• Title/Summary/Keyword: Civil Engineering Project

Search Result 1,461, Processing Time 0.024 seconds

The Diagnosis of Work Connectivity between Local Government Departments -Focused on Busan Metropolitan City IT Project - (지자체 부서 간 업무연계성 진단 -부산광역시 정보화사업을 중심으로 -)

  • JI, Sang-Tae;NAM, Kwang-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.21 no.3
    • /
    • pp.176-188
    • /
    • 2018
  • Modern urban problems are increasingly becoming a market mix that can not be solved by the power of a single department and the necessity of establishing a cooperation system based on data communication between departments is increasing. Therefore, this study analyzed Busan metropolitan city's IT projects from 2014 to 2018 in order to understand the utilization and sharing status of departmental data from the viewpoint that cooperation between departments can start from the sharing of data with high common utilization. In addition, based on the results of the FGI(Focus Group Interview) conducted for the officials of the department responsible for the informatization project, we verified the results of data status analysis. At the same time, we figured out the necessity of data link between departments through SNA(Social Network Analysis) and presented data that should be shared first in the future. As a result, most of the information systems currently use limited data only within the department that produced the data. Most of the linked data was concentrated in the information department. Therefore, this study suggested the following solutions. First, in order to prevent overlapping investments caused by the operation of individual departments and share information, it is necessary to build a small platform to tie the departments, which have high connectivity with each other, into small blocks. Second, a local level process is needed to develop data standards as an extension of national standards in order to expand the information to be used in various fields. Third, as another solution, we proposed a system that can integrate various types of information based on address and location information through application of cloud-based GIS platform. The results of this study are expected to contribute to build a cooperation system between departments through expansion of information sharing with cost reduction.

Performance evaluation of hyperspectral bathymetry method for morphological mapping in a large river confluence (초분광수심법 기반 대하천 합류부 하상측정 성능 평가)

  • Kim, Dongsu;Seo, Youngcheol;You, Hojun;Gwon, Yeonghwa
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.3
    • /
    • pp.195-210
    • /
    • 2023
  • Additional deposition and erosion in large rivers in South Korea have continued to occur toward morphological stabilization after massive dredging through the four major river restoration project, subsequently requiring precise bathymetry monitoring. Hyperspectral bathymetry method has increasingly been highlighted as an alternative way to estimate bathymetry with high spatial resolution in shallow depth for replacing classical intrusive direct measurement techniques. This study introduced the conventional Optimal Band Ratio Analysis (OBRA) of hyperspectral bathymetry method, and evaluated the performance in a domestic large river in normal turbid and flow condition. Maximum measurable depth was estimated by applying correlation coefficient and root mean square error (RMSE) produced during OBRA with cascadedly applying cut-off depth, where the consequent hyperspectral bathymetry map excluded the region over the derived maximum measurable depth. Also non-linearity was considered in building relation between optimal band and depth. We applied the method to the Nakdong and Hwang River confluence as a large river case and obtained the following features. First, the hyperspectal method showed acceptable performance in morphological mapping for shallow regions, where the maximum measurable depth was 2.5 m and 1.25 m in the Nakdong and Hwang river, respectively. Second, RMSE was more feasible to derive the maximum measurable depth rather than the conventional correlation coefficient whereby considering various scenario of excluding range of in situ depths for OBRA. Third, highly turbid region in Hwang River did not allow hyperspectral bathymetry mapping compared with the case of adjacent Nakdong River, where maximum measurable depth was down to half in Hwang River.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

A Study on Setup for Preliminary Decision Criterion of Continuum Rock Mass Slope with Fair to Good Rating (양호한 연속체 암반사면의 예비 판정기준 설정 연구)

  • Kim, Hyung-Min;Lee, Su-gon;Lee, Byok-Kyu;Woo, Jae-Gyung
    • The Journal of Engineering Geology
    • /
    • v.29 no.2
    • /
    • pp.85-97
    • /
    • 2019
  • It can be observed that steep slopes ($65^{\circ}$ to $80^{\circ}$) consist of rock masses were kept stable for a long time. In rock-mass slopes with similar ground condition, steeper slopes than 1 : 0.5 ($63^{\circ}$) may be applied if the discontinuities of rock-mass slope are distributed in a direction favorable to the stability of the slope. In making a decision the angle of the slope, if the preliminary rock mass conditions applicable to steep slope are quantitatively setup, they may be used as guidance in design practice. In this study, the above rock mass was defined as a good continuum rock mass and the quantitative setup criterion range was proposed using RMR, SMR and GSI classifications for the purpose of providing engineering standard for good continuum rock mass conditions. The methods of study are as follows. The stable slope at steep slopes ($65^{\circ}$ to $80^{\circ}$) for each rock type was selected as the study area, and RMR, SMR and GSI were classified to reflect the face mapping results. The results were reviewed by applying the calculated shear strength to the stable analysis of the current state of rock mass slope using the Hoek-Brown failure criterion. It is intended to verify the validity of the preliminary criterion as a rock mass condition that remains stable on a steep slope. Based on the analysis and review by the above research method, it was analyzed that a good continuum rock mass slope can be set to Basic RMR ${\geq}50$ (45 in sedimentary rock), GSI and SMR ${\geq}45$. The safety factor of the LEM is between Fs = 14.08 and 67.50 (average 32.9), and the displacement of the FEM is 0.13 to 0.64 mm (average 0.27 mm). This can be seen as a result of quantitative representation and verification of the stability of a good continuum rock mass slope that has been maintained stable for a long period of time with steep slopes ($65^{\circ}$ to $80^{\circ}$). The setup guideline for a good continuum rock mass slope will be able to establish a more detailed setup standard when the data are accumulated, and it is also a further study project. If stable even on steep slopes of 1 : 0.1 to 0.3, the upper limit of steep slopes is 1 : 0.3 with reference to the overseas design standards and report, thus giving the benefit of ensuring economic and eco-friendlyness. Also, the development of excavation technology and plantation technology and various eco-friendly slope design techniques will help overcome psychological anxiety and rapid weathering and relaxation due to steep slope construction.

Characteristics of Unconfined Compressive Strength of Dredged Clay Mixed with Friendly Soil Hardening Agent (준설토와 친토양 경화재 혼합지반의 일축강도특성)

  • Oh, Sewook;Yeon, Yonghum;Kwon, Youngcheul
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.10
    • /
    • pp.73-81
    • /
    • 2016
  • In the construction on low strength and high compressible soft ground, the many problems have been occurred in recent construction project. therefore, the soil improvement have been developed to obtain high strength in relatively short period of curing time. Based on the laboratory tests using undisturbed marine clay, the effect of improvement on soft ground was estimated. Deep mixing method by cement have been virtually used for decades to improve the mechanical properties of soft ground. However, previous researches set the focus on the short term strength the about 10% of cement treated clay. In this paper, cement and Natural Soil Stabilizer (NSS) were used as the stabilizing agent to obtain trafficability and mechanical strength of the soft clay. Based on the several laboratory tests, optimum condition was proposed to ensure the mechanical strength and compressibility as the foundation soil using cement and NSS mixed soil. Finally, research data was proposed about the applicability of NSS as the stabilizing agent to soft clay to increase the mechanical strength of soil.

A Study on the Evaluation Method of Close-to-Nature Stream Improvement Works (자연 친화적인 하천 정비사업의 평가방법에 관한 연구)

  • Kim, Seok-Gyu;Kim, Chul
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.7
    • /
    • pp.503-510
    • /
    • 2007
  • In the area of such a nature-friendly stream improvement, it is not established yet which engineering method is suitable for stream environment, due to lack of technology. Therefore, although nature-friendly stream improvement was done with expensive engineering method, the effect has not been fully confirmed, which results from the absence of overall valuation tool of stream improvement. In this regard, it is necessary to develop and apply comprehensive and diverse valuation methods covering stream functions to the analysis of stream improvement. In this study, we collected data from years' of monitoring on the Gyeongcheon river, which is located in Sunchang-eup, Jeollabuk-do and recently underwent an nature-friendly stream improvement work. Based on the data, we developed a series of valuation methods such as stream naturalness evaluation, life cycle evaluation, amenity evaluation, and economic benefit analysis to consider the environmental function of stream from a comprehensive perspective. Stream naturalness evaluation is a quantitative analysis of how natural a stream is, and includes additional valuation items such as ecosystem and water quality for the purpose of overall valuation, unlike existing research focusing on physical elements and structural characteristics of a stream. We developed a method of stream valuation with life cycle assessment to river reorganization project. Amenity evaluation method was developed as a means to analyze residents' satisfaction with stream improvement through questionnaires. Economic benefit analysis was developed as a means to determine the attributes of environmental water supply, ecosystem, river maintenance, and water quality and predict economic benefits using contingent valuation method (CVM) and multi-attribute utility analysis (MAUA) method in order to analyze economic benefits brought in by stream improvement. It is considered that the four methods developed in this study make possible to conduct an overall and quantitative analysis of stream improvement.

An Analysis and Improvement of Free Form Building's Construction Productivity - Focused on Exposed Concrete Work - (비정형 건축물 공사의 생산성 분석 및 향상방안 - 노출콘크리트 공사를 중심으로 -)

  • Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.38-46
    • /
    • 2014
  • The Global's top five Design Firms selected from BauNetz a German architectural magazine in 2007 designed free form building design which was 25% of the overall design by 2006-2010. Free form building is a landmark of the city and the country so its social and economic impacts are very large. In case of Korea, free form buildings such as Tribowl in Incheon, KINTEX Exhibition hall 2 and Dongdaemun Design Plaza have increased. However, those the increase in design trends and, the needs due to the lack of free form building design and construction management experience, free form building projects can't be expected to profitability and have a number of problems after completion. Especially, there are many excessive quality problems and the rising cost due to design changes frequently and lack of experience and data. Thus an initial plan regardless of considering of free form building's characteristics can be a huge risk because of the difference with the plan and actual projects, yet there aren't free form building project's performance data and case studies related to productivity. In this study, through selection of low-construction productivity works and an analysis of the work process and productivity data, hope to propose an actual field productivity of free form building and the ways to improve productivity.

Development of A Quantitative Risk Assessment Model by BIM-based Risk Factor Extraction - Focusing on Falling Accidents - (BIM 기반 위험요소 도출을 통한 정량적 위험성 평가 모델 개발 - 떨어짐 사고를 중심으로 -)

  • Go, Huijea;Hyun, Jihun;Lee, Juhee;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.15-25
    • /
    • 2022
  • As the incidence and mortality of serious disasters in the construction industry are the highest, various efforts are being made in Korea to reduce them. Among them, risk assessment is used as data for disaster reduction measures and evaluation of risk factors at the construction stage. However, the existing risk assessment involves the subjectivity of the performer and is vulnerable to the domestic construction site. This study established a DB classification system for risk assessment with the aim of early identification and pre-removal of risks by quantitatively deriving risk factors using BIM in the risk assessment field and presents a methodology for risk assessment using BIM. Through this, prior removal of risks increases the safety of construction workers and reduces additional costs in the field of safety management. In addition, since it can be applied to new construction methods, it improves the understanding of project participants and becomes a tool for communication. This study proposes a framework for deriving quantitative risks based on BIM, and will be used as a base technology in the field of risk assessment using BIM in the future.

Design Strategies and Processes through the Concept of Resilience (리질리언스 개념을 통해서 본 설계 전략과 과정)

  • Choi, Hyeyoung;Seo, Young-Ai
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.5
    • /
    • pp.44-58
    • /
    • 2018
  • Cities face new challenges not only in natural disasters by climate change but also in social and economic fluctuations. With the existing simple reconstruction method, it is difficult to solve the overall problems that a city or region may face. As a new approach to cope with various changes, the concept of resilience is emerging. Resilience is also one of the themes of recent major urban design projects. Design with the concept of resilience is a new strategy that can deal with various changes of urban space, rather than a temporary trend. The purpose of this paper is to explore the design method by analyzing cases where the concept of resilience is employed. We aim to examine what kind of design strategies are needed for the resilience design and how this design process differ in character, as compared to general design projects. Cases for this study include the "Rebuild by Design" competition held in 2013 and the "Resilient by Design/Bay Area Challenge" competition held in 2017. This paper consists of literature reviews and case studies. The latter is divided into two aspects: content analysis based on the theory of resilience and characteristics of the design process. Cases are analyzed through literature reviews and process characteristics of resilience design in response to the general design process. The main categories for urban resilience used as the framework for analysis include: Urban Infrastructure, Social Dynamics, Economic Dynamics, Health and Wellbeing, Governance Networks, and Planning and Institutions. As a result, the aspects of resilience concepts considered and design strategies undertaken by each team were identified. Each team tried to connect all 6 categories to their design strategies, placing special value on the role of governance, a system that enables collaborative design and project persistency. In terms of the design process, the following characteristics were found: planning the whole project process in the pre-project phase, analyzing predictable socioeconomic risk factors in addition to physical vulnerabilities, aiming for landscape-oriented integrated design, and sustainable implementation strategies with specific operations and budget plans. This paper is meaningful to connect the concept of resilience, which has been discussed in various articles, to design strategy, and to explore the possibility of constructing a practical methodology by deriving the characteristics of the resilience design process. It remains a future task to research design strategies that apply the concept of resilience to various types of urban spaces, in addition to areas that are vulnerable to disasters.

Comparing Laboratory Responses of Engineered Emulsified Asphalt and Foamed Asphalt Mixtures for Cold In-place Recycling Pavement (현장 상온 재생 아스팔트 포장을 위한 고점착 유화 아스팔트 혼합물과 폼드 아스팔트 혼합물의 반응특성 비교)

  • Kim, Yong-Joo Thomas;Lee, Ho-Sin David
    • International Journal of Highway Engineering
    • /
    • v.12 no.1
    • /
    • pp.79-86
    • /
    • 2010
  • Cold in-place recycling (CIR) using emulsified asphalt or foamed asphalt has become a more common practice in rehabilitating the existing asphalt pavement due to its cost effectiveness and the conservation of paving materials. As CIR continues to evolve, the engineered emulsified asphalt was developed to improve the field performances such as coating, raveling, retained stability value and curing time. The main objective of this research is to compare the laboratory responses of the engineered emulsified asphalt (CIR-EE) mixtures against the foamed asphalt (CIR-foam) mixtures using the reclaimed asphalt pavement (RAP)materials collected from the CIR project on U.S. 20 Highway in Iowa. Based on the visual observation of laboratory specimens, the engineered emulsified asphalt coated the RAP materials better than the foamed asphalt because the foamed asphalt is to create a mastic mixture structure rather than coating RAP materials. Given the same compaction effort, CIR-EE specimens exhibited lesser density than CIR-foam specimens. Both Marshall stability and indirect tensile strength of CIR-EE specimens were about same as those of CIR-foam specimens. However, Marshall stability and indirect tensile strength of the vacuum-saturated wet specimens of CIR-EE mixtures were higher than those of CIR-foam mixtures. After four hours of curing in the room temperature, the CIR-EE specimens showed less raveling than the CIR-foam specimens. On the basis of test results, it can be concluded that the CIR-EE mixtures is less susceptible to moisture and more raveling resistant than CIR-foam mixtures.