Content Analysis of Main National Environmental Dispute Cases from Five Recent Years (최근 5년간 주요 중앙환경분쟁조정 사건의 내용 분석)

  • Park, Jeong-Ho;Yang, Sung-Bong
    • Journal of Environmental Science International
    • /
    • v.25 no.7
    • /
    • pp.989-998
    • /
    • 2016
  • In this study, we analyzed the content and compensation factors of 337 cases of national environmental disputes from five recent years (2000~2014). Causes of damage were noise-vibration in 234 cases (69%), sunlight in 48 cases (14%), air pollution in 19 cases (6%), water pollution in 15 cases (4%), odor in 13 cases (4%), and others factors in 8 cases (3%). Sources of damage were construction in 224 cases (66%), structures in 36 cases (11%), vehicle on road in 31 cases (9%), industry in 18 cases (5%), environmental facility in 11 cases (3%), livestock facility in 6 cases (2%), and other sources in 11 cases (3%). From the results of logistic regression analysis, important factors associated with compensation were found to be damage amount, damage distance, zoning districts, source, and administrative disposition.

Study about the Status and Prevention of Oriental Medical Disputes (한방의료분쟁의 현황과 예방에 대한 연구)

  • Lee, Eun-Sol;Oh, Ji-Yun;Cho, Hyun-Seok;Kim, Kyung-Ho;Lee, Seung-Deok;Kim, Kap-Sung;Kim, Eun-Jung
    • The Journal of Korean Medicine
    • /
    • v.35 no.1
    • /
    • pp.58-67
    • /
    • 2014
  • Objectives: The purpose of this study was to analyze the current status of legal disputes in the Oriental medical clinics and hospitals in South Korea, and to suggest their possible solutions. Methods: Legal dispute cases advised by the Association of Korean Medicine from January 2005 to April 2012 were collected and analyzed. Results: 196 Oriental medical dispute cases were analyzed for the study. Problems in musculoskeletal system and connective tissues (37 cases) were the most common cause of Oriental medical disputes. As per treatment methods related to the dispute, acupuncture (66 cases) and herbal medicine (63 cases) were indicated as the two most common causes. The most common initial problems the patients had at the beginning of their treatment were musculoskeletal system and connective tissues problems (87 cases). Out of 196 dispute cases, only 49 were found to be the fault of Oriental medical doctors. Conclusions: This study can be used as a basis to prevent possible Oriental medical disputes. Subsequent studies should be based on a more comprehensive and extensive range of data.

A Cost Reduction Effects Analysis on Automatic Operation of Light Rail (경량전철 무인자동운전의 비용 절감 효과 분석)

  • 민재홍
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.63-70
    • /
    • 2000
  • Light Rail is highlighted for its construction cost and operation & maintenance cost in Korea. However, lack of analysis on driverless operation effect causes many disputes. In this paper, using latest driverless operation cost data. analysed cost reduction effect of it, with comparing present KNR's metropolitan subway signal system. It showed there is enough economic appropriateness B/C 1.241 on interest rate 6%, 1.076 on 8% and 0.943 on 10%, though it couldn't include passenger travel time value.

  • PDF

Factors Affecting Timely Completion of Construction Projects in Nepal

  • Acharya NirmalKumar;Lee Young-Dai;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.254-257
    • /
    • 2003
  • It is common to experience delays during construction projects. Delays can ca use substantial damages to an owner as well as contractors and is the sources of frequent disputes and claims. Many studies have been carried out to assess the causes of delays in construction projects. They are found to be almost similar, except some prevailed local condition. Most of the common construction delay factors are attributed to design faults, incompetent contractor, lack of team accountability etc. To minimize or eliminate the delay we have to follow the recognized fundamental principles of management such as: cost-time relationship, time priority, accountability, rewards, innovative thinking etc. The root causes of delays found out in this paper are not so much different than other previous study. If the implementing agencies properly followed the, fundamental management principles and some other related corrections as recommended in the paper, much construction delays can be avoided.

  • PDF

CASE STUDY: CONSTRUCTION LITIGATION FOR THE U.S. NAVAL FACILITIES ENGINEERING COMMAND, 1995-2004

  • Lilin Liang;G. Edward Gibson Jr.
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.693-698
    • /
    • 2005
  • Evaluation of construction claims history can provide insights to improvement opportunities in a capital project portfolio. This study analyzed construction litigation claims extracted from the U.S. Court of Federal Claims (COFC) history involving the U.S. Naval Facilities Engineering Command (NAVFAC) from 1995-2004. Twenty-four total cases were examined over this period. Both "primary" causes and "root" causes were identified and compared to 666 litigation cases reviewed by the Armed Services Board of Contract Appeals (ASBCA). Based on the analysis, strategies for resolving future disputes are recommend using a 'hybrid' process prior to litigation.

  • PDF

Investigation of Disputes for Nominated Sub-contractor(NSC) -Focused on the Judicial Precedent of NSC issues in Singapore, Malaysia and Hong Kong- (아시아 건설 시장에서의 지정하도급자(NSC)문제에 관한 연구 - 싱가포르, 말레이시아 그리고 홍콩의 판례를 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun;Kim, Youngsuk;Lee, Boknam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.112-123
    • /
    • 2015
  • Many disputes are happened with various causes in overseas construction projects. One of major disputes is closely related with nominated subcontractors (NSC). This paper investigates 30 judical precedents for Singapore, Malaysia and Hongkong to analyze the detailed disputes related with the NSC, and then the judical precedents are classified into 6 categories: Delay and Defect Trouble (T1), Contract Relation (T2), Payment Trouble (T3), Set-off (T4), Liquidation (T5) and so forth (T6). According to the analytical results, the frequency of occurrence of disputes is considerably related with social and economical changes, and the dispute between NSC and employer for residential and commercial building projects is the most frequently happened case. As the results of analysis, therefore, it is concluded that the employer needs to response aggressively to the problems related with NSC, and it is also important to make the council for communication among related bodies. Furthermore, the institutional reform that make the role and the responsibility of employer consistent under considering contract terms and conditions is considered as the most important and fundamental issue.

Trade Practice of Surrender Bill of Lading and Prevention of Its Disputes (권리포기 선화증권의 실무관행과 분쟁예방)

  • Choi, Seok-Beom
    • Journal of Arbitration Studies
    • /
    • v.27 no.1
    • /
    • pp.183-203
    • /
    • 2017
  • Two solution approaches have been suggested globally to solve the crisis of bill of lading; that is to say, electronic bill of lading and sea waybill. Electronic bill of lading is not unsettled as a solution to solve the crisis of bill of lading but sea waybill is used on a global basis to do so. The surrendered bill of lading is applied for practical usage instead of sea waybill in a short voyage among Korea, China, and Japan, owing to faster delivery at destination and lower cost than bill of lading. To surrender the original bill of lading, the consignor should submit all originals with a request letter to the carrier of goods with necessary surrender charges, if any, in doing so. Once after receiving the original bills of lading consisting of normally three originals but in some cases five, the carrier stamped "Surrendered" on the front of original bills of lading and sent a message to his counterpart at the port of destination, stating that the original bill of lading surrendered at the port of shipment and the consignee can take delivery of the goods without production of the original bill of lading at destination. The legal regime of the surrendered bill of lading is not settled as it is not considered legally as bill of lading, and the decisions rendered by each nation's courts are different according to the usages of the surrendered bill of lading. The purpose of this paper is to prevent the disputes between parties with regard to the surrendered bill of lading by studying the causes and precautions of disputes in relation to the surrendered bill of lading.

Benchmarking Research Based on Contract Documents for Successful ADR Implementation to Domestic Construction Industry (ADR 활성화를 위한 건설 계약서의 해외 사례 벤치마킹 연구)

  • Choi Jeong-Won;Kim Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.629-633
    • /
    • 2004
  • The number of claims and disputes among project participants has been steadily increasing last a few years and it creates numerous conflicts and problems in the domestic construction industry. One of the root causes of claims and disputes can be explained by the fact that project objectives of participants are offer different and not aligned. This research is considered as a pre-study of developing a strategy to mitigate conflicts such as claims and disputes in the domestic construction industry by utilizing Alternative Dispute Resolution (ADR) techniques. This research focused on improving standard contrast documents to establish a systematic dispute resolution process which emphasize the ADR method. To do so, several well-recognized contract documents developed by FIDIC, AIA, ECC were throughly investigated and analyzed using a benchmarking process. Result of the research propose needs of improving the domestic construction document's some clauses and the details will be further Investigated through surveys and expert's opinions.

  • PDF

Existing Situation and Improvements of Administrative ADR (행정형 ADR의 현황과 개선방안)

  • Kang, Soo-Mi
    • Journal of Arbitration Studies
    • /
    • v.25 no.4
    • /
    • pp.51-75
    • /
    • 2015
  • Administrative ADR to solve new problems has the characteristics of a new project, hence ADR is established and operated with a lack of human and material resources in the process of introducing administrative ADR. Therefore, it is preferred to resolve conflicts by less costly counseling and mutual agreement before mediation. When we try to settle the disputes through administrative ADR at the stage before mediation, it causes problems for the neutrality and impartiality of the dispute settlement procedures. In this case administrative ADR systems should introduce devices that ensure the impartiality of the process. In some issues becoming social problems, relevant administrative agencies are inclined to establish ADR systems. If ADR systems become available, a person who may use ADR services may have some trouble grasping ADR institutions because he/she can hardly distinguish their business affairs. By subdividing administrative affairs, when the disputes have the issues that touch on various fields of the affairs, parties in the disputes have to take ADR procedures one by one in all ADR-related institutions. This may lead to too heavy a burden on the disputing parties, furthermore forcing them to give up the remedies of their rights. For more efficient ADR operations, it is necessary that the institutions which set up and operate ADR systems should actively exchange and cooperate with one another. They need to forge and strengthen the solidarity between administrations and courts. The administrative agencies which run ADR themselves have to build up the devices for preparing human resources and material facilities for administrative ADR.

MITIGATION AND REMISSION OF CONTRACTOR'S DEFECTS LIABILITY IN KOREAN CONSTRUCTION CONTRACTS

  • Jong-Gwang Lee ;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.447-451
    • /
    • 2005
  • The purpose of this study is to improve regulations such as law and standard contract forms related to defects liability in Korea. Defects liability has been one of the major causes of construction contract disputes in Korea in recent years. It is important to avoid or resolve disputes regarding defects liability through regulations containing clear criteria and to specify the standard regarding the mitigation and remission of the contractor's defects liability. This study was carried out through document research and analysis of judicial precedents. The following are the courses of improvement regarding the mitigation and remission of defects liability in Korea. First, laws and standard contract forms must contain more detailed clauses regarding exemption of a contractor's defects liability, which clearly set out the scope of the defects liability of the contractor. Second, the current system for defects liability favors the owner rather than the contractor - it is necessary to change the defects liability system in order to give the owner and the contractor an equal standing. Third, strict liability is taken on by the contractor even when the term of guarantee for defects lasts longer than the legally set period of liability for defects. Hence, it is necessary to improve the system by alleviating the liability of the contractor through applying negligence liability as opposed to strict liability during the term of guarantee.