• Title/Summary/Keyword: Cast-In-Place Concrete Pile

Search Result 28, Processing Time 0.029 seconds

The Study on The Evaluation of The Ground Vibration of Cast in Place Concrete Pile Method Effect to Precision Equipment (현장타설 말뚝 공법의 지반진동이 정밀장비에 미치는 영향성 평가)

  • Hong, Byung-Kuk;Kim, Young-Chan;Jang, Kang-Seok;Yoon, Je-Won;Sim, Sang-Deok
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.04a
    • /
    • pp.97-102
    • /
    • 2011
  • The size of TV and TFT-LCD are bigger and bigger for the next generation exposure equipment install that existing fab are getting a lot of additions. When the new fab build an extension that the shortening of the construction and non-vibration are use cast in place concrete pile method. In this study when lay the foundation of existing fab adjoin use vibration monitoring system are rotator type all casing method among cast in place concrete pile method. The evaluation of ground vibration of rotator type all casing method effect to precision equipment and vibration area of influence.

  • PDF

A Study on Development of a Ground-Source Heat Pump System Utilizing Cast-in-place Concrete Pile Foundation of a Building (현장타설형 건물 기초를 이용한 지중열 공조시스템의 성능평가에 관한 연구)

  • Hwang, Suck-Ho;Nam, Yu-Jin
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.9
    • /
    • pp.641-647
    • /
    • 2010
  • Ground-source(Geothermal) heat pump(GSHP) systems can achieve a higher coefficient of performance than conventional air-source heat pump(ASHP) systems. However, GSHP systems are not widespread because of their expensive installation costs. The authors have developed a GSHP system that employs the cast-in-place concrete pile foundations of a building as heat exchangers in order to reduce the initial cost. In this system, eight U-tubes are arranged around the surface of a cast-in-place concrete pile foundation. The heat exchange capability of this system, subterranean temperature changes and heat pump performance were investigated in a full-scale experiment. As a result, the average values for heat rejection were 186~201 W/m(per pile, 25 W/m per pair of tubes) while cooling. The average COP of this system was 4.6 while cooling; rendering this system more effective in energy saving terms than the typical ASHP systems.

Mechanical Properties of Cement Material for Energy-Foundation (EF) Structures

  • Park, Yong-Boo;Choi, Hang-Seok;Sohn, Jeong-Rak;Sim, Young-Jong;Lee, Chul-Ho
    • Land and Housing Review
    • /
    • v.3 no.1
    • /
    • pp.83-88
    • /
    • 2012
  • In this study, physical characteristics of cement and/or concrete materials that are typically used for energy-foundation (EF) structures have been studied. The thermal conductivity and structural integrity of the cement-based materials were examined, which are commonly encountered in backfilling a vertical ground heat exchangers, cast-in-place concrete piles and concrete lining in tunnel. For this purpose the thermal conductivity and unconfined compression strength of cement-based materials with various curing conditions were experimentally estimated and compared. Hydration heat generated from massive concrete in the cast-in-place concrete energy pile was observed for 4 weeks to estimate its dissipation time in the underground. The hydration heat may mask the in-situ thermal response test (TRT) result performed in the cast-in-place concrete energy pile. It is concluded that at least two weeks are needed to dissipate the hydration heat in this case. In addition, a series of numerical analysis was performed to compare the effect of thermal property of the concrete material on the cast-in-place pile.

Shaft resistance of bored cast-in-place concrete piles in oil sand - Case study

  • Barr, L.;Wong, R.C.K.
    • Geomechanics and Engineering
    • /
    • v.5 no.2
    • /
    • pp.119-142
    • /
    • 2013
  • Pile load tests using Osterberg cells (O-cell) were conducted on cast-in-place concrete piles founded in oil sand fill and in situ oil sand at an industrial plant site in Fort McMurray, Alberta, Canada. Interpreted pile test results show that very high pile shaft resistance (with the Bjerrum-Burland or Beta coefficient of 2.5-4.5) against oil sand could be mobilized at small relative displacements of 2-3% of shaft diameter. Finite element simulations based on linear elastic and elasto-plastic models for oil sand materials were used to analyze the pile load test measurements. Two constitutive models yield comparable top-down load versus pile head displacement curves, but very different behaviour in mobilization of pile shaft and end bearing resistances. The elasto-plastic model produces more consistent matching in both pile shaft and end bearing resistances whereas the linear elastic under- and over-predicts the shaft and end bearing resistances, respectively. The mobilization of high shaft resistance in oil sand under pile load is attributed to the very dense and interlocked structure of oil sand which results in high matrix stiffness, high friction angle, and high shear dilation.

A Study on the Design of Bridge Foundation by Cast in Place Pile (현장타설말뚝에 의한 교량기초의 설계에 관한 연구)

  • Ahn, Jong-Pil;Yu, Deok-Cho;Lee, Jung-Ug;Lim, Jae-Choun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.767-774
    • /
    • 2008
  • The spot where bottom foundation of a marine bridge is constructed is deep in depth of water and a bedrock, bearing stratum, is very deeply distributed. So, I analyzed material of soil profile and then evaluate bearing capacity and safety of settlement when a stake of site construction is designed using a projection cast in place concrete pile and a sacrifice steel cast in place pile. Also, I analyzed and researched pratical affairs like a slime processing and plumbing maintenance in supervision of execution.

  • PDF

A Study on Development of a Ground-Source Heat Pump System Utilizing Pile Foundation of a Building (건물 기초를 이용한 지중열 공조시스템의 개발에 관한 연구 (1))

  • Ryozo, Ooka;Nam, Yu-Jin;Kentaro, Sekine;Mutsumi, Yokoi;Yoshiro, Shiba;Hwang, Suck-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.148-154
    • /
    • 2005
  • Ground-source (Geothermal) heat pump (GSHP) systems can achieve a higher coefficient of performance than conventional air-source heat pump (ASHP) systems. However, GSHP systems are not widespread in Japan because of their expensive boring costs. The authors have developed a GSHP system that employs the cast-in-place concrete pile foundations of a building as heat exchangers in order to reduce the initial boring cost. In this system, eight U-tubes are arranged around the surface of a cast-in-place concrete pile foundation. The heat exchange capability of this system, subterranean temperature changes and heat pump performance were investigated in a foil-scale experiment. As a result, the average values for heat rejection were 186${\sim}$201 W/m (for pile, 25 W/m per Pair of tubes) while cooling. The average COP of this system was 4.6 while cooling; rendering this system more effective in energy saving terms than the typical ASHP systems. The initial cost of construction per unit for heat extraction and rejection is ${\yen}$72/W for this system, whereas it is f300/W for existing standard borehole systems.

  • PDF

Flexural Capacity Evaluation of High-strength New-shape Composite Pile (S-Pile) for the Soldier Pile in the C.I.P Method (주열식공법 엄지말뚝을 위한 고강도 신형상 합성파일 (S-Pile)의 휨성능 평가)

  • Lee, Kyung-koo;Kim, Dae-Hee;Joo, Eun-Hee;Kim, Young-Gi;Kim, Bong-Chan;Lee, Ji-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.185-186
    • /
    • 2021
  • In Korea, many buildings are built with underground spaces and cast-in-place pile method is mostly applied in the temporary retaining walls for the underground space construction. A H-shaped steel section is generally embedded in the soldier pile in the C.I.P method. In this study, a new and economical section with high strength steel replacing the H-shaped section was proposed and its flexural capacity was evaluated experimentally. The new section is the concrete-filled composite section with pentagonal thin plate and thick flange plate. Test results showed that the proposed section has an excellent flexural strength and ductility.

  • PDF

Cutting of Concrete Block Using Detonating Cords (도폭선을 이용한 콘크리트 블록 절단 연구)

  • Kim, Jung-Gyu;Kim, Jong-Gwan
    • Explosives and Blasting
    • /
    • v.37 no.4
    • /
    • pp.17-25
    • /
    • 2019
  • The method to remove the head of the cast-in-place pile using the detonating cord and horizontal separation plate was proposed in this paper. Plain concrete block was fabricated. Through the blasting test of the concrete block, the charge weight and the burden required for cutting the pile head were identified. The degree of damage of concrete blocks after cutting the head was checked using AUTODYN 2D. As a result of the experiment, it was found that the concrete block was cut using the 10 g/m detonating cord and horizontal separation plate, and the directional cutting of the block using the horizontal separation plate and the block damage caused by the detonating cord were reduced.

An Analysis of Flexural Performance of Concrete Filled Soldier Pile Applied to Temporary Retaining Wall (흙막이 벽체에 적용하는 콘크리트 충전형 엄지말뚝의 휨성능 분석)

  • Park, Yong-Hyeon;Kim, Do-Bumn;Ju, Young-Kyu;Yang, Il-Seung;Yom, Kyong-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.3
    • /
    • pp.19-25
    • /
    • 2019
  • The purpose of this study was to evaluate bending performance of concrete filled soldier pile for temporary retaining wall. Structural performance tests were conducted on total number of four specimens. Each specimen had a unique characteristics with combination of the following variables, existence of reinforcing bar and locations of reinforcing steel plates. The results of this study were as follows; concrete filled steel tubes with being reinforced bar and flange rather than non-bar showed better performance. Higher yield, tensile strength and sufficient plastic strain were archived and maximum moment observed in experiments exceeded theoretical maximum moment in both allowable stress design and limit state design at all specimens.

A Numerical Study on the Estimation Method of the Results of Static Pile Load Test Using the Results of Bi-directional Pile Load Test of Barrette Piles (바렛말뚝의 양방향재하시험을 이용한 정적압축재하시험 결과 추정방법에 관한 수치해석적 연구)

  • Hong, Young-Suk;Yoo, Jae-Won;Kang, Sang-Kyun;Choi, Moon-Bong;Lee, Kyung-Im
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.1
    • /
    • pp.39-53
    • /
    • 2019
  • Bi-directional pile load test (briefly called 'BDH PLT') cannot be performed at loading levels where ultimate bearing capacity could be assessed in field, it is not possible to precisely determine both ultimate load and yield load and under loading. Since the load is transmitted separately to the skin and the end unlike the static pile load test (briefly called 'SPLT') and the direction of loading on the skin is opposite, such methods could have a result different from actual movements of shafts. In this study, three-dimensional finite element method (briefly called '3D FEM') analysis was conducted from results of the BDH PLT, made with barret piles, which were large-diameter cast-in-place concrete piles, and the calculated design constants were applied to the 3D FEM analysis of the SPLT to interpret them numerically and then, actual behaviors of cast-in-place concrete piles were estimated. First, using the results of the BDH PLT with cast-in-place concrete piles, behaviors of the piles made by loading upwards and downwards were analyzed to calculate load-displacement. Second, the design constants, calculated by the 3D FEM analysis and the back analysis, were applied on the 3D FEM analysis for the SPLT, and from these results, behaviors of the SPLT through the BDH PLT was analyzed. Last, the results of the 3D FEM analysis of the SPLT through the BDH PLT was expressed in relationships as {A ratio of bearing capacity of the SPLT and of the BDH PLT (y)} ~ {A ratio of reference displacement and pile circumference (x)}, and they were all classified by reference displacement at 10.0 mm, 15.0 mm, and 25.4 mm.