes broke up at 'C', 'K' and other hospitals, and in 2007, 'Y' hospital suffered much from a strike. Such series of extreme labor disputes have awakened people of importance of a more stable labor-management relationship for the medical institutions responsible for people's health than any other business organization. The purpose of this study was to examine the labor-management disputes at 'Y' hospital in 2007 and 'C' and 'K' hospitals in 2002. The results of this study can be summarized as follows; First, requests of the labor union such as pay raise, reemployment of the irregular workers as regular employees and participation of the labor union in personnel affairs are the long-held or core issues suffered by the medical institutions. Such issues are not independent from each other but complicated with each other surrounding the pay raise. Accordingly, it is not easy to determine the genuine bone of issue for labor-management disputes. Second, the model type of disputes between labor and management at medical institutions may be strike. However, it is conceived that the type of disputes would be subject to change as the essential medical service area system began to be operated since 2008. Third, the common characteristic of the labor strike among the 3 sample hospitals was occupation of the hospital lobby for a sit-in strike to maximize the negative effects of strike. Article 42 (Prohibition of Violence) of Labor Union and Labor Relation Coordination Act prohibits occupation of production or other important business facilities. In addition, since Ministry of Labor interprets that the hospital lobby belongs to the important business facilities enumerated by Article 42 of the above act, occupation of the hospital lobby for a sit-in strike may be too controversial to be admitted as a fair act of labor dispute when its legitimacy should be judged. Fourth, the counter-measures taken by the hospitals against the strike were observance of the principle 'no labor no pay,' closure, legal action, accusation, claim for recovery of damage, provisional seizure, disciplinary punishment, etc., but the principle of 'no labor, no pay' was not applied in a fair manner by 'C' and 'K' hospitals. However, 'Y' hospital applied this principle thoroughly to the strike; the hospital conduced to correction of the wrong labor-management relationship by refusing inclusion in the labor collective agreement of a provision about payment of wage during the period of strike or labor union's request to that effect during a strike. In addition, 'Y' hospital took an effective measure to end the strike earlier by notifying the labor union of cancellation of the collective agreement and banning the unionists from entering the hospital.

  • PDF