• Title/Summary/Keyword: Central Building

Search Result 691, Processing Time 0.024 seconds

Assessment of Public Engagement Approach in Various Project Stages: The Case Study of Central Market, Hong Kong

  • Wong, Crystal;Chan, Icy;Lam, Lily;Zayed, Tarek;Sun, Yi
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.267-277
    • /
    • 2020
  • The present research evaluates the public engagement approach in various project stages. Hong Kong had long been criticized as top-down and executive-led jurisdiction by overlooking the importance of cultural heritage and public concerns on public projects. It was suggested to the government to engage public and provide sufficient public consultation. Thereby, the government announced a series of revitalization and conversion measures in Policy Address in 2008. To carry out the measures, there were voices, because of diverse and sometimes conflicting interests, over the effect of revitalization project. On the other hand, studies reveal that there are benefits of revitalization and enhancement of public engagement approach. In pursuit of the subject, the present research aims at studying the Central Market as a case study pilot project. In October 2009, the Policy Address announced that the Central Market be revitalized. Tasked to implement the project, Urban Renewal Authority (URA) continued to adopt the people-oriented approach as the guiding principle in its core business and in heritage preservation and revitalization so as to create a sustainable development. Between government and the public, URA acts as a bridge for communication. As between URA and the public, URA conducted public consultation, set up an ad-hoc committee in January 2016 to be in charge of the project and will continuously inform the government and public with the updates and project progress. The main objectives of the present research are to assess the advantages and challenges in different stages of public engagement approach, to evaluate the engagement system, to give a comprehensive view for participation of stakeholders, and to find out effective strategies to enhance civil engagement. Research was achieved through interviews to key persons in the project, questionnaire that was distributed to community and experts in the field. Case Study of the Central Market was studied and investigated using different sources, such as newspapers, journals, etc, to evaluate the degree of public engagement in the project. Both detailed qualitative methodological approaches of interview, questionnaire, and case study, act as a synergy to demonstrate the research objectives and provide the comprehensive perceptions on the revitalization project. The results show that public participants in revitalized project have generated considerable value enhancements to social-cultural, environmental, political and economic aspect. This study provides valuable insights that the public participation can make positive contribution to sustainability in the city. The findings indicate that no any single system is flawless therefore seeking both public opinions and professional advices are also important as a comprehensive approach to achieve higher sustainability of the building.

  • PDF

Derivation of preliminary derived concentration guideline level (DCGL) by reuse scenario for Kori Unit 1 using RESRAD-BUILD

  • Park, Sang June;Byon, Jihyang;Ban, Doo Hyun;Lee, Suhee;Sohn, Wook;Ahn, Seokyoung
    • Nuclear Engineering and Technology
    • /
    • v.52 no.6
    • /
    • pp.1231-1242
    • /
    • 2020
  • The Kori Unit 1 will be decommissioned after a permanent shutdown in June 2017. South Korea has a 0.1 mSv/yr exposure limit standard for limited or unlimited site release. This is South Korea's first commercial NPP; therefore, if the containment building is reused as a memorial hall, it will contribute to the improvement of public understanding and enhance the public's acceptance of NPPs. Also, existing Kori Unit 1 nuclear power plant manpower resources can be reused after decommissioning and resident staff and memorial hall visitors can activate nearby commercial areas. Therefore, such a reuse scenario may also prevent an economic recession. The exposure dose was calculated using the following scenarios: worker in the containment building, visitor in the containment building, and worker in buildings other than the containment building. The exposure dose in the buildings was calculated by the RESRAD-BUILD developed by the Argonne National Laboratory (ANL). The preliminary exposure dose and derived concentration guideline level (DCGL) were derived.

The Architectural Structure of Seonjeong-jeon in Changdeok Palace as a Ceremonial Hall (창덕궁 선정전의 의례 공간적 건축 구조)

  • Lee, Jong-Seo
    • Journal of architectural history
    • /
    • v.29 no.2
    • /
    • pp.39-52
    • /
    • 2020
  • Seonjeong-jeon, the semi-great hall in Changdeok Palace, was constructed in a highly formal and conservative style and accommodated official ceremonies. However, the contemporary modification of the building has distorted or eliminated features including the two side doors on the front, the floor coverings, and the throne base (Jwa-tap) that consisted the most significant part of the throne. Seonjeong-jeon originally had three doors that stood between each pair of columns on the front side, respectively. The courtiers accessed the building through the side doors, while the central door was exclusively designated for the king. However, the renovation in 1999 ignored the political context of the architectural form of the building and changed the side doors into windows, damaging the traditional structure inherited from the early Joseon Dynasty. Although the building currently has traditional wooden floor structure (Woomul-maru), it was originally covered with square brick tiles (Bang-jeon) before the Japanese occupation, following the customs of early Joseon Dynasty. The throne was placed to the north of the central door and consisted of the throne base and a decorative roof (Dang-ga). A canvas (Jang-ja), which featured the royal symbolic painting of Sun, Moon, and Five Peaks, was also installed between the two columns that connected the base and the roof. Nevertheless, only the columns and the blank canvas remain nowadays after the removal of the base.

Fire Risk by Type of Building Exterior Material through Fire Cases (화재사례를 통한 건축물 외장재 종류별 화재발생위험성)

  • Lee, Jeong-Il;Kweon, Young-Hee
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.155-161
    • /
    • 2022
  • Recently, the number of cases of fire spreading due to exterior materials of buildings is increasing. Due to the nature of modern architecture, which emphasizes the aesthetics of buildings, because buildings pursue a splendid appearance, they are inexpensive and have relatively good insulation performance, but an increasing number of buildings are adopting insulation materials that have poor fire safety performance. The risk of spread is also greatly increased. Since the exterior wall of a building is made of a variety of materials and structures, it is composed of a combination of several elements, including materials such as insulation and finishing materials. Therefore, it was determined that it was necessary to introduce a more systematic evaluation method for building exterior materials, and to improve the system reflecting this, away from the existing evaluation method that only checked the fire safety performance of finishing materials.

Dynamic characteristics monitoring of a 421-m-tall skyscraper during Typhoon Muifa using smartphone

  • Kang Zhou;Sha Bao;Lun-Hai Zhi;Feng Hu;Kang Xu;Zhen-Ru Shu
    • Structural Engineering and Mechanics
    • /
    • v.87 no.5
    • /
    • pp.451-460
    • /
    • 2023
  • Recently, the use of smartphones for structural health monitoring in civil engineering has drawn increasing attention due to their rapid development and popularization. In this study, the structural responses and dynamic characteristics of a 421-m-tall skyscraper during the landfall of Typhoon Muifa are monitored using an iPhone 13. The measured building acceleration responses are first corrected by the resampling technique since the sampling rate of smartphone-based measurement is unstable. Then, based on the corrected building acceleration, the wind-induced responses (i.e., along-wind and across-wind responses) are investigated and the serviceability performance of the skyscraper is assessed. Next, the amplitude-dependency and time-varying structural dynamic characteristics of the monitored supertall building during Typhoon Muifa are investigated by employing the random decrement technique and Bayesian spectral density approach. Moreover, the estimated results during Muifa are further compared with those of previous studies on the monitored building to discuss its long-term time-varying structural dynamic characteristics. The paper aims to demonstrate the applicability and effectiveness of smartphones for structural health monitoring of high-rise buildings.

Approaching Green Buildings Using Eco-Efficient Construction Materials: A Review of the state-of-the-art

  • Aghdam, Karim Aligholizadeh;Rad, Alireza Foroughi;Shakeri, Hamed;Sardroud, Javad Majrouhi
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.3
    • /
    • pp.1-23
    • /
    • 2018
  • Since the protection the of human being from natural disaster and atmospheric factors have become an essential requirement, some attempts have been taken place to provide shelter and create a safe environment to a more comfortable life with welfare. For this purpose, using existing resources in nature and exploiting them in a different manner have been taken into account. Initially, the performed exploitations for construction had the least damage to the environment, but over time and as a result of population growth, aggressive exploitation of nature has led to destroying effects on the environment and resulted in consequences such as pollution and environmental destruction. Thus, the construction industry has been identified as the top pollutant factors of the environment. Among various construction factors, the building materials used in this industry are considered as the most important effective factors on the environment, as they have direct influences on the environment from the beginning of construction of the final steps. This research focuses on the review of the most of the existing green materials definitions and various approaches towards using eco-efficient construction materials. It presents and discusses possible ways of reducing the destructive effects on the environment by selecting and using green materials, review current literature and highlight the necessity of applying such materials in future constructions in all communities. This paper provides a base for this purpose that sustainable development communities and environment is realized by elimination of environmental pollution and approaching the criteria of green building by using sustainable materials.

해외작품

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.7 s.101
    • /
    • pp.59-79
    • /
    • 1977
  • PDF

A Study on Sunshine Environment with Different Distance between Buildings (인동간격에 따른 일조환경에 대한 연구)

  • 최용석;최지혜;김용식
    • Journal of the Korean housing association
    • /
    • v.15 no.2
    • /
    • pp.55-62
    • /
    • 2004
  • Apartment design in residential Area is restricted by building distance limit code. Building distance limit decreases gradually to the 0.8H(height), and residential area has 250% site area ratio by building code, so site using has become efficient. In this study, examine the relationship between present building distance limit and right of daylighting environment by computer simulation. As well, high-rise residential officetel and multipurpose residential building becomes increase in commercial non-residential area. In the domestic, residential type multipurpose building made at the business area or central business area has 400∼800% site area ratio by building code. However, at a dweller's point of view, there are much lacks of environmental consideration to provide suitable daylighting environment. And, POE: Post Occupancy Evaluation is not completed yet. In this study, however, progress architectural environment prediction, basis by right of daylighting, and examine the possibility of daylighting by architectural distance limit code in residental area and by high-rise, high-density residential building in non-residental downtown area.

A Study on Securing Safety of Evacuation through Smoke Control in Case of Fire at the Central Corridor Type Intelligent Buildings (중복도형 인텔리전트빌딩 화재시 연기제어를 통한 피난안전성 확보에 관한 연구)

  • Min, Se Hong;Lee, Jae Moon;Bae, Yeon Jun
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.117-127
    • /
    • 2015
  • This study investigated the smoke blocking and control systems for the safety of residents evacuation and for the prevention of smoke spread through the central corridor in the event of central corridor type of intelligent building fire. We offered additional ways of utilizing smoke ventilators and intake ventilation equipment and utilized CFD-based fire simulation program(FDS Ver.5.5.3) in order to analyze the effect. As a result, many differences in the smoke block effect, depending on the application of smoke ventilator and location of installation, was found. In addition, the result was found that larger effect was showed not in the case of application of smoke ventilator in central corridor only but application in fire room. The reason is that the smoke leakage is blocked primarily as air is flowed in the fire room through open door by operation of intake smoke ventilator in the public corridor and secondarily, the smoke leakage to the public corridor could be blocked as fire and smoke were released to the opened smoke ventilator continuously. Especially, the effect was maximized through complex interactions by applying smoke ventilator and intake ventilation equipment in corridor together rather than applying smoke ventilator and intake ventilation equipment independently. The proposed measure through this study shall be considered from architectural plan as one of ways for blocking from smoke spread to the central corridor in the central corridor type of intelligent building. In addition, flaws on regulation shall be established and supplemented.