Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

Lessons Learned during the Early Phases of a Modular Project: A Case Study of UNLV's Solar Decathlon 2020 Project

  • Choi, Jin Ouk;Lee, Seungtaek;Weber, Eric
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.543-550
    • /
    • 2022
  • The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.

  • PDF

근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석 (The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project)

  • 박태일;김경훈;신은영
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.37-43
    • /
    • 2019
  • 주당 최장 법정 근로시간을 단축하는 내용의 '근로기준법 개정안'이 통과됨에 따라 근로시간 단축에 따른 근로자 소득감소, 공사기간 연장, 공사비 증가 등 다양한 문제가 발생하고 있다. 특히 다른 산업과 비교할 때, 생산성을 중시하는 건설 프로젝트의 경우 공종에 따라 주 52시간 근무제에 따른 영향의 정도가 더 클 것으로 예상되나 이에 대한 연구는 미흡한편이다. 이에 본 연구에서는 NATM 터널 공사를 대상으로 표준품셈 기반의 표준공정과 굴착 사이클 타임 그리고 공종별 단위 공기를 제시하고, 이를 통해 주 52시간 근무 적용에 따른 실제 작업조의 변화와 이에 따른 표준 공기 및 공사비의 영향을 분석하였다. 분석결과 굴착 공기와 총 공기는 각각 20%, 8.9% 증가하였으나, 굴착공사비와 총 공사비는 오히려 각각 1.2%, 0.5% 감소하는 것으로 확인되었다.

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

Automatic Linkage Method Between Email and Block Structure to Store Construction Project Documents in The Blockchain

  • Kim, Eu Wang;Park, Min Seo;Kim, Jong Inn;Wei, Ameng;Kim, Kyoungmin;Kim, Kyong Ju
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.886-892
    • /
    • 2022
  • In construction projects, it is common to exchange documents using email because of convenience. In this study, a method extracting and organizing block information automatically based on email was developed. This method is composed of document exchange and archiving processes, which are difficult to manage and vulnerable to loss. Therefore, this study aims to develop a solution that can automatically link email and block information. The block data components are designed to derive from email exchange and user-additional input information. Also, automatically generating blocks process including extraction and conversion of information was proposed. This solution can lead to promote the convenience of project document management in terms of identifying the document flow and preventing loss of information.

  • PDF

Modelling issues in the development of a simulation game for teaching construction management

  • Saad Al-Jibouri;Michael Mawdesley
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.774-780
    • /
    • 2009
  • Simulation is becoming increasingly popular in construction for training, planning and for assessment of projects. There are, however, significant problems inherent in simulating construction which are not common to other simulations. This paper describes the development and use of computer-based game for teaching and learning of some aspects of construction project management. It is concerned with the development of a model used to simulate the construction of a rock- and clay-fill dam. It includes detailed physical modelling of the performance of individual pieces of equipment and their interaction with the ground, the geography of the project and the weather in which the equipment operates. The behaviour of all of the individual pieces of equipment when acting as fleets is also discussed. The paper also describes the modelling issues of non-technical aspects of earthmoving operations. These include environmental impact, safety, quality and risks. The problems of integrating these with the physics-based models of the equipment performance are discussed. The paper also draws on real experience of using the game in classes in three universities in different countries.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Stochastic Time-Cost Tradeoff Using Genetic Algorithm

  • Lee, Hyung-Guk;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.114-116
    • /
    • 2015
  • This paper presents a Stochastic Time-Cost Tradeoff analysis system (STCT) that identifies optimal construction methods for activities, hence reducing the project completion time and cost simultaneously. It makes use of schedule information obtained from critical path method (CPM), applies alternative construction methods data obtained from estimators to respective activities, computes an optimal set of genetic algorithm (GA) parameters, executes simulation based GA experiments, and identifies near optimal solution(s). A test case verifies the usability of STCT.

  • PDF

An Information-based Forecasting Model for Project Progress and Completion Using Bayesian Inference

  • Yoo, Wi-Sung;Hadipriono, Fabian C.
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.203-213
    • /
    • 2007
  • In the past, several construction projects have exceeded their schedule resulting in financial losses to the owners; at present there are very few methods available to accurately forecast the completion date of a project. These nay be because of unforeseen outcomes that cannot be accounted for earlier and because of deficiency of proper tools to forecast completion date of said project. To overcome these difficulties, project managers may need a tool to predict the completion date at the early stage of project development. Bayesian Inference introduced in this paper is one such tool that can be employed to forecast project progress at all construction stages. Using this inference, project managers can combine an initially planned project progress (growth curve) with reported information from ongoing projects during the development, and in addition, dynamically revise this initial plan and quantify the uncertainty of completion date. This study introduces a theoretical model and proposes a mathematically information-based framework to forecast a project completion date that corresponds with the actual progress data and to monitor the modified uncertainties using Bayesian Inference.

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF