This paper presents a mettled to reduce the number of conductors of catenary system for estimating line constants. Conductors of a catenary system are grouped and reduced. For example, the model representing the contact and the messenger conductors with a single equivalent conductor is. probably more realistic than assuming the two conductors completely separated, since they are generally connected by droppers every few meters. Therefore, this paper shows the method to reduce the number of conductors using electric circuit theory. To verify the results, we compared the equivalent line constants obtained by proposed method with those obtained by measurement.
The measurement of current collection performance between pantograph and contact wire of overhead catenary system is intended to prove the safety of operation and the quality of the current collection system. The results of interaction performance of current collection system are required for approving with commercial operation on railway lines. The methods of interaction performance of current collection system are defined on interactional standards such as IEC 62486 and EN 50317. In this paper, the interaction performance is evaluated by the percentage of arcing on Honam high-speed line and the results are used for adjustment of the overhead catenary line structure. The experimental results in Honam high-speed line confirm that the duration of an arc lasting longer 25 ms between pantograph and contact wire was depended on the conditions of overhead contact line after installation.
가공송전 도체는 정상 동작조건 하에서 전력회사의 선로 설계지침에 규정된 지상고를 안정범위 내에서 항상 유지할 수 있어야 한다. 따라서 새로운 선로를 건설하거나 노화도체의 장력을 다시 조정하거나 또는 전력용량을 최대화하기 위해 동적송전용량을 모니터링하는 경우에, 도체 이도를 측정/또는 모니터링하는 것은 매우 중요하다. 본 연구에서는 도체의 카테너리 각도로 이도 및 장력을 추정하기 위한 새로운 방법을 제안한다. 가공송전선로의 대부분의 도체들은 전형적인 카테너리 곡선을 나타내므로 철탑 측의 카테너리 각도로부터 도체의 카테너리 곡선을 유일하게 결정할 수 있다. 이 카테너리 곡선을 토대로 도체의 이도나 수평장력을 쉽게 추정할 수 있다. 몇 가지 시뮬레이션과 간단한 실험 결과를 통하여 제안된 방법이 가공송전선의 도체 이도와 장력을 측정/또는 모니터링하는데 효과적으로 사용될 수 있음을 확인하였다.
Dynamic and static behaviors of a three-dimensional catenary system for a high-speed railway are analyzed by using the finite element method. Considering tensions in the contact wire and the messenger wire, we drive the equations of motion for the catenary system. These equations are for the longitudinal, transverse, vertical and torsional motions. After establishing the weak form, the weak forms are spatially discretized with newly defined two-node beam elements. With the discretized equations, a finite element computer program is developed for the static and dynamic analyses. The static deflections of the catenary system, which are important for good contact between the pantograph and the contact line, are computed when the gravity is applied. On the other hand, we analyze the natural frequencies and the corresponding natural modes of the catenary system. The dynamic responses of the system are also investigated when applying a load to the contact line. For verification of the developed finite element program, vibrations of the catenary system are measured and they are compared to computed time responses.
In this paper, we introduce the on-line test of the current collection characteristics for HSR 350x(Korea High Speed Train project) that have been performed in the Kyoung-bu high-speed line since 2002. Through the analysis of measured data during on-line test, the variation trend of contact force between pantograph and contact wire of catenary according to the span type, the track conditions and driving patterns is reviewed. In order to analyze the variation trend of contact force, we have checked the span type of catenary in KP 24 - 125 out of Kyoung-bu high speed line and obtained the statistical processing result per each span type. This study shows that the track conditions do not affect on the dynamic performance between pantograph and contact wire catenary, and the span type and the driving pattern are important factors in determining the good interaction between them.
Subject of the paper is a particular configuration of overhead line, in which noise barrier structure is used as supports of the catenary instead of standard poles. This configuration is foreseen in case the noise barrier position is in conflict with the poles location. If the catenary is supported by the noise barrier, the motion that the latter undergo due to wave pressure associated to train transit is transmitted to the overhead line, so that potentially it influences the interaction between the catenary itself and the pantograph of the passing train. The paper focuses on the influence of such peculiar configuration on the quality of the current collection of high speed pantograph, for single and double current collection. The study has been carried out first with an experimental investigation on the pressure distribution on noise barrier, both in wind tunnel and with in-field tests. Subsequently a numerical analysis of the dynamics of the barrier subjected to the wave pressure due to train transit has been carried out, and the output of such analysis has been used as input data for the simulation of the pantograph-dynamic interaction at different speeds and with front or rear pantograph in operation. Consideration of structural modifications was then highlighted, in order to reduce the influence on the contact loss percentage.
Along with the increase of railway catenary system operation speed to 400 km/h, there have been growing demands for good quality current collection systems that satisfy quality standards as well as criteria for safe working. Retaining uniform elasticity tension of contact wires is essential in maintaining high quality contact between pantograph and OCL (Overhead Contact Line) of current collection systems in high speed railways. Therefore, the tension of contact wire must be kept within tight tolerance limits in both working conditions and adverse weather conditions of catenary system. In accordance with these conditions, this paper presents a real time monitoring system for the tensioning device of the newly installed catenary system on the special route of Honam high speed line for 400 km/h operation. For the verification of the true value of tension of contact wires, we have developed ring-type tensioning sensors which were installed on supporting points of mast which compose the catenary system. According to the field test performed on the Honam high speed line catenary system, variation of tension was measured accurately in real-time.
This paper presents a mettled to obtain line constants for a catenary system. To find them, voltages, currents and power factors according to frequencies were measured in short circuit and open circuit respectively. And front the measured data, resistances, inductances and capacitances were also calculated.
The transition section of the overhead rigid conductor rail (ORCR) consists of a direct induction device and a limit point to prevent the power supply failure and failure of the electric railway vehicle pantograph due to the difference of the uplift in the catenary line. In T-Bar transition section, a twin simple catenary is mostly installed between the overhead catenary system (OCS) in the ground section and the ORCR in the underground section. In this paper, we compare and analyze the possibility of replacing the twin simple catenary with heavy simple catenary. The reliability of numerical analysis results was confirmed by comparing field test with numerical results. Comparing the numerical results of the twin simple catenary with the heavy simple catenary in the transition section, the difference uplift is 5.9[mm] on average. When applying heavy simple catenary instead of twin simple catenary, the slight difference of uplift can be compensated by adjusting the height of hanger-ear or support bracket.
전차선은 철도 전기차량에 전기를 안정적으로 공급하기 위한 시설물로서, 차량이나 외부요인에 의한 전차선의 변형 및 파손을 검지하여 전기철도 시설물 규정에 따라 최적의 상태로 유지해야 할 필요성이 있다. 본 논문에서는 전차선 마킹을 위한 라인레이저와 고속카메라 간에 기하학적 구성을 이용하여 3차선 거리측정방식으로 전차선 높이와 편위를 측정하기 위한 시스템 개발에 관하여 기술하였다. 전차선 거리 측정방법은 이미지 상에 마킹된 전차선 프로파일의 픽셀위치를 삼각함수 기법을 적용하여 카메라와의 전차선간에 각도를 계산하였으며, 카메라는 랜즈 왜곡 및 심도, 원금감 등에 따라 측정대상에 대한 픽셀 해상도가 다르므로 전차선 위치변화에 따른 픽셀당 각도 분해능을 적용하였다. 또한 전차선은 조가선과 급전선등과 같은 다른 전기배선보다 가장 아래에 설비되어 있는 특징을 이용하여 FPGA 상에서 전차선에 마킹된 레이저 프로파일 데이터를 고속으로 추출하여 처리하였다. 개발시스템은 전차선 시설물 평가기준에 따라 전차선 높이, 편위 측정데이터를 실시간 분석하여 이상구간에 대한 실시간 자동화 진단기능을 수행토록 하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.