• 제목/요약/키워드: Civil construction project

검색결과 1,103건 처리시간 0.024초

THE CAUSES OF BAD PROFIT IN OVERSEAS CONSTRUCTION PROJECTS

  • Seung Heon Han;Du Yon Kim;Sang Hyuk Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1237-1243
    • /
    • 2005
  • International construction projects are exposed to various and complicated risk factors stemming from different political, economical, social, and cultural backgrounds, which make contractors entering into international construction to experience severe losses. It implies that overseas markets do not necessarily secure the high return, which is typically expected to in the high risky attempts. Accordingly, contractors need to evaluate various risk factors faced with overseas construction projects that can possibly aggravate the profitability. This paper aims at establishing a valid groundwork for further research on developing the integrated risk management model. For this end, it analyzes the long-term trend of profitability on total of 3,487 projects performed by Korean global contractors in world-wide construction markets during the last four decades. Then, it investigates the possible factors/causes of bad profit that have affected the profitability significantly through the structured surveys of 90 real overseas projects based on the project-specific information and experiences of Korean contractors in overseas markets. Furthermore, it analyzes relative importance of these factors/causes and identifies the important features expected for the risk management of international construction projects. Finally, vital distinctions between success and failure projects and lessons learned to improve profitability are then distilled.

  • PDF

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

C-PLM: 토목 프로젝트 관리를 위한 PLM 시스템 설계 및 구축 (C-PLM: Design and Implementation of a PLM System for Effective Management of Civil Projects)

  • 강형석;이상석;노상도;이광명
    • 한국CDE학회논문집
    • /
    • 제15권2호
    • /
    • pp.124-135
    • /
    • 2010
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of constructions to design C-PLM system which is a PLM system for effective management of civil project and engineering activities. Also, we implement C-PLM system based on commercial PDM system, and applied it to civil project as case studies.

Valuation of Benefits from the Adoption of Project Information Management System

  • Kyong Ju Kim;Kyoungmin Kim;Ki Yong Kang;Geon Hee Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1548-1552
    • /
    • 2009
  • In the construction industry, IT has been an alternative for the enhancement of productivity and technical advances through a paradigm shift. While it has been recognized that the IT system will have a substantial influence on the industry, a quantitative valuation has been very limited. This paper has chosen EVMS (Earned Value Management System), which supports the integrated management of cost and schedule by utilizing IT tools, and which is the largest trend in the construction IT industry in Korea, in order to suggest an analysis model for the valuation of IT. The CVM (Contingent Valuation Method) is used to quantitatively measure intangible value of IT application. Then, a valuation and analysis model were suggested for the quantitative valuation of the effect of IT adoption. In terms of willingness to pay for EVMS, the expected benefits from the adoption of EVMS were US$ 584.52 per man annually. This research should be helpful for construction companies evaluating their investment to Project Management Information System.

  • PDF

건설공사 사후평가 수행결과의 효과적인 분석방법 (Effective Analysis Framework for Construction Post Evaluation)

  • 김태영;박희성
    • 대한토목학회논문집
    • /
    • 제36권6호
    • /
    • pp.1145-1152
    • /
    • 2016
  • 건설공사 사후평가는 공공건설공사의 효율성을 평가하고, 사업결과에 대한 적정성을 검증하여 추후 유사한 건설공사에 활용 가능한 정보를 제공하기 위해 도입되었으나, 인식 부족 등에 의해 활발한 제도 이행은 미흡한 실정이다. 이에 본 연구는 건설공사 사후평가 수행결과를 활용하여 추후 유사한 프로젝트 수행 시 참고자료로 활용 가능한 기본적인 틀을 제공하는 것을 목적으로, 건설공사 사후평가 수행결과의 효과적인 분석방법을 제시하고 이를 토대로 시범적인 분석을 수행하였다. 분석은 사후평가 결과가 건설CALS에 입력된 국도, 고속도로, 철도, 항만 등 293건의 건설공사를 대상으로 하였다. 분석결과, 철도 사업의 공사비 증감율이 고속도로, 국도, 항만공사 보다 높게 나타났다. 그리고 고속도로의 공사기간 증감율은 철도, 국도, 항만보다 큰 것으로 나타났다. 본 연구를 통해 제시된 사후평가 분석 프레임워크는 추후 프로젝트에 유용한 정보를 제공하고 벤치마킹 도구로써 유용하며, 지속적인 건설공사 사후평가 수행을 통해 다양한 분석이 가능하다는 점에서 큰 의미가 있다.

토목현장에서의 무인비행장치 기반 현장정보 취득 및 분석 시스템 개발 (UAV-based Construction Site Monitoring and Analysis System Development for Civil Engineering Management)

  • 김창윤;윤준희
    • 대한토목학회논문집
    • /
    • 제42권4호
    • /
    • pp.549-557
    • /
    • 2022
  • 건설 현장, 특히 토목 분야 시공 프로젝트의 경우 다양한 요인에 따라 프로젝트 진척상황을 파악하고 공사/공정을 모니터링 하는데 어려움이 따른다. 본 연구에서는 건설 프로젝트, 특히 토목 시공 프로젝트의 생애주기 중 주요 과정 중 하나인 공사/공정관리 모니터링 단계에서의 무인비행장치의 활용가능성에 대하여 분석하고 그 방법에 대하여 고찰하고자 한다. 먼저, 본 연구에서 도출한 건설 현장의 특징을 극복하기 위하여 공사/공정관리 모니터링 과정에 대하여 먼저 분석을 수행하고, 현재 드론 기기의 특성에 맞는 활용 방법에 대하여 분석을 수행하였다. 이를 바탕으로 하여 토목 현장 관리를 위한 필수 데이터인 정사영상 및 포인트 클라우드 데이터를 취득하기 위한 시스템을 개발하였으며 시스템 적용가능성에 대한 분석을 수행하였다. 대표적인 토목 현장인 도로 프로젝트를 대상으로 테스트베드를 수행하여 무인비행장치의 현장 활용가능성에 대한 검토 역시 진행하였다. 테스트 베드 수행 결과 개발된 시스템의 건설 현장 관리 적용 가능성 및 실용성을 확인할 수 있었다. 향후 연구에서는 무인비행장치를 활용하여 취득하고 분석한 데이터가 실질적으로 시공/공정 관리 정보로서 활용될 수 있도록 기반을 마련될 수 있도록 제도적, 기술적 보완을 위한 연구가 요구된다.

CONNECTING TECHNOLOGY, INDUSTRY AND RESEARCH: A VERTICAL INTEGRAL PROJECT COURSE FOR BIM EDUCATION OPPORTUNITIES

  • F. H. (Bud) Griffis;Mei Liu;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.252-259
    • /
    • 2013
  • Building Information Modeling (BIM) is utilizing CAD technology in a way that ultimately ties all the components of a building together as objects imbedded with information, and has been changing the way we design and build over the last 20-30 years. In Polytechnic Institute of NYU, there are four BIM courses offered which provide students with different levels of knowledge regarding BIM Technique, BIM Standards, BIM Guideline and Roadmap for Private and Public Implementation, BIM Application in Real Projects, the Cooperation of BIM and IPD for Public Works in New York City. With advanced BIM technology, BIM's integration into the construction process and its incorporation into project delivery systems, especially Integrated Project Delivery (IPD) are the bridges between technology, industry and research. This paper presents an integrated BIM curriculum with three modules: 1) BIM functions and Bid Preparation; 2) Time-Cost Trade-off Analysis; and 3) Problems Solving in BIM/IPD Environment. In this project-based curriculum developed by the common efforts of academia, public agency and industry, the objectives are: (1) to provide the information and skills needed to successfully implement BIM into the construction phase; (2) to identify BIM's role in construction and the project delivery system; (3) to develop a module in conjunction with leading BIM into project delivery system, particularly coordination between BIM and IPD; (4) to connect technology and research into industry. The course assessment was conducted and the results indicate that it is a successful reform in construction management education.

  • PDF

Study on the Influence of Stakeholders in Construction Projects

  • Rajeev, S.;Kothai, P.S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권2호
    • /
    • pp.8-11
    • /
    • 2014
  • The interactions and interrelationships between stakeholders largely determine the overall performance of a construction project, and have the crucial responsibility for delivering a project to successful completion. An important component of stakeholder management is stakeholder analysis. Two case studies are conducted within Kerala (India). The main objective was to carry out stakeholder analysis using stakeholder organiser deluxe software, considering the data's collected from the project execution team using questionnaire. During data collection the key stakeholders were identified, to know how to manage them, their interest, power, attitude level etc, for quality improvement. Analyze the results using the software Stakeholder organizer deluxe and modeling of stakeholders is to be done. Finally validate the models of the projects. These findings may mainly reflect the stakeholder management environment in the respective regions of project implementation.