In this paper, the lessons and learns are introduced from the result of the trial project which is the first CBTC(Communication Based Train Control System) at Korail Bundang Line. This project has started end of 2002 and finished recently by Samsung SDS. The main purpose of this project was that new technology was seek for next generation of railway signal control system adapted in Korea. In 2002, there was no any revenue service system using Radio Frequency CBTC in the world at that time. Just a few trial project was on going in USA and EU. In well developed cities, the metro system have been built and old enough therefore they have to be considering re-signalling their existing system with advanced system for increasing availabilities of line usage and safety. This Bundang Line Trial Project was the first Korean CBTC project for above reasons. Most sub systems have been developed using local technology such as Electronics Controlled Interlocking System and Track Circuit Systems etc. Specially, in this project the RF-Communication devices are developed by local technology using DSSS(Direct Sequency Spread Spectrum) instead of FHSS(Frequency Hopping Spread Spectrum). This project has lasted for more than five years originally planned for three years because it was only accessible only night time in the main line from Ori to Suseo about 20km long. Each night only 2 and half hours are available to use the main line. Now the trial project has been done successfully with meet the customer's requirement, therefore the upgrade the mainline of Bundang line and another extension area up to Wangsipli to make revenue service using this new technology. This paper shows this result of the trial project and the strategy of upgrade and extension project as well.
Choi Jun Kyun;Kim Nak Myeong;Kim Hyung Soon;Un Chong Kwan;Im Gi Hong;Cho Young Jong;Cho Dong Ho
Journal of the Korean Institute of Telematics and Electronics
/
v.23
no.1
/
pp.1-9
/
1986
This is the third part of the four-part paper describing the development of a packet-switched computer communication network named the KORNET. In this paper we describe the design and implementation of the X.25 protocol connecting packet mode data terminal equipments(PDTE's) with data circuit terminating equipments(DCE's). In the KORNET, the X.25 protocol has been implemented on the line processing module-A(LPMA) of the network node processor(NNP). In the implementation of X.25, we have divided the software module according to the service function, and have determined the the rules that interact between the modules. Each layer protocol has been developed using the technique of the finite state machine. Before the actual coding of softwares, we hafve used formal software development tools based on the specification and description language (SDL) and program design languate (PDL) recommended by the CCITT. In addition, for the efficient operation of the X.25 protocol system we have analyzed the system performance and the service scheduling method of each module. The results will also be given.
Expectations for wireless communication technology are rising as a base technology that promotes innovation in various industries in line with the paradigm of digital transformation in the 21st century beyond the stage of being used only for communication service itself. In this study, in order to compare 6G technological competitiveness between Korea and leading countries, technological competitiveness was confirmed through PFS, CPP, and network analysis based on GaN Integrated Circuit patent data. Korea's 6G technological competitiveness was 0.62 in PFS and 3.93 in CPP, which were 32.8% and 19.9%, respectively, compared to leading countries. In addition, as a result of network analysis, the collaboration rate in the 6G field was 7.2%, and the collaboration ecosystem was very insufficient in most countries. In contrast, it was confirmed that Korea, unlike leading countries, has established a small-scale collaboration ecosystem linked by industry and academia. Thus, it is necessary to establish a strategy for 6G communication technology at the national level so that communication technology can be advanced based on a relatively well-established collaborative ecosystem.
The physical infrastructure of the power systems, including the high-voltage transmission towers and lines as well as the poles and wires for power distribution at a lower voltage level, is critical for the resilience of the community since the failures or nonfunctioning of these structures could introduce large area power outages under the extreme weather events. In the current engineering practices, single circuit lattice steel towers linked by transmission lines are widely used to form power transmission systems. After years of service and continues interactions with natural and built environment, progressive damages accumulate at various structural details and could gradually change the structural performance. This study is to evaluate the typical existing transmission tower-line system subjected to synoptic winds (atmospheric boundary layer winds). Effects from the possible corrosion penetration on the structural members of the transmission towers and the aerodynamic damping force on the conductors are evaluated. However, corrosion in connections is not included. Meanwhile, corrosion on the structural members is assumed to be evenly distributed. Wind loads are calculated based on the codes used for synoptic winds and the wind tunnel experiments were carried out to obtain the drag coefficients for different panels of the transmission towers as well as for the transmission lines. Sensitivity analysis is carried out based upon the incremental dynamic analysis (IDA) to evaluate the structural capacity of the transmission tower-line system for different corrosion and loading conditions. Meanwhile, extreme value analysis is also performed to further estimate the short-term extreme response of the transmission tower-line system.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.12
/
pp.546-554
/
2019
Typically, closed-circuit television (CCTV) monitoring is mainly used for post-processes (i.e. to provide evidence after an incident has occurred), but by using a streaming video feed, machine-based learning, and advanced image recognition techniques, current technology can be extended to respond to crimes or reports of missing persons in real time. The multi-CCTV cooperation technique developed in this study is a program model that delivers similarity information about a suspect (or moving object) extracted via CCTV at one location and sent to a monitoring agent to track the selected suspect or object when he, she, or it moves out of range to another CCTV camera. To improve the operating efficiency of local government CCTV control centers, we describe here the partial automation of a CCTV control system that currently relies upon monitoring by human agents. We envisage an integrated crime prevention service, which incorporates the cooperative CCTV network suggested in this study and that can easily be experienced by citizens in ways such as determining a precise individual location in real time and providing a crime prevention service linked to smartphones and/or crime prevention/safety information.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.11
/
pp.711-717
/
2017
The railway is a public transportation system that provides large-scale passenger transportation and service, whose reliability and safety is the top priority. The wiring of railway vehicles is classified into train control lines (train lines) and communication lines. The train lines are used for input / output signals related to vehicle driving and safety functions, and the communication lines are used for the input / output signals for passenger services such as broadcasting. In order to measure the reliability of railway vehicles, a train line is applied to the input / output interface of the control signals between the electric control devices in the vehicle, and there are many electromechanical devices such as relays and contactors for the control logic. In fact, since the vehicle control circuit is composed of several thousand contacts, it is difficult to check for errors such as contact failure, and it is impossible to check the real-time status, so a lot of manpower and time is required for regular maintenance. Therefore, we analyze the current state of the train line design of the electric equipment used for driving and services in domestic railway cars and propose three wiring reduction methods to improve it. Based on the analysis of domestic electric vehicles, it was confirmed that the wiring reduction effect is 35% or more.
Journal of the Korea institute for structural maintenance and inspection
/
v.25
no.4
/
pp.28-36
/
2021
It is known that buried rebars inside concrete structures are protected from corrosion due to passive layer. It is very important to delay the timing of corrosion or evaluate a detection of corrosion initiation for the purpose of cost-beneficiary service life of a structure. In this study, corrosion monitoring was performed on concrete specimens considering 3 levels of cover depth(60 mm, 45 mm, and 30 mm), W/C(water to cement) ratio(40.0%, 50.0%, and 60.0%) and chloride concentration(0.0%, 3.5%, and 7.0%). OCP(Open Circuit Potential) was measured using agar-based socket type sensors. The OCP measurement showed the consistent behavior where the potential was reduced in wet conditions and it was partially recovered in dry conditions. In the case of 30 mm of cover depth for most W/C ratio cases, the lowest OCP value was measured and rapid OCP recovery was evaluated in increasing cover depth from 30 mm to 45 mm, since cover depth was an effective protection against chloride ion ingress. As the chloride concentration increased, the effect on the cover depth tended to be more dominant than the that of W/C ratio. After additional monitoring and physical evaluation of chloride concentration after specimen dismantling, the proposed system can be improved with increasing reliability of the corrosion monitoring.
The Journal of Korean Institute of Communications and Information Sciences
/
v.12
no.1
/
pp.71-81
/
1987
To fuly utilize the availability of the ISDN, it is very important to develop the ISDN user terminals which can provide various user services. In this paper, the basic concept of the ISDN user terminal is briefly studied and, based on this study, a stimulus type digital telephone which can be connected directly to the ISDN is designed. This digital telephone can provide the basic voice service and has general functions such as voice encoding / decoding(PCM is used), user-network signalling, digital tone supply, channel selection, key pad and atatus display. Echo cancellation method is adopted for the digital subscirber loop transmission and user-network signalling is implemented according to the LAPD(Link Access Procedure on D-channel) protocol recommended by the CCITT's recommendations I.440-I.441. The validity of designed S/W and H/W functions are verified by testing them with ISDN circuit switching emulator described in the first part of this paper.
This paper presents the design and development of network for housing estate security system. The system can cover up to 961 houses which can be up to 1,200 meters long transfer rate of 9,600 bps. This system uses checking and warning the abnormal situation. More over this system has ability to control switch on/off the electrical equipment in the house via AC line control system. The system consists of 4 parts. The first part is a security system of each house using MCS-51 microcontroller as a central processing unit scan 32 sensors and control 8 appliances and send alarm. The MCS-51 microcontroller received control signal via telephone used DTMF circuit. The second part is distributed two levels master/slave network implementing after RS-485 serial communication standard. The protocol its base on the OSI (Open Systems Interconnection) 7 layers protocol model design focus on speed, reliability and security of data that is transferred. The network security using encrypt by DES algorithm, message sequence, time stamp checking and authentication system when user to access and when connect new device to this system. Flow control in system is Poll/Select and Stop-and-Wait method. The third part is central server that using microcomputer which its main function are storing event data into database and can check history event. The final part is internet system which users can access their own homes via the Internet. This web service is based on a combination of SOAP, HTTP and TCP/IP protocols. Messages are exchanged using XML format [6]. In order to save the number of IP address, the system uses 1 IP address for the whole village in which all homes and appliance in this village are addressed using internal identification numbers. This proposed system gives the data transfer accuracy over 99.8% and maximum polling time is 1,120 ms.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.24
no.12
/
pp.1113-1119
/
2013
In this letter, a new approach is proposed for the design of a multi antenna for MIMO wireless devices. The proposed antenna covers various LTE(Long Term Evolution) service bands: band 17(704~746 MHz), band 13(746~787 MHz), band 5(824~894 MHz), and band 8(880~960 MHz). The proposed main antenna consists of a conventional monopole antenna with an inverted L-shaped slit for wideband operation. The proposed the LTE sub antenna is based on a switch loaded loop antenna structure, with a resonance frequency that can be controlled by capacitance of a logic circuit. The tuning technique for the LTE Rx antenna uses a RF MEMS(Micro-Electro mechanical system) to match the impedances to realize the bands of interest. Because the two proposed antennas are polarized orthogonally to each other, the ECC(Envelope Correlation Coefficient) characteristic between two antennas was measured to be very low (below 0.06) with an isolation characteristic below -20 dB between the two antennas in the operating overall LTE bands. The proposed antenna is particularly attractive for mobile devices that integrate LTE multiple systems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.